Contacts, documents and full notice history are available with a subscription.
Solicitation SBA Expired 4 notices 5 documents

LTUY232039 Replace Boiler with Heat Pump, Bldg 290 (DESIGN-BUILD) - CANCELLED W50S8K25RA003

Solicitation W50S8K25RA003 Copied Notice ID 1dd77616888949b89635937dbe75a0f5 Copied DEPT OF DEFENSE — W7NJ USPFO ACTIVITY MOANG 131
SAM.gov
Posted
Sep 24, 2025
Deadline
Sep 12, 2025
Set-aside
SBA
NAICS
238220
PSC
Z2AA

Summary

AI-generated · Aug 25, 2025

Replace the boiler in Building 290 with a centralized air-source heat pump system under a design-build contract. The contractor must design and install the new heating and cooling system, remove the existing hot-water boiler, pumps, and boiler-room piping, install seven occupancy sensors for offices, replace the domestic water heater, and install Direct Digital Controls to operate the new system, with any needed electrical upgrades. Provide all labor, materials, tools, equipment, transportation, and supervision; the work is 180 calendar days from notice to proceed, including inspections and a punch list. The project is a firm-fixed-price, non-personal contract set aside for small business, with an estimated budget around 150,000 and a construction magnitude between 100,000 and 250,000. A pre-proposal conference and site visit will be scheduled with the solicitation, and all official documents and attachments will be posted on SAM.gov; bidders must be SAM-registered.

New information in the awarded solicitation: Attachment #2, the Design Sustainability Scoresheet, is not uploaded to SAM and must be obtained by emailing the listed POCs to request a copy. This attachment access method is the new item noted in the current solicitation; the rest of the scope, requirements, and procurement framework remain as described.

The 131st Mission Support Group contracting office intends to issue a Request for Proposal (RFP) using Simplified Acquisition Procedures to award a single firm-fixed price contract for design-build services, non-personal, to provide all plant, labor, transportation, materials, tools, equipment, appliances, and supervison necessary for the replacement of the boiler system in Building 290 with an air-source heat pump. The primary objective of this project is to replace the existing hot water boiler, heating fan coil units, and window air conditioning units with a centralized energy efficient air source heat pump system. The selected contractor shall design and install the new heating and cooling system for Building 290, Jefferson Barracks Air National Guard Station (ANGS) via a Design-Build contract. The following items will be included in this project: - existing hotwater boiler, pumps, and piping within the boiler room are to removed - seven (7) lighting occupancy sensors for office spaces are to be installed replacing existing manual light switches - replace existing domestic water heater - install Direct Digital Controls (DDC) in order to operate the air source heating and cooling system - any required upgrades to the Building 290 facility's system, for example, electrical system, if required. The contract duration will be 180 calendar days after notice to proceed to include inspections and punch list, which is negotiable. This project is set aside 100% for small businesses. The North American Industry Classification System (NAICS) Code is 238220, with a small business size standard of $19 million. The magnitude of construction is between $100,000 and $250,000. The Government's budget for this project is $150,000. The tentative date for issuing the solicitation is on-or-about 14 August 2025. The solicitation will be posted earlier, if possible, after the mandatory 15 presolicitation notice period has passed. A pre-proposal conference and site visit will be scheduled when the solicitation is issued. Interested contractors are encouraged to attend and shall follow registration and base access requirements shown in the solicitation. Interested contractors must be registered in the System for Award Management (SAM). To register go to www.SAM.gov. Instructions for registering are on the web page (there is no fee for registration). The solicitation and associated information and the plans and specifications will be available only from the Contract Opportunities page at SAM.gov. In accordance with FAR 36.211(b), the following information is provided: (1) The National Guard has no agency-specific policies or procedures applicable to definitization of equitable adjustments for change orders under construction contracts other than those described at FAR 43.204, DFARS 243.204 and AFARS 5143.204. (2) Data for the prior 3 fiscal years regarding the time required to definitize equitable adjustments for change orders under construction contracts for the National Guard is currently not available but will be compiled and provided in future announcements. DISCLAIMER: The official solicitation and attachments will only be posted to SAM.gov and the Government is not liable for information furnished by any other source. If you are accessing this notice via a third-party non-Government website, you may not be seeing all available project information or attachments. Amendments, if/when issued will be posted to SAM.gov for electronic downloading. This will normally be the only method of distributing amendments prior to closing; therefore, it is the contractor s responsibility to check the website periodically for any amendments to the solicitation. Ensure you are viewing the latest version of the notice (see History section at bottom of webpage). Websites are occasionally inaccessible, due to various reasons. The Government is not responsible for any loss of Internet connectivity or for a contractor s inability to access the documents posted on the referenced web pages. The Government will not issue paper copies.

From Presolicitation posted on Jul 09, 2025

The primary objective of this project is to replace the existing hot water boiler, heating fan coil units, and window air conditioning units with a centralized energy efficient air source heat pump system. The selected contractor shall design and install the new heating and cooling system for Building 290, Jefferson Barracks Air National Guard Station (ANGS) via a Design-Build contract. The following items will be included in this project: - existing hotwater boiler, pumps, and piping within the boiler room are to removed - seven (7) lighting occupancy sensors for office spaces are to be installed replacing existing manual light switches - replace existing domestic water heater - install Direct Digital Controls (DDC) in order to operate the air source heating and cooling system - any required upgrades to the Building 290 facility's system, for example, electrical system, if required. The contract duration will be 180 calendar days after notice to proceed to include inspections and punch list, which is negotiable. This project is set aside 100% for small businesses. The North American Industry Classification System (NAICS) Code is 238220, with a small business size standard of $19 million. The magnitude of construction is between $100,000 and $250,000. The Government's budget for this project is $150,000. NOTE: To access Attachment #2 to the RFP, Design Sustainability Scoresheet, please email the POCs on this notice to request a copy. Due to file type, the document cannot be uploaded to SAM. In accordance with FAR 36.211(b), the following information is provided: (1) The National Guard has no agency-specific policies or procedures applicable to definitization of equitable adjustments for change orders under construction contracts other than those described at FAR 43.204, DFARS 243.204 and AFARS 5143.204. (2) Data for the prior 3 fiscal years regarding the time required to definitize equitable adjustments for change orders under construction contracts for the National Guard is currently not available but will be compiled and provided in future announcements. DISCLAIMER: The official solicitation and attachments will only be posted to SAM.gov and the Government is not liable for information furnished by any other source. If you are accessing this notice via a third-party non-Government website, you may not be seeing all available project information or attachments. Amendments, if/when issued will be posted to SAM.gov for electronic downloading. This will normally be the only method of distributing amendments prior to closing; therefore, it is the contractor s responsibility to check the website periodically for any amendments to the solicitation. Ensure you are viewing the latest version of the notice (see History section at bottom of webpage). Websites are occasionally inaccessible, due to various reasons. The Government is not responsible for any loss of Internet connectivity or for a contractor s inability to access the documents posted on the referenced web pages. The Government will not issue paper copies.

From Solicitation posted on Aug 08, 2025

The primary objective of this project is to replace the existing hot water boiler, heating fan coil units, and window air conditioning units with a centralized energy efficient air source heat pump system. The selected contractor shall design and install the new heating and cooling system for Building 290, Jefferson Barracks Air National Guard Station (ANGS) via a Design-Build contract. The following items will be included in this project: - existing hotwater boiler, pumps, and piping within the boiler room are to removed - seven (7) lighting occupancy sensors for office spaces are to be installed replacing existing manual light switches - replace existing domestic water heater - install Direct Digital Controls (DDC) in order to operate the air source heating and cooling system - any required upgrades to the Building 290 facility's system, for example, electrical system, if required. The contract duration will be 180 calendar days after notice to proceed to include inspections and punch list, which is negotiable. This project is set aside 100% for small businesses. The North American Industry Classification System (NAICS) Code is 238220, with a small business size standard of $19 million. The magnitude of construction is between $100,000 and $250,000. The Government's budget for this project is $150,000. NOTE: To access Attachment #2 to the RFP, Design Sustainability Scoresheet, please email the POCs on this notice to request a copy. Due to file type, the document cannot be uploaded to SAM. In accordance with FAR 36.211(b), the following information is provided: (1) The National Guard has no agency-specific policies or procedures applicable to definitization of equitable adjustments for change orders under construction contracts other than those described at FAR 43.204, DFARS 243.204 and AFARS 5143.204. (2) Data for the prior 3 fiscal years regarding the time required to definitize equitable adjustments for change orders under construction contracts for the National Guard is currently not available but will be compiled and provided in future announcements. DISCLAIMER: The official solicitation and attachments will only be posted to SAM.gov and the Government is not liable for information furnished by any other source. If you are accessing this notice via a third-party non-Government website, you may not be seeing all available project information or attachments. Amendments, if/when issued will be posted to SAM.gov for electronic downloading. This will normally be the only method of distributing amendments prior to closing; therefore, it is the contractor s responsibility to check the website periodically for any amendments to the solicitation. Ensure you are viewing the latest version of the notice (see History section at bottom of webpage). Websites are occasionally inaccessible, due to various reasons. The Government is not responsible for any loss of Internet connectivity or for a contractor s inability to access the documents posted on the referenced web pages. The Government will not issue paper copies. Update 5 September 2025: A PDF drawing of the building from a previus project has been added to files per contractor request. Associated CAD files are available, please email the POCs on this notice to be sent them. SAM.gov does not support uploading these files. DISCLAIMER: The Government does not guarantee the accuracy of these drawings and files. They are provided for informational purposes only and will not be incorporated into the contract. The Government does not have complete as-builts for this facility. If anyone need to view the site again to confirm existing site conditions prior to submitting a proposal, please contact the POCs on this notice to schedule.

From Solicitation posted on Sep 05, 2025

The primary objective of this project is to replace the existing hot water boiler, heating fan coil units, and window air conditioning units with a centralized energy efficient air source heat pump system. The selected contractor shall design and install the new heating and cooling system for Building 290, Jefferson Barracks Air National Guard Station (ANGS) via a Design-Build contract. The following items will be included in this project: - existing hotwater boiler, pumps, and piping within the boiler room are to removed - seven (7) lighting occupancy sensors for office spaces are to be installed replacing existing manual light switches - replace existing domestic water heater - install Direct Digital Controls (DDC) in order to operate the air source heating and cooling system - any required upgrades to the Building 290 facility's system, for example, electrical system, if required. The contract duration will be 180 calendar days after notice to proceed to include inspections and punch list, which is negotiable. This project is set aside 100% for small businesses. The North American Industry Classification System (NAICS) Code is 238220, with a small business size standard of $19 million. The magnitude of construction is between $100,000 and $250,000. The Government's budget for this project is $150,000. NOTE: To access Attachment #2 to the RFP, Design Sustainability Scoresheet, please email the POCs on this notice to request a copy. Due to file type, the document cannot be uploaded to SAM. In accordance with FAR 36.211(b), the following information is provided: (1) The National Guard has no agency-specific policies or procedures applicable to definitization of equitable adjustments for change orders under construction contracts other than those described at FAR 43.204, DFARS 243.204 and AFARS 5143.204. (2) Data for the prior 3 fiscal years regarding the time required to definitize equitable adjustments for change orders under construction contracts for the National Guard is currently not available but will be compiled and provided in future announcements. DISCLAIMER: The official solicitation and attachments will only be posted to SAM.gov and the Government is not liable for information furnished by any other source. If you are accessing this notice via a third-party non-Government website, you may not be seeing all available project information or attachments. Amendments, if/when issued will be posted to SAM.gov for electronic downloading. This will normally be the only method of distributing amendments prior to closing; therefore, it is the contractor s responsibility to check the website periodically for any amendments to the solicitation. Ensure you are viewing the latest version of the notice (see History section at bottom of webpage). Websites are occasionally inaccessible, due to various reasons. The Government is not responsible for any loss of Internet connectivity or for a contractor s inability to access the documents posted on the referenced web pages. The Government will not issue paper copies. Update 5 September 2025: A PDF drawing of the building from a previus project has been added to files per contractor request. Associated CAD files are available, please email the POCs on this notice to be sent them. SAM.gov does not support uploading these files. DISCLAIMER: The Government does not guarantee the accuracy of these drawings and files. They are provided for informational purposes only and will not be incorporated into the contract. The Government does not have complete as-builts for this facility. If anyone need to view the site again to confirm existing site conditions prior to submitting a proposal, please contact the POCs on this notice to schedule. Update 24 September 2025: This project has been cancelled for FY25.

From Solicitation posted on Sep 24, 2025

Notice history

4
  1. Presolicitation Posted Jul 09, 2025 View
  2. Solicitation Posted Aug 08, 2025
    • Description: Description was updated
    • Notice Type: PresolicitationSolicitation
    • Response Deadline: Not setSep 12, 2025
    • Set-Aside: NoneTotal Small Business Set-Aside (FAR 19.5)
  3. Solicitation Posted Sep 05, 2025
    • Description: Description was updated
  4. Solicitation LATEST Posted Sep 24, 2025
    • Title: LTUY232039 Replace Boiler with Heat Pump, Bldg 290 (DESIGN-BUILD)LTUY232039 Replace Boiler with Heat Pump, Bldg 290 (DESIGN-BUILD) - CANCELLED
    • Description: Description was updated

Details

Solicitation number W50S8K25RA003
Notice ID 1dd77616888949b89635937dbe75a0f5
Notice type Solicitation
Product / Service (PSC) Z2AA
NAICS 238220
Place of performance Saint Louis, Missouri
Archive date Sep 27, 2025

Award Information

Not yet awarded

Contacts

primary
MSgt Joe Bernier

Email

Phone

secondary
SMSgt Mark Phillips

Email

Phone

Agency

DEPT OF DEFENSE
DEPT OF THE ARMY
NATIONAL GUARD BUREAU
W7NJ USPFO ACTIVITY MOANG 131

Place of Performance

Saint Louis, Missouri 63125
USA

Dates

Posted Sep 24, 2025 10 months ago
Last Updated Aug 06, 2026 1 day ago
Due Sep 12, 2025 10 months ago