Lowell National Historical Park, Passenger Platforms Replacement and Track Repair Work 6913G626Q300004
Summary
AI-generated · Nov 21, 2025Repair and renew components of the Lowell National Historical Park trolley system at four passenger platforms: Swamp Locks, Mack Plaza (Visitor Center), Moody Street Feeder House, and Suffolk. The contractor shall provide all labor, materials, tools, and equipment to repair the trolley tracks in these areas, replace ties from the heel block at the switch to the last line tie (Suffolk to Wye track section), replace the platforms including all supporting structures at each station, and replace the wood fence at Mack Plaza Station. This work supports ongoing operation of the 2-mile system, addressing end-of-life components and enhancing preventative maintenance.
Lowell National Historical Park s (LNHP s) 2-mile trolley system has been in operation for 30 years in its current form. The trolley system is a small remnant of the historic trolley system from the era of the mills at the LNHP site. While the trolley system is currently in a general state of good repair, portions of the trolley system are reaching their end-of-life in which critical component renewals will be needed in addition to enhanced preventative maintenance activities. The Contractor shall provide all labor, material, tools, and equipment to repair trolley tracks in way of four passenger platforms [Swamp Locks Station, Mack Plaza Station (Visitor Center), Moody Street Feeder House Station, and Suffolk Station]; replace ties from the heel block at switch to the last line tie (Suffolk to Wye track section); replace platforms, including all supporting structure, at each station; and replace the wood fence at Mack Plaza Station.
From Solicitation posted on Nov 20, 2025Lowell National Historical Park s (LNHP s) 2-mile trolley system has been in operation for 30 years in its current form. The trolley system is a small remnant of the historic trolley system from the era of the mills at the LNHP site. While the trolley system is currently in a general state of good repair, portions of the trolley system are reaching their end-of-life in which critical component renewals will be needed in addition to enhanced preventative maintenance activities. The Contractor shall provide all labor, material, tools, and equipment to repair trolley tracks in way of four passenger platforms [Swamp Locks Station, Mack Plaza Station (Visitor Center), Moody Street Feeder House Station, and Suffolk Station]; replace ties from the heel block at switch to the last line tie (Suffolk to Wye track section); replace platforms, including all supporting structure, at each station; and replace the wood fence at Mack Plaza Station.
From Solicitation posted on Dec 11, 2025Notice history
2-
Solicitation Posted Nov 20, 2025
-
Solicitation LATEST Posted Dec 11, 2025No changes from previous notice
Details
Award Information
Not yet awarded
Documents
9Contacts
Agency
Place of Performance
USA