Contacts, documents and full notice history are available with a subscription.
Solicitation SBA Expired 7 notices 11 documents

Lovell Well Construction Project 1240LT25R0022

Solicitation 1240LT25R0022 Copied Notice ID 1898d0e6d0164d62b2058bee2872baef Copied AGRICULTURE, DEPARTMENT OF — USDA-FS, CSA INTERMOUNTAIN 8
SAM.gov
Posted
Aug 09, 2025
Deadline
Aug 15, 2025
Set-aside
SBA
NAICS
237110
PSC
Y1NE

Summary

AI-generated · Aug 24, 2025

Drilling a new potable water well at Mountain Springs in the Spring Mountains National Recreation Area, Humboldt-Toiyabe National Forest. Work includes mobilization, well drilling, casing, grout, screen, accessories, developing, performance testing, and water analysis, with permits considered incidental. An optional abandonment of the well (Optional Item #332100-10) may be awarded; quantities for options are in the Schedule of Items. The site is in Clark County, NV, with access from State Highway 160 and Lovell Canyon Road, and conditions require closing the site to the public, coordinating temporary power, providing porta-potty facilities, and implementing traffic control per MUTCD. The contractor must manage site staging areas, protect streams, prevent the spread of noxious weeds, and arrange for any necessary utilities not available at the site; payments will not be made separately for these incidental items, and bid bonds (20%) and performance and payment bonds (100%) are required.

Recent updates add a site visit sign-in sheet and multiple Questions and Answers attachments (001–003), and an amendment requiring bidder acknowledgment while extending the solicitation due date. Bidders should review the full solicitation and attachments for details on the schedule of items, submittal procedures, quality control, environmental and erosion controls, waste disposal, clearing and grubbing, and all other requirements.

This is a PRESOLICITATION announcement. The solicitation is anticipated to be posted to Contract Opportunities on SAM.gov on or around July 7 , 2025. No responses are required at this time. SCOPE OF CONTRACT A. This project includes drilling a new potable water well at Mountain Springs on the Spring Mountains National Recreation Area on the Humboldt-Toiyabe National Forest. The project is identified in the schedule of items. The drawings and specifications provide more definition of the work required under each work item. B. The work includes mobilization, well drilling, well casing, concrete grout, well screen, well accessories, developing well, well performance testing, and water analysis. Permits are considered incidental and will not be paid for separately. C. Optional work that may be awarded includes all work described above associated with: Optional Item #332100-10: Abandonment of Well (See Schedule of Items). D. Quantities associated with these options are identified in the Schedule of Items. PROJECT LOCATION The project is located in the Spring Mountains National Recreation Area of the Humboldt-Toiyabe National Forest, Clark County, Nevada, in T22S, R58E, 21. It is located approximately 21 miles west of Las Vegas, NV and 15 miles south of Pahrump, NV. The project may be accessed from State Highway 160 and Lovell Canyon Road. MAGNITUDE OF CONSTRUCTION PROJECT In accordance with FAR 36.204 (d), the estimated magnitude for this project is between $250,000 and $500,000. SITE INFORMATION AND LIMITATIONS A. The following site conditions are considered incidental to the contract and the contractor will not be paid directly for any of the following items: Construction sites will be closed to the public during construction. The Contractor will be responsible for signing and limiting public access. Contractor will provide all materials and labor necessary to protect streams, wet or dry, during construction activities. All construction equipment shall be pressure washed before entering National Forest System lands. The removal of mud and debris from treads, tracks and undercarriage, with emphasis on axles, frame, cross-members, motor mounts, and underneath steps, running boards, and front bumper/brushguard assemblies will be required. The purpose is to reduce or eliminate the transportation of noxious weeds, which is required by Federal and State regulations. Water is not available at the site for construction purposes. Utilities are not available at the site for construction purposes. The Contractor will be responsible for coordinating the installation of temporary power for the site and the cost for the service. The Contractor shall provide temporary toilet facilities (porta-potty) at the site during all construction work. TRAFFIC CONTROL AND CONSTRUCTIN SIGNING No work that endangers, interferes, or conflicts with traffic or access to work sites shall be performed until a plan for satisfactory warning and handling of traffic has been submitted by the contractor and approved by the COR and Nevada Department of Transportation. Construction signing for traffic control shall conform to the Manual of Uniform Traffic Control Devices (MUTCD). All traffic control signs will be placed in areas adequate for a truck pulling a fifth wheel trailer to be turned around. Contractor shall not be paid directly for this item, rather it will be considered incidental to other items of work listed in the Schedule of Items. WORK CAMPS, STAGING AND STORAGE AREAS A. Areas for staging operations and storage of materials shall be approved by the CO. The Contractor must request in writing for approval from the CO to stage trailers (work) on site. B. No overnight camping will be allowed on site. INSPECTION OF WORKSITE The contractor acknowledges they have taken the necessary steps to ascertain the nature and location of work and have investigated and satisfied themselves as to the general and local conditions that can affect the work or its cost. Any failure of the contractor to take the actions described and acknowledged in this paragraph will not relieve the Contractor from the responsibility of estimating properly the difficulty and cost of successfully performing the work, or for proceeding to successfully perform the work without additional expenses to the government. START DATE Estimated start date is 9/2/2025. . A site visit will be detailed on the full solicitation. CONTRACT TIME A. Base: 60 Calendar Days from issuance of Construction Notice To Proceed B. Option #1: 7 Additional Calendar Days SPECIFICATIONS A. The following specifications are attached. Some sections in the schedule of items refer to other sections not listed and are subsidiary to or are included in payment for other pay items in this contract. These items are considered incidental, and no additional compensation will be made. SECTION 011250 - MEASUREMENT AND PAYMENT SECTION 011900 - MOBILIZATION SECTION 013300 - SUBMITTAL PROCEDURES SECTION 014100 - QUALITY CONTROL SECTION 023701 - SEDIMENT AND EROSION CONTROL MEASURES SECTION 024100 - WASTE MATERIAL DISPOSAL SECTION 311000 - CLEARING AND GRUBBING SECTION 332100 - WATER SUPPLY WELLS BONDING: All offerors will be required to provide a Bid Bond (20%) with their proposal submission. Performance and Payment Bonds (100% each) will be required of the successful awardee.

From Presolicitation posted on Jun 20, 2025

Humboldt Toiyabe National Forest Lovell Well Construction Project This is a solicititation for the above project. The scope of work is described below. Please view the attachments for the full solicitation and supporting documents. SCOPE OF CONTRACT A. This project includes drilling a new potable water well at Mountain Springs on the Spring Mountains National Recreation Area on the Humboldt-Toiyabe National Forest. The project is identified in the schedule of items. The drawings and specifications provide more definition of the work required under each work item. B. The work includes mobilization, well drilling, well casing, concrete grout, well screen, well accessories, developing well, well performance testing, and water analysis. Permits are considered incidental and will not be paid for separately. C. Optional work that may be awarded includes all work described above associated with: 1. Optional Item #332100-10: Abandonment of Well (See Schedule of Items). D. Quantities associated with these options are identified in the Schedule of Items. Please read the full solictitation in the attachments for all details.

From Solicitation posted on Jul 07, 2025

***This update adds the site visit sign in sheet, as an attachment. - 7/18/2025*** Humboldt Toiyabe National Forest Lovell Well Construction Project This is a solicititation for the above project. The scope of work is described below. Please view the attachments for the full solicitation and supporting documents. SCOPE OF CONTRACT A. This project includes drilling a new potable water well at Mountain Springs on the Spring Mountains National Recreation Area on the Humboldt-Toiyabe National Forest. The project is identified in the schedule of items. The drawings and specifications provide more definition of the work required under each work item. B. The work includes mobilization, well drilling, well casing, concrete grout, well screen, well accessories, developing well, well performance testing, and water analysis. Permits are considered incidental and will not be paid for separately. C. Optional work that may be awarded includes all work described above associated with: 1. Optional Item #332100-10: Abandonment of Well (See Schedule of Items). D. Quantities associated with these options are identified in the Schedule of Items. Please read the full solictitation in the attachments for all details.

From Solicitation posted on Jul 18, 2025

***This update adds Questions and Answers (001) as an attachment - 7/21/2025*** ***This update adds the site visit sign in sheet, as an attachment. - 7/18/2025*** Humboldt Toiyabe National Forest Lovell Well Construction Project This is a solicititation for the above project. The scope of work is described below. Please view the attachments for the full solicitation and supporting documents. SCOPE OF CONTRACT A. This project includes drilling a new potable water well at Mountain Springs on the Spring Mountains National Recreation Area on the Humboldt-Toiyabe National Forest. The project is identified in the schedule of items. The drawings and specifications provide more definition of the work required under each work item. B. The work includes mobilization, well drilling, well casing, concrete grout, well screen, well accessories, developing well, well performance testing, and water analysis. Permits are considered incidental and will not be paid for separately. C. Optional work that may be awarded includes all work described above associated with: 1. Optional Item #332100-10: Abandonment of Well (See Schedule of Items). D. Quantities associated with these options are identified in the Schedule of Items. Please read the full solictitation in the attachments for all details.

From Solicitation posted on Jul 21, 2025

***This update adds Questions and Answers (002) as an attachment - 7/28/2025*** ***This update adds Questions and Answers (001) as an attachment - 7/21/2025*** ***This update adds the site visit sign in sheet, as an attachment. - 7/18/2025*** Humboldt Toiyabe National Forest Lovell Well Construction Project This is a solicititation for the above project. The scope of work is described below. Please view the attachments for the full solicitation and supporting documents. SCOPE OF CONTRACT A. This project includes drilling a new potable water well at Mountain Springs on the Spring Mountains National Recreation Area on the Humboldt-Toiyabe National Forest. The project is identified in the schedule of items. The drawings and specifications provide more definition of the work required under each work item. B. The work includes mobilization, well drilling, well casing, concrete grout, well screen, well accessories, developing well, well performance testing, and water analysis. Permits are considered incidental and will not be paid for separately. C. Optional work that may be awarded includes all work described above associated with: 1. Optional Item #332100-10: Abandonment of Well (See Schedule of Items). D. Quantities associated with these options are identified in the Schedule of Items. Please read the full solictitation in the attachments for all details.

From Solicitation posted on Jul 28, 2025

***This update adds Questions and Answers (003) as an attachment - 7/30/2025*** ***This update adds Questions and Answers (002) as an attachment - 7/28/2025*** ***This update adds Questions and Answers (001) as an attachment - 7/21/2025*** ***This update adds the site visit sign in sheet, as an attachment. - 7/18/2025*** Humboldt Toiyabe National Forest Lovell Well Construction Project This is a solicititation for the above project. The scope of work is described below. Please view the attachments for the full solicitation and supporting documents. SCOPE OF CONTRACT A. This project includes drilling a new potable water well at Mountain Springs on the Spring Mountains National Recreation Area on the Humboldt-Toiyabe National Forest. The project is identified in the schedule of items. The drawings and specifications provide more definition of the work required under each work item. B. The work includes mobilization, well drilling, well casing, concrete grout, well screen, well accessories, developing well, well performance testing, and water analysis. Permits are considered incidental and will not be paid for separately. C. Optional work that may be awarded includes all work described above associated with: 1. Optional Item #332100-10: Abandonment of Well (See Schedule of Items). D. Quantities associated with these options are identified in the Schedule of Items. Please read the full solictitation in the attachments for all details.

From Solicitation posted on Jul 30, 2025

***** This solicitation has been amended. The details of the amendment may be found in attachment (0.1 1240LT25R0022 Amendment 0001). Details of the amendment may be found in box 14. of the attachment. This amendment must be acknowledged. This can be accomplished by completing section 19 on the SF-1442 or by submitting the signed SF-30 mentioned above with your price proposal. The offer due date is unchanged.***** **** The due date for offers is being extended to 8/15/2025, at 12:00 p.m. Mountain Time. Interested parties are reminded to carefully read section L.2 of the Solicitation to ensure you are providing all required documentation. **** ***This update adds Questions and Answers (003) as an attachment - 7/30/2025*** ***This update adds Questions and Answers (002) as an attachment - 7/28/2025*** ***This update adds Questions and Answers (001) as an attachment - 7/21/2025*** ***This update adds the site visit sign in sheet, as an attachment. - 7/18/2025*** Humboldt Toiyabe National Forest Lovell Well Construction Project This is a solicititation for the above project. The scope of work is described below. Please view the attachments for the full solicitation and supporting documents. SCOPE OF CONTRACT A. This project includes drilling a new potable water well at Mountain Springs on the Spring Mountains National Recreation Area on the Humboldt-Toiyabe National Forest. The project is identified in the schedule of items. The drawings and specifications provide more definition of the work required under each work item. B. The work includes mobilization, well drilling, well casing, concrete grout, well screen, well accessories, developing well, well performance testing, and water analysis. Permits are considered incidental and will not be paid for separately. C. Optional work that may be awarded includes all work described above associated with: 1. Optional Item #332100-10: Abandonment of Well (See Schedule of Items). D. Quantities associated with these options are identified in the Schedule of Items. Please read the full solictitation in the attachments for all details.

From Solicitation posted on Aug 09, 2025

Notice history

7
  1. Presolicitation Posted Jun 20, 2025 View
  2. Solicitation Posted Jul 07, 2025
    • Description: Description was updated
    • Notice Type: PresolicitationSolicitation
  3. Solicitation Posted Jul 18, 2025
    • Description: Description was updated
  4. Solicitation Posted Jul 21, 2025
    • Description: Description was updated
  5. Solicitation Posted Jul 28, 2025
    • Description: Description was updated
  6. Solicitation Posted Jul 30, 2025
    • Description: Description was updated
  7. Solicitation LATEST Posted Aug 09, 2025
    • Description: Description was updated
    • Response Deadline: Aug 07, 2025Aug 15, 2025

Details

Solicitation number 1240LT25R0022
Notice ID 1898d0e6d0164d62b2058bee2872baef
Notice type Solicitation
Product / Service (PSC) Y1NE
NAICS 237110
Place of performance Nevada
Archive date Aug 30, 2025

Award Information

Not yet awarded

Contacts

primary
Tony Taylor - Contract Specialist

Email

secondary
Kevin Wilmot

Email

Agency

AGRICULTURE, DEPARTMENT OF
FOREST SERVICE
USDA-FS, CSA INTERMOUNTAIN 8

Place of Performance

Nevada
USA

Dates

Posted Aug 09, 2025 11 months ago
Last Updated Aug 06, 2026 1 day ago
Due Aug 15, 2025 11 months ago