Contacts, documents and full notice history are available with a subscription.
Presolicitation Expired 2 notices

Intent to Sole Source - Long Lead Time Material (LLTM) Procurement in Support of Repair, Maintenance and Modernization - US Navy Surface Ships N0002425F4436

Solicitation N0002425F4436 Copied Notice ID 4bbe9451356d4cf9a2ac77c7a4cfce2c Copied DEPT OF DEFENSE — NAVSEA HQ
SAM.gov
Posted
Aug 18, 2025
Deadline
Sep 02, 2025
Set-aside
None
NAICS
541330
PSC
J019

Summary

AI-generated · Aug 24, 2025

Identify sources capable of procuring, receiving, storing, and shipping long lead time materials (LLTM) for maintenance, repair, and modernization of Navy surface ships (multiple classes). The effort would cover LLTM sourcing, shipment tracking, inventory warehousing, and coordination of shipments to Navy regional maintenance centers and private shipyards, with all necessary quality assurance throughout procurement, receipt, storage, and shipping. The government is considering a Basic Ordering Agreement with a base year plus two option years; proposals should include a capabilities and capacity statement detailing in-house versus subcontracted resources, infrastructure to handle large LLTM volumes, project management controls, and key personnel, plus evidence of facilities to warehouse LLTM at the Navy’s regional maintenance centers (and whether those facilities can support each center). Past performance, financial capability, and specific examples of LLTM experience (including materials, volumes, locations, and points of contact) are required. Submissions are limited to a defined page count and must be sent through approved electronic channels; this is market research, not a solicitation or award.

NAVSEA has issued a presolicitation indicating an intent to award a sole-source Basic Ordering Agreement to Q.E.D. Systems, Inc. to identify sources, procure, receive, store, and ship LLTM for the same ship classes, with warehousing near the Navy’s Regional Maintenance Centers to enable rapid, real-time QA and coordination. Q.E.D. would perform LLTM research, source and price identified items, and provide the necessary labor, facilities, and QA. Although this is not a competitive solicitation, the government will consider exceptions to sole source if received by the stated deadline. Submissions should demonstrate bona fide capability to fulfill the requirement, and all materials will be designated for Government use with access by designated NAVSEA support contractors under NDA.

INTRODUCTION This is a Sources Sought announcement in accordance with FAR 15.201 in anticipation of a potential future procurement program. The Naval Sea Systems Command (NAVSEA), Washington DC, is conducting market research and seeking information from potential sources able to procure, receive, store and ship long lead time materials (LLTM) associated with ship maintenance, repair and modernization availabilities completed on DDG-51, DDG-1000, CG, LCS, LPD, LSD, LHA and LHD class ships. BACKGROUND The NAVSEA Surface Warfare Directorate, SEA 21, is responsible for life-cycle management for all non-nuclear surface ship classes of the U.S. Navy including Surface Combatant Warfare Class Ships. In-service life cycle support of these ships comprises: integrated planning, programming, and execution of the maintenance and fleet modernization program, including the provision of all technical and logistics support required to maintain, modernize, and improve performance of the ships. REQUIREMENT NAVSEA is seeking contractors capable of completing expert services related to the procurement of LLTM for the aforementioned surface class ships. The scope associated with the Sources Sought notice includes, but is not limited to: Identify sources of LLTM Procurement of LLTM Tracking shipments of LLTM Inventory requirements/warehousing, maintaining and storage of LLTM Coordinating shipments from contractor facilities to both U.S. Navy and private shipyard facilities (coastwide) All quality assurance necessary for the procurement, receipt storage and shipment of LLTM. ACQUISITION STRATEGY The Government is contemplating procuring this effort utilizing a Basic Ordering Agreement (BOA), with an ordering period duration of one 12-month base year and two 12-month option years. CAPABILITIES AND CAPACITY STATEMENT Interested parties shall submit a comprehensive Capabilities and Capacity Statement that describes the firm s capabilities and capacity to meet the Government s requirements, including the following: (1) Positive statement of intent to bid as a prime contractor for the requirement. (2) An outline of resources available to accomplish the proposed contract. Submittals must clearly distinguish in-house resources from sub-contracted resources and include the following areas: Infrastructure and organization sufficient to procure, receive, store and ship substantial volumes of LLTM; implement project management controls; execute significant multi-tasking; and control costs. Key Personnel: identify appropriate levels and types of expertise in a manner that demonstrates understanding of the requirements. Interested parties shall address the following positions: Program Manager, Contract Manager, Quality Assurance Manager, Quality Assurance Specialists, Logisticians (including Integrated Logistic Support, Provisioning support, Material and Warehousing Logisticians, etc.). Identify all property, equipment, and facilities necessary to procure, receive, store and ship LLTM to support material requirements for each of the Navy s regional maintenance centers. Locations would include: Mid-Atlantic Regional Maintenance Center Norfolk, VA, Southeast Regional Maintenance Center Mayport, FL, Southwest Regional Maintenance Center San Diego, CA, Northwest Regional Maintenance Center Bremerton, Washington and Hawaii Regional Maintenance Center Pearl Harbor, HI. Please identify if your firm has the current facilities to warehouse and store LLTM to cover each of the Navy s regional maintenance centers. Provide relevant examples of a quality system defining the capability and approach to ensure quality assurance for all procured LLTM. Does your company have experience completing quality assurance on the LLTM typically associated with naval vessel maintenance, repair and modernization availabilities? Does your company have adequate financial resources to perform the requirements, or the ability to obtain them? Past Performance: Provide relevant past performance information including previous contracts performed in the last five (5) years. The information provided for each named contract shall include: types and amounts of materials procured and managed per year, dollar value, location, and Point(s) of Contact (including name, title, phone number and email address), d. If the work was accomplished as a prime contractor, please indicate the percentage of work, if any that was subcontracted. If the work was performed as a subcontractor, indicate the percentage and dollar value of the work performed. If the interested party has no relevant experience on U.S. Navy Surface Fleet Vessels, projects on other Government vessels and private industry projects may be submitted. If the past performance information submitted is for effort other than that provided in support of U.S. Naval Surface Fleet Vessels, explain (no more than 1-page in length) how that experience will enable the firm to successfully meet the requirements of the contemplated contract(s). The Government is not requesting interested parties to provide brochures and/or generalized sales-pitch language. Capability and capacity statements shall be specific (quantified as appropriate) and not theoretical in nature to the greatest extent practical. Specifically, parties are requested to provide the following information (as applicable): Company Name, Company address, Primary company contacts(s) and associated email addresses, Company website, Business size (small or large) for NAICS code (336611) Company s socioeconomic status (Woman-Owned, Veteran-Owned, HUBZone, etc.), Company CAGE code and UEI number, and Any other information deemed applicable by the interested party. SUBMISSION DETAILS: A PARTY S SUBMISSION SHALL NOT EXCEED MORE THAN 20 DOC (MS Word) OR PDF PAGES IN LENGTH AND BE NO LARGER THAN 7.5GB. Parties are responsible for adequately marking proprietary and/or competition sensitive information that is contained within their submission. A party s submission shall be delivered electronically either via encrypted email to Kevin Becker (kevin.r.becker2.civ@us.navy.mil) and Kathryn Corvello (kathryn.f.corvello.civ@us.navy.mil) or via drop on DOD SAFE. If a party chooses the drop on DOD SAFE option, the party shall coordinate the drop with Kevin Becker and Kathryn Corvello, whereby one of them will provide a DOD SAFE link for the drop. The due date for submission is 31 July 2025 at 1500 EST. DISCLAIMER: This RFI is for Navy/information/planning purposes only. This announcement is not a request for proposal; it does not constitute any form of solicitation and shall not be construed as a commitment by the Navy. A party submission is not an offer nor proposal and the Navy is under no obligation to make any form of award as a result of this announcement. No funds will be provided by the Navy to pay for the preparation of submission in response to this announcement. All responses to this RFI are strictly voluntary. All submitted materials will be designated for Government Use Only. Third party support contractors providing support to NAVSEA Surface Warfare Directorate, SEA 21, will have access to the submitted material. These contractors have executed non-disclosure agreements with SEA 21. Submission of material requested in this sources sought announcement shall constitute consent to allow access to the material/information by any relevant third-party support contractor supporting SEA 21. Submitted material/information will be safeguarded in accordance with the applicable Government regulations.

From Sources Sought posted on Jul 17, 2025

Naval Sea Systems Command (NAVSEA) intends to award a sole source contracting action to Q.E.D Systems, Inc. (Q.E.D.) to establish a Basic Ordering Agreement (BOA) to identify sources, procure, receive, store and ship long lead time material (LLTM) associated with ship maintenance, repair and modernization availabilities completed on CG, DDG-51, DDG-1000, LCS, LHA, LHD, LPD, and LSD class ships. The scope of this contemplated BOA includes all labor, supervision, equipment, facilities, and quality assurance necessary for the identification of sources, procurement, receipt, storage and shipment of LLTM. Additional requirements include providing warehouse facilities to store and coordinate shipment of LLTM supporting specific Navy Regional Maintenance Centers (Mid-Atlantic Regional Maintenance Center Norfolk, VA, Southeast Regional Maintenance Center Mayport, FL, Southwest Regional Maintenance Center San Diego, CA, Northwest Regional Maintenance Center Bremerton, WA and Hawaii Regional Maintenance Center Pearl Harbor, HI). Q.E.D., as the Specification Development and Availability Execution Support contract holder, provides specification development support services for ship maintenance, repair and modernization availabilities completed on CG, DDG-51, DDG-1000, LCS, LHA, LHD, LPD, and LSD class ships. As part of their overarching planning scope, Q.E.D. is required to provide extensive LLTM research at the work item level. To fulfil their requirements regarding LLTM research scope, Q.E.D. must source, validate availability, and price (when applicable) for each material item they identify as part of each work package requirement. Awarding the LLTM procurement scope to any contractor other than Q.E.D. would result in a duplication of the material sourcing, validation, and pricing efforts and create substantial additional costs. Moreover, Q.E.D. s personnel and warehousing facilities are co-located near the Navy s Regional Maintenance Centers (RMCs), enabling rapid receipt, inspection, and delivery of LLTM to the waterfront. This proximity supports real-time quality assurance, quick resolution of discrepancies, and responsive coordination with RMC staff. Q.E.D. s local footprint ensures timely, accurate LLTM support aligned with high-tempo availability execution and is essential to avoiding unacceptable delays in meeting Navy maintenance requirements. This notice of intent is not a request for competitive proposals. However, all responsible sources may submit an exception to the intent to purchase on a sole source basis, which shall be considered by the Government if received by the response due date as specified in this notice. Written responses to this synopsis shall contain sufficient documentation to establish a bona fide capability to fulfill the requirement. A determination not to compete this requirement, based upon response to this notice, is solely within the discretion of the Government. NAVSEA will not be responsible for any costs incurred by interested parties in responding to this notice. The Government is not obligated to and will not pay for any information received from potential sources as a result of this synopsis. Questions concerning this sole source acquisition may be directed in writing to the contract's points of contact as provided in this notice. All submitted materials will be designated for Government Use Only. Third party support contractors providing support to NAVSEA Surface Warfare Directorate, SEA 21 will have access to the submitted material. These contractors have executed non-disclosure agreements with SEA 21. Submission of material in response to this synopsis shall constitute consent to allow access to the material/information by any relevant third-party support contractor supporting SEA 21. Submitted material/information will be safeguarded in accordance with the applicable Government regulations.

From Presolicitation posted on Aug 18, 2025

Notice history

2
  1. Sources Sought Posted Jul 17, 2025 View
  2. Presolicitation LATEST Posted Aug 18, 2025
    • Title: Long Lead Time Material (LLTM) Procurement in Support of Repair, Maintenance and Modernization - US Navy Surface ShipsIntent to Sole Source - Long Lead Time Material (LLTM) Procurement in Support of Repair, Maintenance and Modernization - US Navy Surface Ships
    • Description: Description was updated
    • Notice Type: Sources SoughtPresolicitation
    • Response Deadline: Jul 31, 2025Sep 02, 2025

Details

Solicitation number N0002425F4436
Notice ID 4bbe9451356d4cf9a2ac77c7a4cfce2c
Notice type Presolicitation
Product / Service (PSC) J019
NAICS 541330
Place of performance Washington Navy Yard, District of Columbia
Archive date Sep 17, 2025

Award Information

Not yet awarded

Documents

No files available

View on SAM.gov

Contacts

primary
Kathryn Corvello, Contracting Officer

Email

Phone

secondary
Kevin Becker

Email

Phone

Agency

DEPT OF DEFENSE
DEPT OF THE NAVY
NAVSEA
NAVSEA HQ
NAVSEA HQ

Place of Performance

Washington Navy Yard, District of Columbia 20376
USA

Dates

Posted Aug 18, 2025 11 months ago
Last Updated Aug 06, 2026 1 day ago
Due Sep 02, 2025 11 months ago