Little Rock AFB Base Pavements IDIQ FY25 - Amendment 7 FA446025R0002
Summary
AI-generated · Aug 24, 2025Perform base pavements maintenance and repair at Little Rock AFB under an IDIQ to support the 19th Civil Engineer Squadron. Tasks are defined in individual orders and cover airfield and civil works projects, including markings (temporary and permanent), erosion control, joint sealing, spall repair, bitumen seal coats, crack repair, rubber removal, friction testing, removal/stockpiling of concrete and asphalt pavements, milling and disposal or stockpiling of milled material, placement and grading of crushed concrete and asphalt millings, new concrete pavements, runway groove work, tiedown installations, subdrains, drainage and grading to meet airfield criteria, landscaping (seeding/sodding), GIS/As-Built drawings, SWPPP compliance to LRAFB/ADEQ standards, demolition of pavement and structures, ABA ramps and handrails, site work (excavation, grading, clearing, tree work), landscape establishment, joint sealant, slurry seals, bollards, and related roadwork, traffic control, and associated infrastructure. Work is issued by task orders and may require multiple phases to minimize disruption to base operations.
Amendment updates: a questions deadline was established, and site-visit sign-in sheets are posted for reference only and not part of the contract. A subsequent amendment clarifies that questions are to be submitted by email to designated POCs and that Q&A will be posted in an amendment.
Base Pavements Indefinite-Delivery Indefinite-Quantity (IDIQ) Little Rock Air Force Base (LRAFB) for maintenance and repair components on airfield pavements and civil works construction projects in support of the 19th Civil Engineer Squadron (19 CES). Construction projects to be performed under base pavements consist of but are not limited to temporary and permanent airfield markings, install erosion control measures, seal joints, spall repair, bitumen seal coats, random crack repair, rubber removal, friction testing, remove and disposal of concrete pavements, remove, crush, and stockpile concrete pavements, asphalt cold milling and disposal of milled material, asphalt cold milling and stockpile milled material, placing, grading, and compacting government provided crushed concrete and asphalt millings, construction of new concrete pavements, groove the runway surface, install new tiedowns in new or existing pavement, placing hot mix asphalt, install subdrains, grading airfield areas to meet airfield criteria, hydroseed and or sod disturbed areas, GIS and As-Built drawings, SWPPP implementation to LRAFB and ADEQ Standards, demolition of concrete, asphalt and various structures, concrete work, Architectural Barriers Act (ABA) Ramps, handrails, and site work, site work to include excavation to grade, grading, compacting, various materials, clearing and grubbing, selective tree cutting, and demolition, landscape establishment to include topsoil, trees, sodding, seeding, concrete joint sealant, asphalt maintenance to include crack sealant, and slurry seal, bollard installation, valve, meter, hydrants adjustments, AHTD Standards Roadway Construction, asphalt construction, asphalt cold milling, roadway maintenance of traffic and traffic control devices, LRAFB, AHTD, and FHWA pavement markings and signage, culvert installation, modifications, and safety end sections, drop inlet, curb inlet, junction box repair, adjustments, installation and modifications, underdrain installation, concrete steps, concrete sidewalks, and traffic detection loop installation and repair. Description of work will be identified in each individual task order. Individual task orders may require the project to be completed in multiple phases in order to facilitate base operations.
From Solicitation posted on Jul 30, 2025Base Pavements Indefinite-Delivery Indefinite-Quantity (IDIQ) Little Rock Air Force Base (LRAFB) for maintenance and repair components on airfield pavements and civil works construction projects in support of the 19th Civil Engineer Squadron (19 CES). Construction projects to be performed under base pavements consist of but are not limited to temporary and permanent airfield markings, install erosion control measures, seal joints, spall repair, bitumen seal coats, random crack repair, rubber removal, friction testing, remove and disposal of concrete pavements, remove, crush, and stockpile concrete pavements, asphalt cold milling and disposal of milled material, asphalt cold milling and stockpile milled material, placing, grading, and compacting government provided crushed concrete and asphalt millings, construction of new concrete pavements, groove the runway surface, install new tiedowns in new or existing pavement, placing hot mix asphalt, install subdrains, grading airfield areas to meet airfield criteria, hydroseed and or sod disturbed areas, GIS and As-Built drawings, SWPPP implementation to LRAFB and ADEQ Standards, demolition of concrete, asphalt and various structures, concrete work, Architectural Barriers Act (ABA) Ramps, handrails, and site work, site work to include excavation to grade, grading, compacting, various materials, clearing and grubbing, selective tree cutting, and demolition, landscape establishment to include topsoil, trees, sodding, seeding, concrete joint sealant, asphalt maintenance to include crack sealant, and slurry seal, bollard installation, valve, meter, hydrants adjustments, AHTD Standards Roadway Construction, asphalt construction, asphalt cold milling, roadway maintenance of traffic and traffic control devices, LRAFB, AHTD, and FHWA pavement markings and signage, culvert installation, modifications, and safety end sections, drop inlet, curb inlet, junction box repair, adjustments, installation and modifications, underdrain installation, concrete steps, concrete sidewalks, and traffic detection loop installation and repair. Description of work will be identified in each individual task order. Individual task orders may require the project to be completed in multiple phases in order to facilitate base operations. **Amendment 1 - All questions shall be submitted no later than Friday, 15 Aug 2025 at 1:00 PM CDT. No further questions will be accepted after this date and time. Site Visit sign-in sheets are being posted only for refrerence and will not be a part of the contract.**
From Solicitation posted on Aug 12, 2025Base Pavements Indefinite-Delivery Indefinite-Quantity (IDIQ) Little Rock Air Force Base (LRAFB) for maintenance and repair components on airfield pavements and civil works construction projects in support of the 19th Civil Engineer Squadron (19 CES). Construction projects to be performed under base pavements consist of but are not limited to temporary and permanent airfield markings, install erosion control measures, seal joints, spall repair, bitumen seal coats, random crack repair, rubber removal, friction testing, remove and disposal of concrete pavements, remove, crush, and stockpile concrete pavements, asphalt cold milling and disposal of milled material, asphalt cold milling and stockpile milled material, placing, grading, and compacting government provided crushed concrete and asphalt millings, construction of new concrete pavements, groove the runway surface, install new tiedowns in new or existing pavement, placing hot mix asphalt, install subdrains, grading airfield areas to meet airfield criteria, hydroseed and or sod disturbed areas, GIS and As-Built drawings, SWPPP implementation to LRAFB and ADEQ Standards, demolition of concrete, asphalt and various structures, concrete work, Architectural Barriers Act (ABA) Ramps, handrails, and site work, site work to include excavation to grade, grading, compacting, various materials, clearing and grubbing, selective tree cutting, and demolition, landscape establishment to include topsoil, trees, sodding, seeding, concrete joint sealant, asphalt maintenance to include crack sealant, and slurry seal, bollard installation, valve, meter, hydrants adjustments, AHTD Standards Roadway Construction, asphalt construction, asphalt cold milling, roadway maintenance of traffic and traffic control devices, LRAFB, AHTD, and FHWA pavement markings and signage, culvert installation, modifications, and safety end sections, drop inlet, curb inlet, junction box repair, adjustments, installation and modifications, underdrain installation, concrete steps, concrete sidewalks, and traffic detection loop installation and repair. Description of work will be identified in each individual task order. Individual task orders may require the project to be completed in multiple phases in order to facilitate base operations. **Amendment 1 - All questions shall be submitted no later than Friday, 15 Aug 2025 at 1:00 PM CDT. No further questions will be accepted after this date and time. Site Visit sign-in sheets are being posted only for refrerence and will not be a part of the contract.** **Amendment 2 - Questions will be submitted via email to the Primary and Secondary Point of Contacts listed below. Questions and Answers will be posted in an amendment to the solicaition.**
From Solicitation posted on Aug 14, 2025Base Pavements Indefinite-Delivery Indefinite-Quantity (IDIQ) Little Rock Air Force Base (LRAFB) for maintenance and repair components on airfield pavements and civil works construction projects in support of the 19th Civil Engineer Squadron (19 CES). Construction projects to be performed under base pavements consist of but are not limited to temporary and permanent airfield markings, install erosion control measures, seal joints, spall repair, bitumen seal coats, random crack repair, rubber removal, friction testing, remove and disposal of concrete pavements, remove, crush, and stockpile concrete pavements, asphalt cold milling and disposal of milled material, asphalt cold milling and stockpile milled material, placing, grading, and compacting government provided crushed concrete and asphalt millings, construction of new concrete pavements, groove the runway surface, install new tiedowns in new or existing pavement, placing hot mix asphalt, install subdrains, grading airfield areas to meet airfield criteria, hydroseed and or sod disturbed areas, GIS and As-Built drawings, SWPPP implementation to LRAFB and ADEQ Standards, demolition of concrete, asphalt and various structures, concrete work, Architectural Barriers Act (ABA) Ramps, handrails, and site work, site work to include excavation to grade, grading, compacting, various materials, clearing and grubbing, selective tree cutting, and demolition, landscape establishment to include topsoil, trees, sodding, seeding, concrete joint sealant, asphalt maintenance to include crack sealant, and slurry seal, bollard installation, valve, meter, hydrants adjustments, AHTD Standards Roadway Construction, asphalt construction, asphalt cold milling, roadway maintenance of traffic and traffic control devices, LRAFB, AHTD, and FHWA pavement markings and signage, culvert installation, modifications, and safety end sections, drop inlet, curb inlet, junction box repair, adjustments, installation and modifications, underdrain installation, concrete steps, concrete sidewalks, and traffic detection loop installation and repair. Description of work will be identified in each individual task order. Individual task orders may require the project to be completed in multiple phases in order to facilitate base operations. **Amendment 1 - Amendment to posting. All questions shall be submitted no later than Friday, 15 Aug 2025 at 1:00 PM CDT. No further questions will be accepted after this date and time. Site Visit sign-in sheets are being posted only for reference and will not be a part of the contract.** **Amendment 2 - Amendment to posting. Questions will be submitted via email to the Primary and Secondary Point of Contacts listed below. Questions and Answers will be posted in an amendment to the solicaition.** **Amendment 3 - Amendment to Solicitation. FA446025R00020001 to include the following: 1. Update DAFFARS Provision 5352.242-9000 2. Delete DFARS Provision 252.204-7020 3. Delete FAR Provision 52.222-23 4. Revise Section L Instructions, Conditions, & Notices to Offerors or Quoters 5. Revise Attachment 1, Attachment 12, and Attachment 17 6. Add Attachment 22, Attachment 23, and Attachment 24 7. Extend proposal due date from 2 Sep 2025 to 12 Sep 2025.**
From Solicitation posted on Aug 26, 2025Base Pavements Indefinite-Delivery Indefinite-Quantity (IDIQ) Little Rock Air Force Base (LRAFB) for maintenance and repair components on airfield pavements and civil works construction projects in support of the 19th Civil Engineer Squadron (19 CES). Construction projects to be performed under base pavements consist of but are not limited to temporary and permanent airfield markings, install erosion control measures, seal joints, spall repair, bitumen seal coats, random crack repair, rubber removal, friction testing, remove and disposal of concrete pavements, remove, crush, and stockpile concrete pavements, asphalt cold milling and disposal of milled material, asphalt cold milling and stockpile milled material, placing, grading, and compacting government provided crushed concrete and asphalt millings, construction of new concrete pavements, groove the runway surface, install new tiedowns in new or existing pavement, placing hot mix asphalt, install subdrains, grading airfield areas to meet airfield criteria, hydroseed and or sod disturbed areas, GIS and As-Built drawings, SWPPP implementation to LRAFB and ADEQ Standards, demolition of concrete, asphalt and various structures, concrete work, Architectural Barriers Act (ABA) Ramps, handrails, and site work, site work to include excavation to grade, grading, compacting, various materials, clearing and grubbing, selective tree cutting, and demolition, landscape establishment to include topsoil, trees, sodding, seeding, concrete joint sealant, asphalt maintenance to include crack sealant, and slurry seal, bollard installation, valve, meter, hydrants adjustments, AHTD Standards Roadway Construction, asphalt construction, asphalt cold milling, roadway maintenance of traffic and traffic control devices, LRAFB, AHTD, and FHWA pavement markings and signage, culvert installation, modifications, and safety end sections, drop inlet, curb inlet, junction box repair, adjustments, installation and modifications, underdrain installation, concrete steps, concrete sidewalks, and traffic detection loop installation and repair. Description of work will be identified in each individual task order. Individual task orders may require the project to be completed in multiple phases in order to facilitate base operations. **Amendment 1 - Amendment to posting. All questions shall be submitted no later than Friday, 15 Aug 2025 at 1:00 PM CDT. No further questions will be accepted after this date and time. Site Visit sign-in sheets are being posted only for reference and will not be a part of the contract.** **Amendment 2 - Amendment to posting. Questions will be submitted via email to the Primary and Secondary Point of Contacts listed below. Questions and Answers will be posted in an amendment to the solicaition.** **Amendment 3 - Amendment to Solicitation. FA446025R00020001 to include the following: 1. Update DAFFARS Provision 5352.242-9000 2. Delete DFARS Provision 252.204-7020 3. Delete FAR Provision 52.222-23 4. Revise Section L Instructions, Conditions, & Notices to Offerors or Quoters 5. Revise Attachment 1, Attachment 12, and Attachment 17 6. Add Attachment 22, Attachment 23, and Attachment 24 7. Extend proposal due date from 2 Sep 2025 to 12 Sep 2025.** **Amendment 4 - Amendment to Solicitation. FA446025R00020002 is to incorporate the updated - Attachment 1 - Base Pavements Bid Schedule NKAK 23-1030: FROM - Base Pavements Bid Schedule NKAK 23-1030 26 Aug 20025 TO - Base Pavements Bid Schedule NKAK 23-1030 27 Aug 20025**
From Solicitation posted on Aug 27, 2025Base Pavements Indefinite-Delivery Indefinite-Quantity (IDIQ) Little Rock Air Force Base (LRAFB) for maintenance and repair components on airfield pavements and civil works construction projects in support of the 19th Civil Engineer Squadron (19 CES). Construction projects to be performed under base pavements consist of but are not limited to temporary and permanent airfield markings, install erosion control measures, seal joints, spall repair, bitumen seal coats, random crack repair, rubber removal, friction testing, remove and disposal of concrete pavements, remove, crush, and stockpile concrete pavements, asphalt cold milling and disposal of milled material, asphalt cold milling and stockpile milled material, placing, grading, and compacting government provided crushed concrete and asphalt millings, construction of new concrete pavements, groove the runway surface, install new tiedowns in new or existing pavement, placing hot mix asphalt, install subdrains, grading airfield areas to meet airfield criteria, hydroseed and or sod disturbed areas, GIS and As-Built drawings, SWPPP implementation to LRAFB and ADEQ Standards, demolition of concrete, asphalt and various structures, concrete work, Architectural Barriers Act (ABA) Ramps, handrails, and site work, site work to include excavation to grade, grading, compacting, various materials, clearing and grubbing, selective tree cutting, and demolition, landscape establishment to include topsoil, trees, sodding, seeding, concrete joint sealant, asphalt maintenance to include crack sealant, and slurry seal, bollard installation, valve, meter, hydrants adjustments, AHTD Standards Roadway Construction, asphalt construction, asphalt cold milling, roadway maintenance of traffic and traffic control devices, LRAFB, AHTD, and FHWA pavement markings and signage, culvert installation, modifications, and safety end sections, drop inlet, curb inlet, junction box repair, adjustments, installation and modifications, underdrain installation, concrete steps, concrete sidewalks, and traffic detection loop installation and repair. Description of work will be identified in each individual task order. Individual task orders may require the project to be completed in multiple phases in order to facilitate base operations. **Amendment 1 - Amendment to posting. All questions shall be submitted no later than Friday, 15 Aug 2025 at 1:00 PM CDT. No further questions will be accepted after this date and time. Site Visit sign-in sheets are being posted only for reference and will not be a part of the contract.** **Amendment 2 - Amendment to posting. Questions will be submitted via email to the Primary and Secondary Point of Contacts listed below. Questions and Answers will be posted in an amendment to the solicaition.** **Amendment 3 - Amendment to Solicitation. FA446025R00020001 to include the following: 1. Update DAFFARS Provision 5352.242-9000 2. Delete DFARS Provision 252.204-7020 3. Delete FAR Provision 52.222-23 4. Revise Section L Instructions, Conditions, & Notices to Offerors or Quoters 5. Revise Attachment 1, Attachment 12, and Attachment 17 6. Add Attachment 22, Attachment 23, and Attachment 24 7. Extend proposal due date from 2 Sep 2025 to 12 Sep 2025.** **Amendment 4 - Amendment to Solicitation. FA446025R00020002 is to incorporate the updated - Attachment 1 - Base Pavements Bid Schedule NKAK 23-1030: FROM - Base Pavements Bid Schedule NKAK 23-1030 26 Aug 20025 TO - Base Pavements Bid Schedule NKAK 23-1030 27 Aug 20025** **Amendment 5 - Amendment to posting. Due to the unavailability of historical weather data via the National Oceanic and Atmospheric Administration's (NOAA) website because of system upgrading, it is acceptable to use historical weather data from other websites.**
From Solicitation posted on Aug 28, 2025Base Pavements Indefinite-Delivery Indefinite-Quantity (IDIQ) Little Rock Air Force Base (LRAFB) for maintenance and repair components on airfield pavements and civil works construction projects in support of the 19th Civil Engineer Squadron (19 CES). Construction projects to be performed under base pavements consist of but are not limited to temporary and permanent airfield markings, install erosion control measures, seal joints, spall repair, bitumen seal coats, random crack repair, rubber removal, friction testing, remove and disposal of concrete pavements, remove, crush, and stockpile concrete pavements, asphalt cold milling and disposal of milled material, asphalt cold milling and stockpile milled material, placing, grading, and compacting government provided crushed concrete and asphalt millings, construction of new concrete pavements, groove the runway surface, install new tiedowns in new or existing pavement, placing hot mix asphalt, install subdrains, grading airfield areas to meet airfield criteria, hydroseed and or sod disturbed areas, GIS and As-Built drawings, SWPPP implementation to LRAFB and ADEQ Standards, demolition of concrete, asphalt and various structures, concrete work, Architectural Barriers Act (ABA) Ramps, handrails, and site work, site work to include excavation to grade, grading, compacting, various materials, clearing and grubbing, selective tree cutting, and demolition, landscape establishment to include topsoil, trees, sodding, seeding, concrete joint sealant, asphalt maintenance to include crack sealant, and slurry seal, bollard installation, valve, meter, hydrants adjustments, AHTD Standards Roadway Construction, asphalt construction, asphalt cold milling, roadway maintenance of traffic and traffic control devices, LRAFB, AHTD, and FHWA pavement markings and signage, culvert installation, modifications, and safety end sections, drop inlet, curb inlet, junction box repair, adjustments, installation and modifications, underdrain installation, concrete steps, concrete sidewalks, and traffic detection loop installation and repair. Description of work will be identified in each individual task order. Individual task orders may require the project to be completed in multiple phases in order to facilitate base operations. **Amendment 1 - Amendment to posting. All questions shall be submitted no later than Friday, 15 Aug 2025 at 1:00 PM CDT. No further questions will be accepted after this date and time. Site Visit sign-in sheets are being posted only for reference and will not be a part of the contract.** **Amendment 2 - Amendment to posting. Questions will be submitted via email to the Primary and Secondary Point of Contacts listed below. Questions and Answers will be posted in an amendment to the solicaition.** **Amendment 3 - Amendment to Solicitation. FA446025R00020001 to include the following: 1. Update DAFFARS Provision 5352.242-9000 2. Delete DFARS Provision 252.204-7020 3. Delete FAR Provision 52.222-23 4. Revise Section L Instructions, Conditions, & Notices to Offerors or Quoters 5. Revise Attachment 1, Attachment 12, and Attachment 17 6. Add Attachment 22, Attachment 23, and Attachment 24 7. Extend proposal due date from 2 Sep 2025 to 12 Sep 2025.** **Amendment 4 - Amendment to Solicitation. FA446025R00020002 is to incorporate the updated - Attachment 1 - Base Pavements Bid Schedule NKAK 23-1030: FROM - Base Pavements Bid Schedule NKAK 23-1030 26 Aug 20025 TO - Base Pavements Bid Schedule NKAK 23-1030 27 Aug 20025** **Amendment 5 - Amendment to posting. Due to the unavailability of historical weather data via the National Oceanic and Atmospheric Administration's (NOAA) website because of system upgrading, it is acceptable to use historical weather data from other websites.** **Amendment 6 - Amendment to Solicitation. FA446025R00020003 is to add Attachment 25 - Arnold Gate Q&A 2 Sep 25 and to incorporate the updated - Attachment 22 - Arnold Gate Pavement Bid Schedule 2 Sep 25: FROM - Attachment 22 - Arnold Gate Pavement Bid Schedule TO - Attachment 22 - Arnold Gate Pavement Bid Schedule 2 Sep 25 Due to a contract writing system issue, an updated solicitation and SF30 will be posted at a later time**
From Solicitation posted on Sep 03, 2025Base Pavements Indefinite-Delivery Indefinite-Quantity (IDIQ) Little Rock Air Force Base (LRAFB) for maintenance and repair components on airfield pavements and civil works construction projects in support of the 19th Civil Engineer Squadron (19 CES). Construction projects to be performed under base pavements consist of but are not limited to temporary and permanent airfield markings, install erosion control measures, seal joints, spall repair, bitumen seal coats, random crack repair, rubber removal, friction testing, remove and disposal of concrete pavements, remove, crush, and stockpile concrete pavements, asphalt cold milling and disposal of milled material, asphalt cold milling and stockpile milled material, placing, grading, and compacting government provided crushed concrete and asphalt millings, construction of new concrete pavements, groove the runway surface, install new tiedowns in new or existing pavement, placing hot mix asphalt, install subdrains, grading airfield areas to meet airfield criteria, hydroseed and or sod disturbed areas, GIS and As-Built drawings, SWPPP implementation to LRAFB and ADEQ Standards, demolition of concrete, asphalt and various structures, concrete work, Architectural Barriers Act (ABA) Ramps, handrails, and site work, site work to include excavation to grade, grading, compacting, various materials, clearing and grubbing, selective tree cutting, and demolition, landscape establishment to include topsoil, trees, sodding, seeding, concrete joint sealant, asphalt maintenance to include crack sealant, and slurry seal, bollard installation, valve, meter, hydrants adjustments, AHTD Standards Roadway Construction, asphalt construction, asphalt cold milling, roadway maintenance of traffic and traffic control devices, LRAFB, AHTD, and FHWA pavement markings and signage, culvert installation, modifications, and safety end sections, drop inlet, curb inlet, junction box repair, adjustments, installation and modifications, underdrain installation, concrete steps, concrete sidewalks, and traffic detection loop installation and repair. Description of work will be identified in each individual task order. Individual task orders may require the project to be completed in multiple phases in order to facilitate base operations. **Amendment 1 - Amendment to posting. All questions shall be submitted no later than Friday, 15 Aug 2025 at 1:00 PM CDT. No further questions will be accepted after this date and time. Site Visit sign-in sheets are being posted only for reference and will not be a part of the contract.** **Amendment 2 - Amendment to posting. Questions will be submitted via email to the Primary and Secondary Point of Contacts listed below. Questions and Answers will be posted in an amendment to the solicaition.** **Amendment 3 - Amendment to Solicitation. FA446025R00020001 to include the following: 1. Update DAFFARS Provision 5352.242-9000 2. Delete DFARS Provision 252.204-7020 3. Delete FAR Provision 52.222-23 4. Revise Section L Instructions, Conditions, & Notices to Offerors or Quoters 5. Revise Attachment 1, Attachment 12, and Attachment 17 6. Add Attachment 22, Attachment 23, and Attachment 24 7. Extend proposal due date from 2 Sep 2025 to 12 Sep 2025.** **Amendment 4 - Amendment to Solicitation. FA446025R00020002 is to incorporate the updated - Attachment 1 - Base Pavements Bid Schedule NKAK 23-1030: FROM - Base Pavements Bid Schedule NKAK 23-1030 26 Aug 20025 TO - Base Pavements Bid Schedule NKAK 23-1030 27 Aug 20025** **Amendment 5 - Amendment to posting. Due to the unavailability of historical weather data via the National Oceanic and Atmospheric Administration's (NOAA) website because of system upgrading, it is acceptable to use historical weather data from other websites.** **Amendment 6 - Amendment to Solicitation. FA446025R00020003 is to add Attachment 25 - Arnold Gate Q&A 2 Sep 25 and to incorporate the updated - Attachment 22 - Arnold Gate Pavement Bid Schedule 2 Sep 25: FROM - Attachment 22 - Arnold Gate Pavement Bid Schedule TO - Attachment 22 - Arnold Gate Pavement Bid Schedule 2 Sep 25 Due to a contract writing system issue, an updated solicitation and SF30 will be posted at a later time. Updated solicitation and SF30 have been added.**
From Solicitation posted on Sep 04, 2025Base Pavements Indefinite-Delivery Indefinite-Quantity (IDIQ) Little Rock Air Force Base (LRAFB) for maintenance and repair components on airfield pavements and civil works construction projects in support of the 19th Civil Engineer Squadron (19 CES). Construction projects to be performed under base pavements consist of but are not limited to temporary and permanent airfield markings, install erosion control measures, seal joints, spall repair, bitumen seal coats, random crack repair, rubber removal, friction testing, remove and disposal of concrete pavements, remove, crush, and stockpile concrete pavements, asphalt cold milling and disposal of milled material, asphalt cold milling and stockpile milled material, placing, grading, and compacting government provided crushed concrete and asphalt millings, construction of new concrete pavements, groove the runway surface, install new tiedowns in new or existing pavement, placing hot mix asphalt, install subdrains, grading airfield areas to meet airfield criteria, hydroseed and or sod disturbed areas, GIS and As-Built drawings, SWPPP implementation to LRAFB and ADEQ Standards, demolition of concrete, asphalt and various structures, concrete work, Architectural Barriers Act (ABA) Ramps, handrails, and site work, site work to include excavation to grade, grading, compacting, various materials, clearing and grubbing, selective tree cutting, and demolition, landscape establishment to include topsoil, trees, sodding, seeding, concrete joint sealant, asphalt maintenance to include crack sealant, and slurry seal, bollard installation, valve, meter, hydrants adjustments, AHTD Standards Roadway Construction, asphalt construction, asphalt cold milling, roadway maintenance of traffic and traffic control devices, LRAFB, AHTD, and FHWA pavement markings and signage, culvert installation, modifications, and safety end sections, drop inlet, curb inlet, junction box repair, adjustments, installation and modifications, underdrain installation, concrete steps, concrete sidewalks, and traffic detection loop installation and repair. Description of work will be identified in each individual task order. Individual task orders may require the project to be completed in multiple phases in order to facilitate base operations. **Amendment 1 - Amendment to posting. All questions shall be submitted no later than Friday, 15 Aug 2025 at 1:00 PM CDT. No further questions will be accepted after this date and time. Site Visit sign-in sheets are being posted only for reference and will not be a part of the contract.** **Amendment 2 - Amendment to posting. Questions will be submitted via email to the Primary and Secondary Point of Contacts listed below. Questions and Answers will be posted in an amendment to the solicaition.** **Amendment 3 - Amendment to Solicitation. FA446025R00020001 to include the following: 1. Update DAFFARS Provision 5352.242-9000 2. Delete DFARS Provision 252.204-7020 3. Delete FAR Provision 52.222-23 4. Revise Section L Instructions, Conditions, & Notices to Offerors or Quoters 5. Revise Attachment 1, Attachment 12, and Attachment 17 6. Add Attachment 22, Attachment 23, and Attachment 24 7. Extend proposal due date from 2 Sep 2025 to 12 Sep 2025.** **Amendment 4 - Amendment to Solicitation. FA446025R00020002 is to incorporate the updated - Attachment 1 - Base Pavements Bid Schedule NKAK 23-1030: FROM - Base Pavements Bid Schedule NKAK 23-1030 26 Aug 20025 TO - Base Pavements Bid Schedule NKAK 23-1030 27 Aug 20025** **Amendment 5 - Amendment to posting. Due to the unavailability of historical weather data via the National Oceanic and Atmospheric Administration's (NOAA) website because of system upgrading, it is acceptable to use historical weather data from other websites.** **Amendment 6 - Amendment to Solicitation. FA446025R00020003 is to add Attachment 25 - Arnold Gate Q&A 2 Sep 25 and to incorporate the updated - Attachment 22 - Arnold Gate Pavement Bid Schedule 2 Sep 25: FROM - Attachment 22 - Arnold Gate Pavement Bid Schedule TO - Attachment 22 - Arnold Gate Pavement Bid Schedule 2 Sep 25 Due to a contract writing system issue, an updated solicitation and SF30 will be posted at a later time. Updated solicitation and SF30 have been added.** **Amendment 7 - Amendment to solicitation. Added 52.223-23 Sustainable Products and Services.**
From Solicitation posted on Jan 06, 2026Notice history
9-
-
Solicitation Posted Aug 12, 2025View changes (2)
- Title: Little Rock AFB Base Pavements IDIQ FY25 → Little Rock AFB Base Pavements IDIQ FY25 - Amendment 1
- Description: Description was updated
-
Solicitation Posted Aug 14, 2025View changes (2)
- Title: Little Rock AFB Base Pavements IDIQ FY25 - Amendment 1 → Little Rock AFB Base Pavements IDIQ FY25 - Amendment 2
- Description: Description was updated
-
Solicitation Posted Aug 26, 2025View changes (3)
- Title: Little Rock AFB Base Pavements IDIQ FY25 - Amendment 2 → Little Rock AFB Base Pavements IDIQ FY25 - Amendment 3
- Description: Description was updated
- Response Deadline: Sep 02, 2025 → Sep 12, 2025
-
Solicitation Posted Aug 27, 2025View changes (2)
- Title: Little Rock AFB Base Pavements IDIQ FY25 - Amendment 3 → Little Rock AFB Base Pavements IDIQ FY25 - Amendment 4
- Description: Description was updated
-
Solicitation Posted Aug 28, 2025View changes (2)
- Title: Little Rock AFB Base Pavements IDIQ FY25 - Amendment 4 → Little Rock AFB Base Pavements IDIQ FY25 - Amendment 5
- Description: Description was updated
-
Solicitation Posted Sep 03, 2025View changes (2)
- Title: Little Rock AFB Base Pavements IDIQ FY25 - Amendment 5 → Little Rock AFB Base Pavements IDIQ FY25 - Amendment 6
- Description: Description was updated
-
Solicitation Posted Sep 04, 2025View changes (2)
- Title: Little Rock AFB Base Pavements IDIQ FY25 - Amendment 6 → Little Rock AFB Base Pavements IDIQ FY25 - Amendment 6 *Update*
- Description: Description was updated
-
Solicitation LATEST Posted Jan 06, 2026View changes (2)
- Title: Little Rock AFB Base Pavements IDIQ FY25 - Amendment 6 *Update* → Little Rock AFB Base Pavements IDIQ FY25 - Amendment 7
- Description: Description was updated
Details
Award Information
Not yet awarded