Contacts, documents and full notice history are available with a subscription.
Combined Synopsis/Solicitation SBA Expired 1 notice 14 documents

Line Fire BAER and Suppression Repair. San Bernardino National Forest. 127EAW25R0031

Solicitation 127EAW25R0031 Copied Notice ID a850d8de7d5b4201bc4e753a87eb234b Copied AGRICULTURE, DEPARTMENT OF — USDA-FS, CSA SOUTHWEST 6
SAM.gov
Posted
Jun 13, 2025
Deadline
Jun 20, 2025
Set-aside
SBA
NAICS
237310
PSC
Z2LB

Summary

AI-generated · Aug 23, 2025

Line Fire BAER and Suppression Repair at the San Bernardino National Forest is being issued as a Combined Synopsis/Solicitation. The Description field is blank, so no specific scope, deliverables, or requirements are provided beyond the project title.

Amendment 2 dated 06/13/2025 is issued. 1. Request For Information (RFI) Responses have been provided 2. Attachment 12, titled "Line Fire Guardrail," is now included -------------------------------------------------- Amendment 1 dated 06/13/2025 is issued. 1. Extend the solicitation due date. The new extended proposal due date is 6/20/2025 at 11:00 AM PST 2. Provide an update on the proposal submission instructions. Send to Tanya Torres. tanya.torres@usda.gov 3. Provide an update on Request For Information (RFI) Responses -------------------------------------------------- SCOPE OF CONTRACT: The purpose of this project is to replace guardrail burned by the Line Fire and to replace and repair overside drains that were damaged during Line Fire suppression efforts on the San Bernardino National Forest, Front Country and Mountaintop Ranger Districts. This contract provides for the equipment, labor, and services necessary to perform work ordered by the Government for installing 205 feet of guardrail, installing and removing 21 corrugated metal spillways, and resetting 3 corrugated metal spillways in compliance with the terms, specifications, drawings and provisions of this contract. Locations of work will be directed by the Forest Service. The contractor shall provide all labor, materials, equipment, permits, testing, incidentals, and supervision to perform the requirements of this SOW and associated task order award. This project task order contract shall include the terms and conditions of the base IDIQ contract and supplemented by any project-specific requirements/attachments. Existing contract clauses may be supplemented and new contract clauses may be added. All work will be performed in accordance with contract and applicable regulatory requirements. PROJECT LOCATION: The project location is in multiple locations on the Front Country and Mountaintop Ranger Districts. The terrain can be relatively flat in a few areas and moderately hilly and steep in others. Soil conditions vary as well, from soft and sandy to compacted and extremely rocky. PERIOD OF PERFORMANCE: Projected start date: June 18, 2025. Time for completion: 105 calendar days from the issuance of the “Notice to Proceed”. REQUIREMENTS: The Contractor shall furnish the necessary personnel, material, equipment, services, and facilities to perform the Statement of Work/Specifications referenced below. The Contractor shall minimize mechanical activity during rainy periods and the CO may shut down the operation if excessive soil disturbance and/or erosion problems occur. The Contractor shall repair all associated damage on established roads, adjacent vegetation or other improvements caused by their operations or equipment prior to partial or final payment. The Contractor shall provide technical submittals for all materials that may be furnished on this project for Forest Service review and approval prior to installation. The Contractor shall dispose of all project related trash and debris off of Forest lands prior to final payment. The Contractor is responsible for contacting the Forest dispatch center to obtain the fire predicted Project Activity Level (PAL) each day and restrict their work accordingly. The Contractor shall adhere to the pertinent requirements addressed in the Fire Plan. Fire Plan restrictions may require work to cease at 1:00 pm or not be initiated at all on a high fire activity (PAL) day. The Contractor is responsible for traffic control and equipment staging requirements in work areas when working on National Forest System Lands. The Contractor shall provide clean equipment for the project prior to driving on Forest and between project areas to prevent the introduction of invasive weeds to the Forest. SPECIFICATIONS: A.FHWA Standard Specification 2024 B.Forest Service Supplemental Specifications [FSSS]. Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-24. U.S. Customary Units and Forest Service Supplemental Specifications (FSSS). FP-14 and Caltrans Specs where applicable. Electronic copy can be downloaded at: https://highways.dot.gov/federal-lands/specs/fp-24 The following standard Forest Service specifications are included as a part of this contract: •840-2 Install •840-2a 18 Inch Detail San Bernardino National Forest maps are also available to assist in locating the individual roads and can be purchased at the Supervisor’s Office. IAW FAR 36.204, disclosed magnitude of construction cost is between $25,000 and $100,000. NAICS CODE: 237310, Highway Street Bridge Construction, $45M SOLICITATION NO. 127EAW25R0031 DAVIS-BACON WAGES APPLY BONDS ARE REQUIRED FOR PROJECTS WITH A VALUE OF $35,000.00 AND ABOVE

From Combined Synopsis/Solicitation posted on Jun 13, 2025

Notice history

1
  1. Combined Synopsis/Solicitation LATEST Posted Jun 13, 2025

Details

Solicitation number 127EAW25R0031
Notice ID a850d8de7d5b4201bc4e753a87eb234b
Notice type Combined Synopsis/Solicitation
Product / Service (PSC) Z2LB
NAICS 237310
Place of performance Big Bear City, California
Archive date Jul 05, 2025

Award Information

Not yet awarded

Contacts

primary
Tanya Torres

Email

secondary
Jeremy Bedner

Email

Agency

AGRICULTURE, DEPARTMENT OF
FOREST SERVICE
USDA-FS, CSA SOUTHWEST 6

Place of Performance

Big Bear City, California 92314
USA

Dates

Posted Jun 13, 2025 1 year ago
Last Updated Aug 05, 2026 2 days ago
Due Jun 20, 2025 1 year ago