Lift Station Rehabilitation and Upgrade at Wister Lake, OK W912BV25QA044

Solicitation W912BV25QA044 Copied Notice ID 6ea9aa7431b44ff697e92d1ea5bc2651 Copied DEPT OF DEFENSE — W076 ENDIST TULSA
SAM.gov
Posted
Sep 18, 2025
Deadline
Oct 08, 2025
Set-aside
SBA
NAICS
237110
PSC
Y1ND

Summary

AI-generated · Sep 28, 2025

Upgrade and rehabilitate the lift station at the Wister Lake Project Office in Wister, Oklahoma. The contractor shall provide all labor, materials, tools, and equipment needed to fully rehabilitate the lift station, including upgrading the existing 3-phase power waste-management system, installing a new 1,000-gallon solids tank that drains into the existing tank, and placing a high-efficiency water pump in the tank to pump uphill to the sewer lagoon. The work also covers inspecting and repairing the tank lid hinges to restore operability and safety, and installing a streamlined control panel to enhance performance and reliability. Before installation, remove and dispose of obsolete components (specifically the existing railing and pump) in compliance with all applicable federal, state, and environmental safety laws. The project has a 45-day period of performance.

The U.S. Army Corps of Engineers - SWT-Tulsa District - offers this solicitation for the Rehabilitation and Upgrade of a Lift Station at Wister Lake, OK. The contractor shall furnish all labor, materials, tools, and equipment required to fully rehabilitate the lift station located at the Wister Lake Project Office in Wister, Oklahoma (Le Flore County). The scope of work includes, but is not limited to, the upgrade of an existing 3-phase power waste management system, including the installation of a new 1,000-gallon solids tank that will drain into the existing tank. The contractor will install a high-efficiency water pump in existing tank that will pump uphill to sewer lagoon. The tank lid hinges will be inspected and repaired to restore full operability and safety. The contractor will be required to install a new streamlined control panel designed to enhance the operational performance and reliability. Prior to installation, all obsolete components specifically the existing railing and pump will be carefully dismantled and removed from the existing tank. Disposal of these items will be conducted in compliance with all federal, state, and environmental safety laws regulations. This acquisition is 100% set aside for small business. In accordance with FAR 36.204, DISCLOSURE OF THE MAGNITUDE OF CONSTRUCTION PROJECTS, the estimated magnitude of construction for this project is less than $25,000. The NAICS code for this project is 237110, WATER AND SEWER LINE AND RELATED STRUCTURES CONSTRUCTION. The size standard is $45M. The Period of Performance is 45 days.

From Solicitation posted on Sep 18, 2025

Notice history

1
  1. Solicitation LATEST Posted Sep 18, 2025 View

Details

Solicitation number W912BV25QA044
Notice ID 6ea9aa7431b44ff697e92d1ea5bc2651
Notice type Solicitation
Product / Service (PSC) Y1ND
NAICS 237110
Archive date Oct 22, 2025

Award Information

Not yet awarded

Documents

No files available

View on SAM.gov

Contacts

primary
Lee Maddox

Email

Phone

Agency

DEPT OF DEFENSE
DEPT OF THE ARMY
US ARMY CORPS OF ENGINEERS
ENGINEER DIVISION SOUTHWESTERN
W076 ENDIST TULSA

Place of Performance

25334 US-270Wister, OK 74966
74966

Dates

Posted Sep 18, 2025 10 months ago
Last Updated Aug 06, 2026 1 day ago
Due Oct 08, 2025 9 months ago