Level 2 FRP Over Lab Ceilings Installation- COFC0401 75D301-26-R-73423
Summary
AI-generated · Mar 26, 2026Repair and refinish gypsum board ceilings and walls on the second floor of Building 401 at the CDC Ft. Collins campus, installing smooth white fiberglass reinforced polymer (FRP) panels and trim to match existing installations. The contractor will handle demolition of delaminated ceiling portions, surface preparation, FRP panel and trim installation, sealing, and coordinating phased work access with CDC, including providing all materials, equipment, labor, and supervision.
Work must comply with all health, safety, and environmental regulations, include temporary barriers and dust control, protect and temporarily modify fire protection systems as needed, and be planned to minimize disruption to CDC operations. All work must follow the contract documents, drawings, and specifications. The project duration is 180 days from Notice to Proceed. Minimum qualifications require at least three years of experience with similar construction and interior finish projects.
The Centers for Disease Control and Prevention (CDC) requires a contractor to repair and refinish gypsum board ceilings and walls in laboratory, laboratory support, corridors, and ancillary spaces on the second floor of Building 401 at the CDC Ft. Collins campus. The primary work includes covering designated gypsum board ceilings with smooth, white fiberglass reinforced polymer (FRP) panels and trim, installed to match existing installations in the building. The contractor will be responsible for all materials, equipment, labor, and supervision necessary to complete the work, including demolition of delaminated ceiling portions, surface preparation, installation of FRP panels and trim, sealing, and coordination with CDC for phased access to work areas. The project also requires compliance with all applicable health, safety, and environmental regulations, provision of temporary barriers and dust control, protection and temporary modification of fire protection systems, and coordination of work to minimize disruption to ongoing CDC operations. All work must be performed in accordance with the contract documents, drawings, and specifications provided by the Government. Period of Performance: Completion is required within 180 days after Notice to Proceed. Minimum Vendor Qualifications: Offerors must demonstrate at least three years of experience with similar construction and interior finish projects.
From Combined Synopsis/Solicitation posted on Mar 25, 2026Amendment 0001 (See Attached): A site visit is scheduled for April 13, 2026, at 0930 (MT). See attached amendment for instructions and the required Visitor Request Form (VRF). SOLICITATION DETAILS The Centers for Disease Control and Prevention (CDC) requires a contractor to repair and refinish gypsum board ceilings and walls in laboratory, laboratory support, corridors, and ancillary spaces on the second floor of Building 401 at the CDC Ft. Collins campus. The primary work includes covering designated gypsum board ceilings with smooth, white fiberglass reinforced polymer (FRP) panels and trim, installed to match existing installations in the building. The contractor will be responsible for all materials, equipment, labor, and supervision necessary to complete the work, including demolition of delaminated ceiling portions, surface preparation, installation of FRP panels and trim, sealing, and coordination with CDC for phased access to work areas. The project also requires compliance with all applicable health, safety, and environmental regulations, provision of temporary barriers and dust control, protection and temporary modification of fire protection systems, and coordination of work to minimize disruption to ongoing CDC operations. All work must be performed in accordance with the contract documents, drawings, and specifications provided by the Government. Period of Performance: Completion is required within 180 days after Notice to Proceed. Minimum Vendor Qualifications: Offerors must demonstrate at least three years of experience with similar construction and interior finish projects.
From Combined Synopsis/Solicitation posted on Apr 08, 2026Notice history
2-
-
Combined Synopsis/Solicitation LATEST Posted Apr 08, 2026View changes (2)
- Description: Description was updated
- Response Deadline: Apr 22, 2026 → Apr 27, 2026
Details
Award Information
Not yet awarded
Contacts
Agency
Place of Performance
USA