Contacts, documents and full notice history are available with a subscription.
Solicitation Expired 1 notice 3 documents

LD 2&3 Traveling Mooring Bitt System Rehabilitation W912ES25RA008

Solicitation W912ES25RA008 Copied Notice ID cd7d27fc1f584d9a9ffaeaffbb456259 Copied DEPT OF DEFENSE — W07V ENDIST ST PAUL
SAM.gov
Posted
Jul 17, 2025
Deadline
Aug 19, 2025
Set-aside
None
NAICS
237990
PSC
Y1QA

Summary

AI-generated · Aug 24, 2025

Rehabilitation of the traveling mooring bitt system at Lock and Dam 2 and Lock and Dam 3 is being pursued in a two-phase design-build process. Phase I is a Request for Qualifications to identify a shortlist of highly qualified design-build teams that will be invited to Phase II, with a firm-fixed-price contract awarded for the overall project. Phase I does not include a site visit.

Phase II will issue an RFP to the shortlisted teams (up to five offerors) with technical and pricing criteria; those invited will have about 30 calendar days to prepare and submit proposals. The selected firm will design and construct the projects for both sites. Phase II will include a site visit for invitees, with details provided in the Phase II RFP. See the referenced RFQ document for detailed submission requirements.

The United States Army Corps of Engineers, St. Paul District (Government) is soliciting a Request for Qualifications (RFQ) for the Lock and Dam Numbers 2 & 3 (LDs 2 and 3) Traveling Mooring Bitt System Rehabilitation Project (Project) as Phase I of a two?phase design?build selection procedure. This procurement is full and open and will result in a firm fixed price contract. A two?phase procurement structure will be used for the Project, consisting of a Phase I Request for Qualifications (RFQ) and a subsequent Phase 2 Request for Proposals (RFP). The RFQ is being issued to identify, using the criteria and methodology described herein, a shortlist of highly qualified and capable design?build teams that will be invited to submit technical/price proposals for Phase 2 (RFP portion). The Government anticipates that three firms will be shortlisted (from the RFQ responses) and invited to submit responses to the RFP; however, the Government reserves the right to shortlist more or fewer firms depending on the responses to the RFQ received. There will be a maximum of five offerors selected to submit Phase 2 proposals. All Offerors will receive written notice regarding whether they were selected to compete in Phase 2. In Phase 2, the RFP package will be issued to the shortlisted design?build teams and will specify technical and pricing criteria. Those selected to compete for Phase 2 will have approximately 30 calendar days to prepare and submit their Phase 2 proposals. The Phase 2 proposals will be evaluated by the Government to select the design?build contractor for the project. The District is planning on awarding the design and construction for both sites. No site visit will be provided for Phase I. A site visit will be offered to those offerors who are invited to compete in Phase 2. The date and time for that site visit will be included in the Phase 2 RFP. The North American Industry Classification System (NAICS) Code is 237990, Other Heavy and Civil Engineering Construction. See "W912ES25RA008 - RFQ - LD 2_3 Traveling Mooring Bitt System Rehabilitation.pdf" for further details and submission requirements.

From Solicitation posted on Jul 17, 2025

Notice history

1
  1. Solicitation LATEST Posted Jul 17, 2025 View

Details

Solicitation number W912ES25RA008
Notice ID cd7d27fc1f584d9a9ffaeaffbb456259
Notice type Solicitation
Product / Service (PSC) Y1QA
NAICS 237990
Place of performance Hastings, Minnesota
Archive date Sep 03, 2025

Award Information

Not yet awarded

Contacts

primary
Roberta L. Just

Email

Phone

secondary
Sharon Frank-Scheierl

Email

Phone

Agency

DEPT OF DEFENSE
DEPT OF THE ARMY
US ARMY CORPS OF ENGINEERS
ENGINEER DIVISION MISSISSIPPI VALLEY
W07V ENDIST ST PAUL

Place of Performance

Hastings, Minnesota 55033
USA

Dates

Posted Jul 17, 2025 1 year ago
Last Updated Aug 06, 2026 1 day ago
Due Aug 19, 2025 11 months ago