LBNF Liquid Argon LAr Circulation Equipment LBNF-372669-JD
Summary
AI-generated · Nov 06, 2025Engineer and manufacture a Vacuum Jacketed Pump Valve Box that houses the pump, plus MLI-insulated upstream and downstream piping, isolation valves, and required instrumentation to support the LAr Circulation System for both Cryostat VD and Cryostat HD. The liquid argon must be transferred from the Cryostats to the low-pressure suction side of the main LAr Circulation Pump, and then downstream through system resistance to the LAr Purification system; pumps themselves are not included in this scope. Cryogenic equipment in the Detector Caverns must be protected and accessible using platforms, ladders, support beams, and rails, which are included in the scope.
Scope elements include the Vacuum Jacketed Pump Valve Box, MLI-insulated upstream and downstream piping (upstream/downstream of the main pumps, which are not part of the supply), instrumentation, isolation valves, pressure safety valves, and cryogenic equipment protection (platforms, ladders, and supports), with details provided in the Statement of Work.
A brief summary of the scope is provided below. For complete details please download the Statement of Work attached to this notice. The LAr Circulation System VD and HD Equipment is responsible for transferring liquid argon coming from the Cryostat VD and Cryostat HD to the low-pressure suction side of the main LAr Circulation Pump (not part of this scope). It is also responsible for transferring liquid argon downstream of the main LAr Circulation Pump (not part of this scope) through the system resistance (friction and internal losses in valves, piping, etc.) to the LAr Purification system. The selected vendor will engineer and manufacture the vacuum jacketed pump valve box (part of the scope) that will house the pump, the MLI insulated upstream and downstream piping, isolation valves, and instrumentation required for this operation laid out above. The cryogenic equipment in the Detector Caverns will need to be properly protected and accessible with the use of platforms, ladders, support beams and railings (all part of this scope). Scope Overview of the Supply Structure The LAr Circulation System VD and HD acquisition is broken down into the equipment, valves and instrumentation that are detailed in the SOW Vacuum Jacketed Pump Valve Box MLI insulated upstream and downstream piping of the main LAr Circulation Pumps (Pumps are not part of Supply) Instrumentation Isolation Valves Pressure Safety Valves Cryogenic Equipment Protection (Platforms, Ladders and Supports
From Solicitation posted on Nov 05, 2025A brief summary of the scope is provided below. For complete details please download the Statement of Work attached to this notice. The LAr Circulation System VD and HD Equipment is responsible for transferring liquid argon coming from the Cryostat VD and Cryostat HD to the low-pressure suction side of the main LAr Circulation Pump (not part of this scope). It is also responsible for transferring liquid argon downstream of the main LAr Circulation Pump (not part of this scope) through the system resistance (friction and internal losses in valves, piping, etc.) to the LAr Purification system. The selected vendor will engineer and manufacture the vacuum jacketed pump valve box (part of the scope) that will house the pump, the MLI insulated upstream and downstream piping, isolation valves, and instrumentation required for this operation laid out above. The cryogenic equipment in the Detector Caverns will need to be properly protected and accessible with the use of platforms, ladders, support beams and railings (all part of this scope). Scope Overview of the Supply Structure The LAr Circulation System VD and HD acquisition is broken down into the equipment, valves and instrumentation that are detailed in the SOW Vacuum Jacketed Pump Valve Box MLI insulated upstream and downstream piping of the main LAr Circulation Pumps (Pumps are not part of Supply) Instrumentation Isolation Valves Pressure Safety Valves Cryogenic Equipment Protection (Platforms, Ladders and Supports
From Solicitation posted on Nov 26, 2025A brief summary of the scope is provided below. For complete details please download the Statement of Work attached to this notice. The LAr Circulation System VD and HD Equipment is responsible for transferring liquid argon coming from the Cryostat VD and Cryostat HD to the low-pressure suction side of the main LAr Circulation Pump (not part of this scope). It is also responsible for transferring liquid argon downstream of the main LAr Circulation Pump (not part of this scope) through the system resistance (friction and internal losses in valves, piping, etc.) to the LAr Purification system. The selected vendor will engineer and manufacture the vacuum jacketed pump valve box (part of the scope) that will house the pump, the MLI insulated upstream and downstream piping, isolation valves, and instrumentation required for this operation laid out above. The cryogenic equipment in the Detector Caverns will need to be properly protected and accessible with the use of platforms, ladders, support beams and railings (all part of this scope). Scope Overview of the Supply Structure The LAr Circulation System VD and HD acquisition is broken down into the equipment, valves and instrumentation that are detailed in the SOW Vacuum Jacketed Pump Valve Box MLI insulated upstream and downstream piping of the main LAr Circulation Pumps (Pumps are not part of Supply) Instrumentation Isolation Valves Pressure Safety Valves Cryogenic Equipment Protection (Platforms, Ladders and Supports
From Solicitation posted on Dec 31, 2025A brief summary of the scope is provided below. For complete details please download the Statement of Work attached to this notice. The LAr Circulation System VD and HD Equipment is responsible for transferring liquid argon coming from the Cryostat VD and Cryostat HD to the low-pressure suction side of the main LAr Circulation Pump (not part of this scope). It is also responsible for transferring liquid argon downstream of the main LAr Circulation Pump (not part of this scope) through the system resistance (friction and internal losses in valves, piping, etc.) to the LAr Purification system. The selected vendor will engineer and manufacture the vacuum jacketed pump valve box (part of the scope) that will house the pump, the MLI insulated upstream and downstream piping, isolation valves, and instrumentation required for this operation laid out above. The cryogenic equipment in the Detector Caverns will need to be properly protected and accessible with the use of platforms, ladders, support beams and railings (all part of this scope). Scope Overview of the Supply Structure The LAr Circulation System VD and HD acquisition is broken down into the equipment, valves and instrumentation that are detailed in the SOW • Vacuum Jacketed Pump Valve Box • MLI insulated upstream and downstream piping of the main LAr Circulation Pumps (Pumps are not part of Supply) • Instrumentation • Isolation Valves • Pressure Safety Valves • Cryogenic Equipment Protection (Platforms, Ladders and Supports
From Solicitation posted on Jan 22, 2026Notice history
4-
Solicitation Posted Nov 05, 2025
-
Solicitation LATEST Posted Jan 22, 2026View changes (2)
- Description: Description was updated
- Response Deadline: Jan 23, 2026 → Jan 30, 2026
Details
Award Information
Not yet awarded