Landing Craft Air Cushion 100 (LCAC100) Class Lift Fan Impeller Blade Upgrade N61331-25-SN-Q11
Summary
AI-generated · Sep 28, 2025Interim production and depot repair retrofit for the first-of-class LCAC100 Gen2 lift-fan impeller and impeller blades. A firm-fixed-price requirements contract will be awarded on a sole-source basis to General Tool Company for the lift-fan impeller and blades retrofit under a requirements IDIQ, with a 36-month performance window from award.
Funding comes from Navy Other Procurement appropriations. This action is justified as a sole-source requirement (only one responsible source can satisfy the agency’s needs) and will not authorize acquisitions for other requirements.
The Government awards a firm fixed price (FFP) requirements IDIQ, on a sole source basis, to the General Tool Company (GTC), 101 Landy Lane, Cincinnati, OH 45215. The United States Navy (USN) has a requirement to establish an interim production and depot repair retrofit contract with GTC, Commercial and Government Entity (CAGE 96454), for the first of class LCAC100 Generation Two (GEN2) Lift Fan Impeller and Impeller Blades. As supported by the attached redacjted justificaiton. The estimated completion is 36 months after award. The Government s minimum needs have been verified by the certifying technical and requirements personnel. This proposed aciton does not authorize acquisition for other requirements. The purchase will be supported with Fiscal Year (FY) 2024 Other Procurement Navy (OPN) funding. 10 U.S.C. 3204(a)(1) Only one responsible source and no other supplies or services will satisfy agency requirements.
From Justification posted on Sep 24, 2025Notice history
1Details
Award Information
Contacts
Agency
Place of Performance
USA