Contacts, documents and full notice history are available with a subscription.
Presolicitation SBA Expired 2 notices

Lake George & Monument Fire Center Sewer Line Replacement Pike-San Isabel National Forests & Cimarron and Comanche National Grasslands South Park & Pikes Peak Ranger Districts, Colorado 1153531

Solicitation 1153531 Copied Notice ID 95b2ab775d6f4b419f1408697652f03f Copied AGRICULTURE, DEPARTMENT OF — USDA-FS, CSA INTERMOUNTAIN 8
SAM.gov
Posted
Jul 09, 2025
Deadline
Jul 25, 2025
Set-aside
SBA
NAICS
237110
PSC
Y1ND

Summary

AI-generated · Aug 24, 2025

Replace aging sanitary sewer lines at two Forest Service facilities in Colorado: Lake George Work Center and Monument Fire Center. Install new sanitary sewer service lines from the buildings to existing septic tanks or sewer manholes, with all related work (mobilization, quality control, project management and coordination, utility abandonment/demolition, site demolition, excavation, trenching, backfill, and site restoration). Monument also requires removal and replacement of existing site hydrants. The Lake George line is clay with offset joints and root intrusion, causing clogs, while the Monument line is too shallow and freezes in winter; the new lines will be installed deeper to avoid these issues. Both sites are accessible year-round by highway-legal vehicles, with winter conditions typical October–April.

The contract will be firm-fixed-price. A site visit is anticipated, with details provided at solicitation. Estimated project magnitude is between $25,000 and $100,000. Responses from capable firms should include a capability statement and basic company information; the notice being extended indicates the same scope remains, with no substantive change to requirements, only the posting period being extended.

PRESOLICITATION Lake George & Monument Fire Center Sewer Line Replacement Pike-San Isabel National Forests & Cimarron and Comanche National Grasslands South Park & Pikes Peak Ranger Districts 1. Introduction. This pre-solicitation notice is for information only and is not a commitment by the Government to solicit contractual offers or award contracts. The Government is not soliciting, nor will it accept proposals as a result of this presolicitation. If a competitive solicitation is issued in the future, it will be announced via The System for Award Management (SAM) at SAM.gov and interested parties must comply with that announcement. The Government will not reimburse respondents for any questions submitted or information provided as a result of this notice. This is not a solicitation or a promise to issue a solicitation, and this information is subject to modification and in no way binds the Government to award a contract. 2. Applicable North American Industry Classification System (NAICS) Code. The applicable NAICS CODE: 237110 Water and Line and Related Structures Construction (Size Standard in millions of dollars $45M). 3. Type of Contract to be Awarded. As a result of this presolicitation and possible solicitation, the Contract Service Area (CSA) Intermountain 8 plans to award a firm fixed price contract. 4. Type of Solicitation. The solicitation, if released, will be governed by Federal Acquisition Regulation Part 15, Contracting by Negotiation . 5. Presolicitation Posting Period. This presolicitation will be posted for 16 days. 6. Contracting Office Points of Contact. Holly Hlavac, Contract Specialist, Holly.Hlavac@usda.gov 7. Contract Background and Description. The existing sewer systems at both sites are of considerable age, nearing the end of useful service life, and have been incurring increased maintenance costs to address clogging and freezing issues. The existing sewer line at Lake George is made of clay pipe and the joints have become offset overtime allowing for root penetration into the sewer line. This results in clogging issues that must be regularly cleaned. The new sewer line will resolve this issue. The existing sewer line at Monument is too shallow and generally freezes over the winter, which renders the bathroom facilities in the Classroom building unusable. The new sewer line installed at a greater depth will resolve this issue. These sites are open and accessible year-round by highway legal vehicles. Approximate site elevations are approximately 7,100 feet at Monument and 8,100 feet at Lake George. Winter conditions (freezing temperatures, snow fall, frozen ground, etc.) can be anticipated approximately October through April. Cellular phone service is generally available at both sites. Scope of Work The project scope of work generally consists of the following: Lake George Work Center Installation of new sanitary sewer service lines from the Brown House and Office buildings to the existing septic tank. Associated and ancillary work includes mobilization, quality control, project management and coordination, utility abandonment/demolition, site demolition, excavation, trenching, backfill, and site surface restoration. Refer to the Project Manual/Specification and Construction Drawings for a full depiction of the work. Monument Fire Center Installation of new sanitary sewer service lines from the Classroom building to an existing sewer manhole. Removal and replacement of existing site water hydrants. Associated and ancillary work includes mobilization, quality control, project management and coordination, utility abandonment/demolition, site demolition, excavation, trenching, backfill, and site surface restoration. Refer to the Project Manual/Specification and Construction Drawings for a full depiction of the work. 8. Project Location. This project consists of work at two Forest Service administrative sites on the Pike-San Isabel National Forests & Cimarron and Comanche National Grasslands: Lake George Work Center South Park Ranger District 140 Trail Creek Road Lake George, CO 80827 Monument Fire Center Pikes Peak Ranger District 3751 Mt. Herman Road Monument, CO 80132 These sites are open and accessible year-round by highway legal vehicles. Winter conditions (freezing temperatures, snow fall, frozen ground, etc.) can be anticipated approximately October through April. 9. Estimated Period of Performance. September 22, 2025, through November 21, 2026 10. Site Visit. A site visit is anticipated; details will be provided at time of Solicitation. 11. Disclosure of Magnitude. The anticipated magnitude for this project is between $25,000 and $100,000. 12. Type of Set-aside. Total small business set-aside. 13. Responses. Interested and capable sources are encouraged to respond to this presolicitation with a Statement of Capability. In addition to a Statement of Capabilities, firms responding to this announcement should include Company Name, Unique Entity Identification, Point of Contact, Address, and indicate whether they are a Small Business, 8(a) Concern, Veteran-Owned Small Business, Service-Disabled Veteran-Owned Business, HUBZone Small Business, Small Disadvantaged Business, or Women-Owned Small Business. Responses are due within 18 days of this presolicitation and should be submitted to Contracting Specialist, Holly Hlavac at Holly.Hlavac@usda.gov.

From Presolicitation posted on Jul 09, 2025

PRESOLICITATION - EXTENDED Lake George & Monument Fire Center Sewer Line Replacement Pike-San Isabel National Forests & Cimarron and Comanche National Grasslands South Park & Pikes Peak Ranger Districts 1. Introduction. This pre-solicitation notice is for information only and is not a commitment by the Government to solicit contractual offers or award contracts. The Government is not soliciting, nor will it accept proposals as a result of this presolicitation. If a competitive solicitation is issued in the future, it will be announced via The System for Award Management (SAM) at SAM.gov and interested parties must comply with that announcement. The Government will not reimburse respondents for any questions submitted or information provided as a result of this notice. This is not a solicitation or a promise to issue a solicitation, and this information is subject to modification and in no way binds the Government to award a contract. 2. Applicable North American Industry Classification System (NAICS) Code. The applicable NAICS CODE: 237110 Water and Line and Related Structures Construction (Size Standard in millions of dollars $45M). 3. Type of Contract to be Awarded. As a result of this presolicitation and possible solicitation, the Contract Service Area (CSA) Intermountain 8 plans to award a firm fixed price contract. 4. Type of Solicitation. The solicitation, if released, will be governed by Federal Acquisition Regulation Part 15, Contracting by Negotiation . 5. Presolicitation Posting Period. This presolicitation will be posted for 16 days. 6. Contracting Office Points of Contact. Holly Hlavac, Contract Specialist, Holly.Hlavac@usda.gov 7. Contract Background and Description. The existing sewer systems at both sites are of considerable age, nearing the end of useful service life, and have been incurring increased maintenance costs to address clogging and freezing issues. The existing sewer line at Lake George is made of clay pipe and the joints have become offset overtime allowing for root penetration into the sewer line. This results in clogging issues that must be regularly cleaned. The new sewer line will resolve this issue. The existing sewer line at Monument is too shallow and generally freezes over the winter, which renders the bathroom facilities in the Classroom building unusable. The new sewer line installed at a greater depth will resolve this issue. These sites are open and accessible year-round by highway legal vehicles. Approximate site elevations are approximately 7,100 feet at Monument and 8,100 feet at Lake George. Winter conditions (freezing temperatures, snow fall, frozen ground, etc.) can be anticipated approximately October through April. Cellular phone service is generally available at both sites. Scope of Work The project scope of work generally consists of the following: Lake George Work Center Installation of new sanitary sewer service lines from the Brown House and Office buildings to the existing septic tank. Associated and ancillary work includes mobilization, quality control, project management and coordination, utility abandonment/demolition, site demolition, excavation, trenching, backfill, and site surface restoration. Refer to the Project Manual/Specification and Construction Drawings for a full depiction of the work. Monument Fire Center Installation of new sanitary sewer service lines from the Classroom building to an existing sewer manhole. Removal and replacement of existing site water hydrants. Associated and ancillary work includes mobilization, quality control, project management and coordination, utility abandonment/demolition, site demolition, excavation, trenching, backfill, and site surface restoration. Refer to the Project Manual/Specification and Construction Drawings for a full depiction of the work. 8. Project Location. This project consists of work at two Forest Service administrative sites on the Pike-San Isabel National Forests & Cimarron and Comanche National Grasslands: Lake George Work Center South Park Ranger District 140 Trail Creek Road Lake George, CO 80827 Monument Fire Center Pikes Peak Ranger District 3751 Mt. Herman Road Monument, CO 80132 These sites are open and accessible year-round by highway legal vehicles. Winter conditions (freezing temperatures, snow fall, frozen ground, etc.) can be anticipated approximately October through April. 9. Estimated Period of Performance. September 22, 2025, through November 21, 2026 10. Site Visit. A site visit is anticipated; details will be provided at time of Solicitation. 11. Disclosure of Magnitude. The anticipated magnitude for this project is between $25,000 and $100,000. 12. Type of Set-aside. Total small business set-aside. 13. Responses. Interested and capable sources are encouraged to respond to this presolicitation with a Statement of Capability. In addition to a Statement of Capabilities, firms responding to this announcement should include Company Name, Unique Entity Identification, Point of Contact, Address, and indicate whether they are a Small Business, 8(a) Concern, Veteran-Owned Small Business, Service-Disabled Veteran-Owned Business, HUBZone Small Business, Small Disadvantaged Business, or Women-Owned Small Business. Responses are due within 18 days of this presolicitation and should be submitted to Contracting Specialist, Holly Hlavac at Holly.Hlavac@usda.gov.

From Presolicitation posted on Jul 29, 2025

Notice history

2
  1. Presolicitation Posted Jul 09, 2025
  2. Presolicitation LATEST Posted Jul 29, 2025
    • Description: Description was updated
    • Response Deadline: Jul 25, 2025Aug 04, 2025

Details

Solicitation number 1153531
Notice ID 95b2ab775d6f4b419f1408697652f03f
Notice type Presolicitation
Product / Service (PSC) Y1ND
NAICS 237110
Place of performance Pueblo, Colorado
Archive date Aug 09, 2025

Award Information

Not yet awarded

Documents

No files available

View on SAM.gov

Contacts

primary
Holly Hlavac

Email

secondary
Lucas Dahlman

Email

Agency

AGRICULTURE, DEPARTMENT OF
FOREST SERVICE
USDA-FS, CSA INTERMOUNTAIN 8

Place of Performance

Pueblo, Colorado 81008
USA

Dates

Posted Jul 09, 2025 1 year ago
Last Updated Aug 06, 2026 2 days ago
Due Jul 25, 2025 1 year ago