LA RIVER ESTUARY & POLB O&M DREDGING W912PL26BA005
Summary
AI-generated · Aug 07, 2026Dredging and disposal work to clear and maintain federal navigation channels in Los Angeles County, specifically the Los Angeles River Estuary and the Port of Long Beach Approach Channel (San Pedro Bay). About 400,000+ cubic yards of material will be dredged and disposed at an EPA-approved ocean disposal site (LA-2). POLB channel is designed to -76 ft MLLW and the LARE channel down to -25 ft MLLW. The project is a firm-fixed-price construction contract expected to run 130 calendar days after notice to proceed, with an estimated value in the $5–$10 million range. Bidders must be actively registered in SAM (and a JV must have SAM in its JV representation); monitor SAM.gov for amendments, as the procurement may be delayed, canceled, or revised.
Several notices indicate updates to the solicitation: dates related to issue and bid opening have been revised; a revision extends the bid due date and updates wage rates; plan drawings and certain sections have been revised. Some attachments labeled FIO are for information only and not part of the acquisition. Overall, the solicitation is being updated with revised drawings, sections, and wage-rate information, and bidders should routinely check SAM.gov for the latest amendments and requirements.
Dredging of Los Angeles River Estuary and Port of Long Beach (Los Angeles County, CA) Pre-Advertisment for: Construction services consisting of dredging (estimated quantities: 400,000+ cubic yards) and disposal of material from the federal navigation channels of San Pedro Bay, specifically the Approach Channel at the Port of Long Beach (POLB) and the Los Angeles River Estuary (LARE) leading to the Queensway Marina. Disposal of the dredged material will be at an EPA approved ocean disposal site (LA-2). POLB design channel depths are - 76 ft MLLW, and LARE channel depths are as deep as - 25 ft MLLW. Period of Performance/Calendar Days- The total Contract Performance period is 130 Calendar Days after reciept of notice to proceed Procurement: Competitive Type of Contract: Firm-Fixed Price Estimated Construction magnitude is Between $5,000,000 and $10,000,000 The official Invitation for Bid (IFB) is anticipated to be issued June 29 2026 via Contract Opportunities at Sam.gov and inviiting firms to register electronically to recieve a copy of the soliciation when it is issued. Tentative bid opening date is set for July 29 2026 SYSTEM FOR AWARD MANAGEMENT (SAM) REGISTRATION REQUIREMENT: Offerors shall have and shall maintain an active registration in the SAM database at http://www.sam.gov to be eligible for a Government contract award. If the Offeror is a Joint Venture (JV), the JV entity shall have valid SAM registration in the SAM database representing the JV as one business/firm/entity. If at the time of award an Offeror is not actively and successfully registered in the SAM database, the Government reserves the right to award to the next prospective Offeror. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO CHECK THE DESIGNATED GOVERNMENT POINT OF ENTRY- SAM.GOV - FREQUENTLY FOR ANY AMENDMENTS OR CHANGES TO THE SOLICITATION. ALL OFFERORS/BIDDERS ARE ALSO ADVISED THAT THIS PROCUREMENT MAY BE DELAYED, CANCELLED OR REVISED AT ANY TIME DURING THE SOLICITATION, EVALUATION AND/OR FINAL AWARD PROCESS.
From Presolicitation posted on Jun 12, 2026*Updates to Issue and bid opening Dates* Dredging of Los Angeles River Estuary and Port of Long Beach (Los Angeles County, CA) Pre-Advertisment for: Construction services consisting of dredging (estimated quantities: 400,000+ cubic yards) and disposal of material from the federal navigation channels of San Pedro Bay, specifically the Approach Channel at the Port of Long Beach (POLB) and the Los Angeles River Estuary (LARE) leading to the Queensway Marina. Disposal of the dredged material will be at an EPA approved ocean disposal site (LA-2). POLB design channel depths are - 76 ft MLLW, and LARE channel depths are as deep as - 25 ft MLLW. Period of Performance/Calendar Days- The total Contract Performance period is 130 Calendar Days after reciept of notice to proceed Procurement: Competitive Type of Contract: Firm-Fixed Price Estimated Construction magnitude is Between $5,000,000 and $10,000,000 The official Invitation for Bid (IFB) is anticipated to be issued July 13 2026 Revision* via Contract Opportunities at Sam.gov and inviiting firms to register electronically to recieve a copy of the soliciation when it is issued. Revision* Tentative bid opening date is set for August 13 2026 SYSTEM FOR AWARD MANAGEMENT (SAM) REGISTRATION REQUIREMENT: Offerors shall have and shall maintain an active registration in the SAM database at http://www.sam.gov to be eligible for a Government contract award. If the Offeror is a Joint Venture (JV), the JV entity shall have valid SAM registration in the SAM database representing the JV as one business/firm/entity. If at the time of award an Offeror is not actively and successfully registered in the SAM database, the Government reserves the right to award to the next prospective Offeror. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO CHECK THE DESIGNATED GOVERNMENT POINT OF ENTRY- SAM.GOV - FREQUENTLY FOR ANY AMENDMENTS OR CHANGES TO THE SOLICITATION. ALL OFFERORS/BIDDERS ARE ALSO ADVISED THAT THIS PROCUREMENT MAY BE DELAYED, CANCELLED OR REVISED AT ANY TIME DURING THE SOLICITATION, EVALUATION AND/OR FINAL AWARD PROCESS.
From Presolicitation posted on Jun 29, 2026Dredging of Los Angeles River Estuary and Port of Long Beach (Los Angeles County, CA) Construction services consisting of dredging (estimated quantities: 400,000 cubic yards) and disposal of material from the federal navigation channels of San Pedro Bay, specifically the Approach Channel at the Port of Long Beach (POLB) and the Los Angeles River Estuary (LARE) leading to the Queensway Marina. Disposal of the dredged material will be at an EPA approved ocean disposal site (LA-2). POLB design channel depths are ? 76 ft MLLW, and LARE channel depths are as deep as ? 25 ft MLLW. Estimated Construction magnitude is Between $5,000,000 and $10,000,000 NAICS Code 237990 Size Determination Size Determination $45.0M Period of Performance/Calendar Days- *Reference DIV00 Section 00 73 00. BE ADVISED. Files labled with FIO are FOR INFORMATION ONLY. They are not provided as a material part of this acquisition, but are only provided for information only.
From Solicitation posted on Jul 14, 2026AM01 - Extends the due date to 19 Aug 2026, 1300 Local time. Additionally, the wage rates are also updated. Dredging of Los Angeles River Estuary and Port of Long Beach (Los Angeles County, CA) Construction services consisting of dredging (estimated quantities: 400,000 cubic yards) and disposal of material from the federal navigation channels of San Pedro Bay, specifically the Approach Channel at the Port of Long Beach (POLB) and the Los Angeles River Estuary (LARE) leading to the Queensway Marina. Disposal of the dredged material will be at an EPA approved ocean disposal site (LA-2). POLB design channel depths are ? 76 ft MLLW, and LARE channel depths are as deep as ? 25 ft MLLW. Estimated Construction magnitude is Between $5,000,000 and $10,000,000 NAICS Code 237990 Size Determination Size Determination $45.0M Period of Performance/Calendar Days- *Reference DIV00 Section 00 73 00. BE ADVISED. Files labled with FIO are FOR INFORMATION ONLY. They are not provided as a material part of this acquisition, but are only provided for information only.
From Solicitation posted on Jul 31, 2026AM02 - Updates to Sections 00 07 00, 00 73 46, 01 57 19 & revised plan drawings (If issues seeing attachement please request access). AM01 - Extends the due date to 19 Aug 2026, 1300 Local time. Additionally, the wage rates are also updated. Dredging of Los Angeles River Estuary and Port of Long Beach (Los Angeles County, CA) Construction services consisting of dredging (estimated quantities: 400,000 cubic yards) and disposal of material from the federal navigation channels of San Pedro Bay, specifically the Approach Channel at the Port of Long Beach (POLB) and the Los Angeles River Estuary (LARE) leading to the Queensway Marina. Disposal of the dredged material will be at an EPA approved ocean disposal site (LA-2). POLB design channel depths are ? 76 ft MLLW, and LARE channel depths are as deep as ? 25 ft MLLW. Estimated Construction magnitude is Between $5,000,000 and $10,000,000 NAICS Code 237990 Size Determination Size Determination $45.0M Period of Performance/Calendar Days- *Reference DIV00 Section 00 73 00. BE ADVISED. Files labled with FIO are FOR INFORMATION ONLY. They are not provided as a material part of this acquisition, but are only provided for information only.
From Solicitation posted on Aug 07, 2026Notice history
5-
Presolicitation Posted Jun 12, 2026
-
Presolicitation Posted Jun 29, 2026View changes (2)
- Description: Description was updated
- Response Deadline: Jun 26, 2026 → Jul 10, 2026
-
Solicitation Posted Jul 14, 2026View changes (5)
- Title: LA RIVER ESTUARY & POLB O&M DREDGING → Dredging of Los Angeles River Estuary and Port of Long Beach (Los Angeles County, CA)
- Description: Description was updated
- Notice Type: Presolicitation → Solicitation
- Response Deadline: Jul 10, 2026 → Aug 12, 2026
- Status: Inactive → Active
-
Solicitation Posted Jul 31, 2026View changes (2)
- Description: Description was updated
- Response Deadline: Aug 12, 2026 → Aug 19, 2026
Details
Award Information
Not yet awarded
Contacts
Phone
Agency
Place of Performance
USA