L099--Off-Site Inscription Services for NCA Districts 36C78625Q0094
Summary
AI-generated · Aug 24, 2025Off-site inscription services for NCA Districts require a contractor to pickup blank niche covers and memorial wall markers from cemeteries listed in Appendix A, inscribe them per cemetery-specific requirements (including templates for A1 and C1 wall markers and approved emblem usage), and return the completed inscriptions to the government destination. The unit price must cover all labor, materials, equipment, packaging, pickup, and transportation, with FOB Destination applied; the contractor will handle transportation to destinations and must segregate blanks so each cemetery’s blanks are used only for that cemetery. The contractor has seven business days after award to forward packaging materials and arrange pickup, and cemetery personnel will inspect blanks prior to pickup as defined in the SOW; transport is the contractor’s responsibility and completion is achieved when the government accepts the inscribed monuments.
Amendment information updates: questions were answered and the Combined Synopsis/Solicitation and Statement of Work were revised, including added information on inscription samples and clarifications on emblem usage (emblem 60) and spacing, with the emblem height set at 2 inches even if the emblem is wider. The Q&A also confirms that FOB Destination applies per district and clarifies responsibilities around inspections and transfer forms; quoters must acknowledge all amendments, there will be no SF-30 for the amendment, and the stated due date remains unchanged.
Off-Site Inscription Services for NCA Districts
From Combined Synopsis/Solicitation posted on Jul 01, 2025Off-Site Inscription Services for NCA Districts The purpose of this amendment is to address submitted questions and to provide revised combined synopsis/solicitation and Statement of Work documents. The response due date and time is NOT extended and remains 31 July 2025 at 10:00 a.m. CST. The Combined Synopsis/Solicitation and Statemen of Work have been revised and are attached separately to this amendment. The Combined Synopsis/Solicitation has been revised to add additional information regarding samples and to make minor grammatical changes. The Statement of Work has been revised to include, but not limited to, changes to Sections 3.3.1, 3.4, 8.2 and 11.0. Note: There will not be a SF30 to sign for this amendment. Quoters shall provide a statement of acknowledgement and receipt of any and all amendments. Failure to acknowledge all amendments will result in the Interested Quoter being considered non-responsive and ineligible for award. Questions and Answers: Q: Can you please provide the inscription template for the A1 and C1 wall marker samples? A: The Combined Synopsis/Solicitation document has been revised to include this information. Q: The emblem for the I1/H1 samples is #60, Messianic. In the Drawings, General Notes 1. states All emblems when used on stone niche covers shall be 2 at their largest point to point measurement and all other areas in equal proportion. Emblem 60 is wider than it is taller much like emblems 21 and 49. At 2 wide point to point, emblem 60 is only 1 23/32 tall. The sample review letter states for the emblem height to be 2 tall, will this be adjusted to reflect an emblem that is wider than taller or accounted for in the review process? A: The emblem shall be 2 tall and it is known that the emblem may be wider than it is tall. Q: Since Emblem 60 is wider than it is taller, it will affect the Inter-Line Spacing between the top of niche cover and the top of the emblem as well as the spacing between the bottom of the emblem and the top of the First Line (last name), will this be accounted for in the review process? A: The emblem shall be 2 tall. This should not affect the spacing above or below it. Q: In Attachment B Statement of Work Inscription Services for Districts, Section 3.1, The contract states as follows: "FOB Origin Contractor s obligation to deliver the product ends with loading of inscribed headstone/marker(s) onto a government transportation vehicle at the Contractor s facility. A separate contract with a transportation company covers the headstone/marker delivery". My questions regarding this would be: Do we hold the responsibility of retrieving blank niches/Memorial wall markers from each cemetery in the southeastern district? Do we have no obligation nor responsibility of delivery of finished/inscribed markers to each cemetery in the southeastern district? A: Section 3.1 is only for common definitions included in all MPS solicitations. This section also includes the definition of FOB Destination. For each district, the requirement is for FOB Destination. Per SOW Sections to include, but is not limited to: 3.3 Performance period Initial: The Contractor shall have seven (7) business days following the day the contract is awarded to forward packaging material to the cemeteries listed in Appendix A and pick-up or arrange transportation to pick-up the blanks for delivery to the Contractor s location. 3.5 Unit Price: The unit price is all-inclusive and covers the complete inscription ordered, regardless of the total number of lines or characters. The unit price shall be the total price paid for each monument inscription by the Contractor, FOB Destination to include packaging and pick-up of blank monuments from the cemetery and the return of inscribed monuments. 5.2 Contract : This contract includes all labor, materials, equipment, and transportation necessary to pick-up government furnished blank niche covers and memorial wall markers from the cemeteries listed in Appendix A, entitled FOB Destination. It is essential that the Contractor provide inscriptions on the covers specifically provided for each cemetery. The Contractor shall segregate niche covers and wall markers, so the blanks provided for each cemetery are used solely for that cemetery. 12.1 The cemetery is responsible for inspecting blank niche covers or memorial wall markers prior to packing for pick-up by the Contractor or their transportation carrier. The Contractor is NOT responsible for the inspection of blanks at initial pick-up. 12.2 Cemetery personnel will be responsible for completing Appendix B Transfer of Government-Furnished Headstones, Markers or Niche Covers form (NCA Handbook 3320), stating the quantity of blanks for each type that has been inspected for pick-up by the Contractor. A copy of Appendix B should be included in the shipment, a copy retained by the cemetery and a final copy emailed to the Contractor and MPS. 13.0 FOB Destination Procedure and Responsibilities, the transportation for the monument produced and shipped to consignees is the responsibility of the Contractor. 15.4 Completion point for monuments delivered FOB destination. The Contractor s responsibilities are deemed complete upon acceptance by the Government.
From Combined Synopsis/Solicitation posted on Jul 15, 2025Notice history
2-
-
Combined Synopsis/Solicitation LATEST Posted Jul 15, 2025View changes (1)
- Description: Description was updated
Details
Award Information
Contacts
Weston Worsham and Patara Mcdonald
Phone