Kitchenette Remodel FA940126R0009_Kitchenette_Remodel
Summary
AI-generated · Apr 16, 2026Refurbish/remodel three existing kitchenettes in Building 1029 at Kirtland AFB, NM. The contractor shall provide all design, procurement, and installation services, including all necessary services, materials, supplies, equipment, permits, investigations, studies, specifications, drawings, and supervision required by the Statement of Work to complete the project.
All work must strictly comply with applicable codes adopted or modified by the State of New Mexico, Federal requirements, and Kirtland AFB building codes. Review the Statement of Work and attachments for additional information.
This project will be located on Kirtland Air Force Base (AFB), New Mexico. The primary goal of this project is to refurbish/remodel three existing kitchenettes in Building 1029. The Contractor shall furnish all services, materials, supplies, equipment, permits, investigation, studies, specifications, drawings, and supervision as required in connection with this Statement of Work (SOW) for the design, ordering and installation of a successful completed project. All work shall be in strict compliance with all applicable codes as adopted and modified by the state of New Mexico, Federal and Kirtland AFB building codes. Please review the Statement of Work and other attachments for more information.
From Combined Synopsis/Solicitation posted on Apr 15, 2026This project will be located on Kirtland Air Force Base (AFB), New Mexico. The primary goal of this project is to refurbish/remodel three existing kitchenettes in Building 1029. The Contractor shall furnish all services, materials, supplies, equipment, permits, investigation, studies, specifications, drawings, and supervision as required in connection with this Statement of Work (SOW) for the design, ordering and installation of a successful completed project. All work shall be in strict compliance with all applicable codes as adopted and modified by the state of New Mexico, Federal and Kirtland AFB building codes. Please review the Statement of Work and other attachments for more information.
From Combined Synopsis/Solicitation posted on Apr 29, 2026Notice history
2-
Combined Synopsis/Solicitation Posted Apr 15, 2026
-
Combined Synopsis/Solicitation LATEST Posted Apr 29, 2026No changes from previous notice
Details
Award Information
Not yet awarded
Contacts
Phone
Phone
Agency
Place of Performance
USA