AI-generated · Oct 09, 2025Replace the existing partly underground electrical service at Kinzua Dam. The service runs from the meter on a wood panel beside the meter pole, underground to a disconnect switch on the dam exterior, then through exterior rigid metal conduit to an interior automatic transfer switch (ATS). The underground conductors have failed and a temporary aerial feed is in place; the remaining cables from the disconnect to the ATS have very low insulation resistance. Remove and dispose of all conductors from the meter to the ATS and install a new power cable in the existing conduits. Replace the underground conduit in its entirety and replace the end-of-dam disconnect box with a new pull box.
The contractor must remove the temporary power feed after completion, arrange all required inspections, and coordinate with the electric utility (Penelec) to reconnect commercial power. The work includes bituminous pavement removal, trenching and installation of underground conduit, trench backfilling, and other incidental tasks.
The existing electrical service is a partly underground system beginning at the electric meter on wood panel next to the meter pole that then travels underground to a disconnect switch located on the exterior of the dam (see contract drawings), then travels through rigid metal conduit on the exterior of the dam and ends at the automatic transfer switch in the interior of the dam. The existing underground power service conductors have failed and have been bypassed with a temporary aerial service, while the remaining cables from the disconnect switch on the dam to the ATS have very low insulation resistance values. All the power conductors from the meter to the ATS shall be removed and disposed of and new power cable installed in the existing conduits. The underground conduit shall be replaced in its entirety, and the disconnect box at the end of dam shall be replaced with a new pull box. The contractor shall be required to remove the temporary power feed at the completion of the work, arrange for all required inspections, and arrange for the electric utility company, Penelec, to reconnect commercial power. The work also includes bituminous pavement removal, trenching and installation of underground conduit, trench backfilling and other incidental work.
From Solicitation posted on Oct 02, 2025Notice history
1Details
Award Information
Not yet awarded
Contacts
Phone
Agency
Place of Performance