Kinney Creek Trail Bridge Replacement 127EAV26Q0010
Summary
AI-generated · Dec 20, 2025Design, procure, deliver, and install a 40-foot span prefabricated steel truss trail bridge and two rock gabions at a remote site. The project requires helicopter transport for site access and materials; the contractor must coordinate the weight of bridge components with the available helicopter to ensure safe lifting and delivery. Read section L for quote submission instructions, and adhere to the stated deadlines for questions and proposals.
This project consists of design, purchasing, delivering and installing a 40-foot span prefabricated steel truss trail bridge and 2 rock gabions. The site is remote and will require the use of a helicopter for transport. The contractor is responsible for coordinating the weight of the various bridge components with the available helicopter. Please read the entire solicitation thoroughly and follow instructions in section L when submitting your quotes. Questions are due on 19 January 2026 no later than 5:00PM MT Quotes are due on 23 January 2026 no later than 5:00PM MT.
From Combined Synopsis/Solicitation posted on Dec 19, 2025Please review Q&A, updated A6 J3 Drawing Final Bridge Plan, and Amendment to the solicitaion in the attachment section. Quotes are due on 30 January 2026 NLT 1700 MT. This project consists of design, purchasing, delivering and installing a 40-foot span prefabricated steel truss trail bridge and 2 rock gabions. The site is remote and will require the use of a helicopter for transport. The contractor is responsible for coordinating the weight of the various bridge components with the available helicopter. Please read the entire solicitation thoroughly and follow instructions in section L when submitting your quotes. Questions are due on 19 January 2026 no later than 5:00PM MT Quotes are due on 23 January 2026 no later than 5:00PM MT.
From Combined Synopsis/Solicitation posted on Jan 16, 2026Please review additional Q&A in the attachment section. Please review addtional Q&A, updated A6 J3 Drawing Final Bridge Plan, and Amendment to the solicitaion in the attachment section. Quotes are due on 30 January 2026 NLT 1700 MT. This project consists of design, purchasing, delivering and installing a 40-foot span prefabricated steel truss trail bridge and 2 rock gabions. The site is remote and will require the use of a helicopter for transport. The contractor is responsible for coordinating the weight of the various bridge components with the available helicopter. Please read the entire solicitation thoroughly and follow instructions in section L when submitting your quotes. Questions are due on 19 January 2026 no later than 5:00PM MT Quotes are due on 23 January 2026 no later than 5:00PM MT.
From Combined Synopsis/Solicitation posted on Jan 21, 2026Notice history
3-
-
Combined Synopsis/Solicitation Posted Jan 16, 2026View changes (2)
- Description: Description was updated
- Response Deadline: Jan 23, 2026 → Jan 30, 2026
-
Combined Synopsis/Solicitation LATEST Posted Jan 21, 2026View changes (1)
- Description: Description was updated
Details
Award Information
Not yet awarded
Contacts
Phone
Agency
Place of Performance
USA