Keweenaw Upper Breakwater Repairs W911XK25BA026
Summary
AI-generated · Aug 24, 2025Repair and upgrade the West Breakwater in the Keweenaw Waterway (Upper) Entry near Houghton, MI to prevent non-native stamp sand from migrating into the Federally Authorized Channel. The project modifies the breakwater by increasing its height and supplying filter material, with improvements from STA 0+30 to STA 4+00 and optional work from STA 4+00 to STA 4+50. Tasks include excavation, hauling, and disposal of stamp sand within a confined disposal facility; excavation and rework of existing armor stone; and the supply and placement of bedding stone (D-Stone), core stone (C-Stone), and armor stone (A-Stone), along with incidental related work.
Bids are unrestricted. Amendment 0001 updates Wage Determination MI20250045, while the bid suspense date remains August 7, 2025 at 2:00 PM Eastern. A separate amendment also posts the Bid Abstract. The overall scope and location remain as described, focusing on increasing breakwater height and incorporating filter material to keep the channel at the authorized depth.
This Invitation for Bid (IFB) is being solicited as unrestricted. The United States Army Corps of Engineers (USACE) owns and maintains the West Breakwater in the Keweenaw Waterway (Upper) Entry near Houghton, Michigan. The breakwater is approximately 2,645 feet long and consists of timber crib and rubble mound construction. The inner 845 feet is a timber crib with concrete cap covered in armor stone. The remaining 1,800 feet of the breakwater is rock filled timber crib covered in armor stone. The breakwater was constructed as part of several projects that began in 1898 with the outer 1,800 feet finished in 1933. Rehabilitation projects have also been completed on the breakwater with the last occurring in the early 2000s. Non-native stamp sand is currently migrating through and/or over the breakwater into the Federally Authorized Channel which is increasing the frequency and costs related to keeping the channel at its authorized depth. The breakwater will be modified by increasing the height and providing filter material to prevent passage of stamp sand material through and/or over the breakwater into the channel. Improvements will be completed from STA 0+30 to STA 4+00 with optional improvements from STA 4+00 to STA 4+50. The work includes the excavation, hauling, and disposal of stamp sand within the specified confined disposal facility, the excavation and rework of existing armor stone, and supply and placement of bedding stone (D-Stone), core stone (C-Stone), and armor stone (A-Stone), and incidental related work.
From Solicitation posted on Jul 08, 2025**** Amendment 0001 is issued to update Wage Determination MI20250045. The bid suspense date remains the same on August 7, 2025 at 2:00 PM (Eastern). Reference the amendment document for full details. ****This Invitation for Bid (IFB) is being solicited as unrestricted. The United States Army Corps of Engineers (USACE) owns and maintains the West Breakwater in the Keweenaw Waterway (Upper) Entry near Houghton, Michigan. The breakwater is approximately 2,645 feet long and consists of timber crib and rubble mound construction. The inner 845 feet is a timber crib with concrete cap covered in armor stone. The remaining 1,800 feet of the breakwater is rock filled timber crib covered in armor stone. The breakwater was constructed as part of several projects that began in 1898 with the outer 1,800 feet finished in 1933. Rehabilitation projects have also been completed on the breakwater with the last occurring in the early 2000s. Non-native stamp sand is currently migrating through and/or over the breakwater into the Federally Authorized Channel which is increasing the frequency and costs related to keeping the channel at its authorized depth. The breakwater will be modified by increasing the height and providing filter material to prevent passage of stamp sand material through and/or over the breakwater into the channel. Improvements will be completed from STA 0+30 to STA 4+00 with optional improvements from STA 4+00 to STA 4+50. The work includes the excavation, hauling, and disposal of stamp sand within the specified confined disposal facility, the excavation and rework of existing armor stone, and supply and placement of bedding stone (D-Stone), core stone (C-Stone), and armor stone (A-Stone), and incidental related work.
From Solicitation posted on Jul 24, 2025***Posting of the Bid Abstract**** Amendment 0001 is issued to update Wage Determination MI20250045. The bid suspense date remains the same on August 7, 2025 at 2:00 PM (Eastern). Reference the amendment document for full details. ****This Invitation for Bid (IFB) is being solicited as unrestricted. The United States Army Corps of Engineers (USACE) owns and maintains the West Breakwater in the Keweenaw Waterway (Upper) Entry near Houghton, Michigan. The breakwater is approximately 2,645 feet long and consists of timber crib and rubble mound construction. The inner 845 feet is a timber crib with concrete cap covered in armor stone. The remaining 1,800 feet of the breakwater is rock filled timber crib covered in armor stone. The breakwater was constructed as part of several projects that began in 1898 with the outer 1,800 feet finished in 1933. Rehabilitation projects have also been completed on the breakwater with the last occurring in the early 2000s. Non-native stamp sand is currently migrating through and/or over the breakwater into the Federally Authorized Channel which is increasing the frequency and costs related to keeping the channel at its authorized depth. The breakwater will be modified by increasing the height and providing filter material to prevent passage of stamp sand material through and/or over the breakwater into the channel. Improvements will be completed from STA 0+30 to STA 4+00 with optional improvements from STA 4+00 to STA 4+50. The work includes the excavation, hauling, and disposal of stamp sand within the specified confined disposal facility, the excavation and rework of existing armor stone, and supply and placement of bedding stone (D-Stone), core stone (C-Stone), and armor stone (A-Stone), and incidental related work.
From Solicitation posted on Aug 11, 2025Award from Solicitation No. W911XK25BA026 for the Keweenaw Upper Breakwater Repairs project
From Award Notice posted on Sep 02, 2025Notice history
4-
Solicitation Posted Jul 08, 2025
-
Award Notice LATEST Posted Sep 02, 2025
Details
Award Information
Award Notices
Posted: Sep 02, 2025
Award from Solicitation No. W911XK25BA026 for the Keweenaw Upper Breakwater Repairs project
Awardees
| Company Name | UEI | CAGE Code | Location |
|---|---|---|---|
| MICHELS CONSTRUCTION, INC. | CDE7H8M86MB5 | 9C1R4 | Brownsville, WI |