Contacts, documents and full notice history are available with a subscription.
Solicitation SBA Expired 2 notices 5 documents

KETTLE CREST TRAIL RESTORATION COLVILLE NATIONAL FOREST 1240BD25Q009

Solicitation 1240BD25Q009 Copied Notice ID 21be7acad0ee40eeadaa73ac84554d1c Copied AGRICULTURE, DEPARTMENT OF — COLVILLE NATIONAL FOREST
SAM.gov
Posted
Aug 11, 2025
Deadline
Aug 18, 2025
Set-aside
SBA
NAICS
237990
PSC
Z1PA

Summary

AI-generated · Aug 24, 2025

Provide trail maintenance services on the Three Rivers Ranger District, East Side, Colville National Forest to keep trails accessible and safe while preventing resource and facility damage. Work must be performed to the Forest Service Stand Specifications for Construction and Maintenance of Trials (September 1996, EM-7720-103). The contractor will supply all labor, equipment, supervision, transportation, supplies, and incidentals, with specific sub-items, locations, and performance requirements shown in attached maps and the Trail Maintenance Performance Requirement Work Summary Charts (Section J) and related sections. Access is via forest roads usable by standard two-wheel-drive pickups during normal seasons; off-system vehicle operation requires approval; motorized vehicles are restricted on designated trails; motorized equipment (e.g., chainsaws, weed eaters) may be used for maintenance. Desired start is 10 days after award, with a 1-year base period and two optional years, for a possible total of three years.

A subsequent notice extends the solicitation closing date; the rest of the scope remains the same, including the project’s location, standards, and access/operational rules.

Scope of Contract - This contract is to provide services for trail maintenance work on the Three Rivers Ranger District, East Side on the Colville National Forest. The objective of this contract is to provide safe public access on the trails while preventing resource and facility damage, performing all work to the standards found in the Forest Service Stand Specifications for Construction and Maintenance of Trials (September 1996, EM-7720-103). The Contractor shall furnish all labor, equipment, supervision, transportation, supplies and incidentals, necessary to perform all work specified. Location and Description vicinity maps showing project location and access are attached and made a part of this contract. Other information regarding specific sub-items are contained in the trail maintenance work summaries and delivery schedules (see Section J), and in paragraphs 982, 981, 988, and 991 of the trail maintenance specifications, sections 980 through 991. The locations of the trails to be maintained are shown on the attached maps and Trail Maintenance Performance Requirement Work Summary Charts (see Section J). Access All work areas may be reached by forest roads that are accessible by standard two-wheel drive pickup (with snow tires and chains, if needed) during normal operating seasons, unless otherwise indicated on the Trail Maintenance Performance Requirement Work Summary. 2. No vehicles will be permitted to operate off system roads without approval of the Contracting Officer. 3. Motorized vehicles are restricted on all trails as designated with "M" in the Trail Maintenance Performance Requirement Work Summary (reference Section J). 4. Motorized equipment (except motorized vehicles), such as chainsaw, weed eater, may be used for trail maintenance work in this contract. The desired start of work is 10 days after Contract award. Solicitation closes on 14 August 2025 by 2:00 PM Pacific Time. Period of Performance is from contract award through June 15th 2026. This is a one-year contract with 2 Optional Years for a possible total of 3 years. This a Small Business Set Aside. Technical point of contact for this project is Carmen Nielsen at (509) 738-7700 x7761 or e-mail carmen.nielsen@usda.gov Jorge Somoza, Contract Specialist, Phone (509) 423-2224. Email jorge.somoza@usda.gov

From Solicitation posted on Jul 30, 2025

EXTENDING THE CLOSING DATE TO 18 AUGUST 2025 BY 2:00 PM PDST Scope of Contract - This contract is to provide services for trail maintenance work on the Three Rivers Ranger District, East Side on the Colville National Forest. The objective of this contract is to provide safe public access on the trails while preventing resource and facility damage, performing all work to the standards found in the Forest Service Stand Specifications for Construction and Maintenance of Trials (September 1996, EM-7720-103). The Contractor shall furnish all labor, equipment, supervision, transportation, supplies and incidentals, necessary to perform all work specified. Location and Description vicinity maps showing project location and access are attached and made a part of this contract. Other information regarding specific sub-items are contained in the trail maintenance work summaries and delivery schedules (see Section J), and in paragraphs 982, 981, 988, and 991 of the trail maintenance specifications, sections 980 through 991. The locations of the trails to be maintained are shown on the attached maps and Trail Maintenance Performance Requirement Work Summary Charts (see Section J). Access All work areas may be reached by forest roads that are accessible by standard two-wheel drive pickup (with snow tires and chains, if needed) during normal operating seasons, unless otherwise indicated on the Trail Maintenance Performance Requirement Work Summary. 2. No vehicles will be permitted to operate off system roads without approval of the Contracting Officer. 3. Motorized vehicles are restricted on all trails as designated with "M" in the Trail Maintenance Performance Requirement Work Summary (reference Section J). 4. Motorized equipment (except motorized vehicles), such as chainsaw, weed eater, may be used for trail maintenance work in this contract. The desired start of work is 10 days after Contract award. Solicitation closes on 14 August 2025 by 2:00 PM Pacific Time. Period of Performance is from contract award through June 15th 2026. This is a one-year contract with 2 Optional Years for a possible total of 3 years. This a Small Business Set Aside. Technical point of contact for this project is Carmen Nielsen at (509) 738-7700 x7761 or e-mail carmen.nielsen@usda.gov Jorge Somoza, Contract Specialist, Phone (509) 423-2224. Email jorge.somoza@usda.gov

From Solicitation posted on Aug 11, 2025

Notice history

2
  1. Solicitation Posted Jul 30, 2025 View
  2. Solicitation LATEST Posted Aug 11, 2025
    • Description: Description was updated
    • Response Deadline: Aug 14, 2025Aug 18, 2025

Details

Solicitation number 1240BD25Q009
Notice ID 21be7acad0ee40eeadaa73ac84554d1c
Notice type Solicitation
Product / Service (PSC) Z1PA
NAICS 237990
Place of performance Kettle Falls, Washington
Archive date Sep 02, 2025

Award Information

Not yet awarded

Contacts

primary
Jorge A. Somoza

Email

Phone

Agency

AGRICULTURE, DEPARTMENT OF
FOREST SERVICE
COLVILLE NATIONAL FOREST

Place of Performance

Kettle Falls, Washington 99141
USA

Dates

Posted Aug 11, 2025 11 months ago
Last Updated Aug 06, 2026 1 day ago
Due Aug 18, 2025 11 months ago