Contacts, documents and full notice history are available with a subscription.
Solicitation NONE Expired 5 notices 16 documents

Kautz Road Substation Replacement Prefabricated Control House Building and associated Arc Safe 13.8kV Medium Voltage Switchgear KRS-369604-JK

Solicitation KRS-369604-JK Copied Notice ID bd9a70c438e140ca86e0cc830864a32e Copied ENERGY, DEPARTMENT OF — FERMILAB - DOE CONTRACTOR
SAM.gov
Posted
Aug 29, 2025
Deadline
Sep 30, 2025
Set-aside
NONE
NAICS
332311
PSC
3040

Summary

AI-generated · Aug 30, 2025

Provide all labor, materials, tools, equipment, and supervision to supply the Kautz Road Substation Replacement Prefabricated Control House Building and the associated Arc Safe 13.8kV Medium Voltage Switchgear, as detailed in the attached specification and drawings. Deliver the prefabricated control house in full compliance with the specification and drawings, follow the required quality assurance plan, and meet the specified acceptance criteria.

The selected Subcontractor shall provide all labor, materials, tools, equipment, and supervision required to provide the Kautz Road Substation Replacement Prefabricated Control House Building and associated Arc Safe 13.8kV Medium Voltage Switchgear, as delineated in the attached specification and drawings. The selected Subcontractor shall deliver the prefabricated control house building in compliance with all requirements in the specification and drawings documents, in accordance with the required quality assurance plan and subject to the specified acceptance criteria.

From Solicitation posted on Aug 29, 2025

On 9/8/25, Amendment 01 was issued to revise the Subcontractor Annual Representations & Certifications (SARC) form to Rev. 4 and to extend the questions due date and proposal due date. Questions are now due 4pm CT on September 16, 2025. Proposals are now due 4pm CT on October 6, 2025. See attached files for more information. The selected Subcontractor shall provide all labor, materials, tools, equipment, and supervision required to provide the Kautz Road Substation Replacement Prefabricated Control House Building and associated Arc Safe 13.8kV Medium Voltage Switchgear, as delineated in the attached specification and drawings. The selected Subcontractor shall deliver the prefabricated control house building in compliance with all requirements in the specification and drawings documents, in accordance with the required quality assurance plan and subject to the specified acceptance criteria.

From Solicitation posted on Sep 08, 2025

On 9/16/25, Amendment 02 was issued to provide responses to questions from prospective offerors and to add a site visit. The site visit will be held on Wednesday, September 24, 2025 at 10:30am CT. See attached files for more information. On 9/8/25, Amendment 01 was issued to revise the Subcontractor Annual Representations & Certifications (SARC) form to Rev. 4 and to extend the questions due date and proposal due date. Questions are now due 4pm CT on September 16, 2025. Proposals are now due 4pm CT on October 6, 2025. See attached files for more information. The selected Subcontractor shall provide all labor, materials, tools, equipment, and supervision required to provide the Kautz Road Substation Replacement Prefabricated Control House Building and associated Arc Safe 13.8kV Medium Voltage Switchgear, as delineated in the attached specification and drawings. The selected Subcontractor shall deliver the prefabricated control house building in compliance with all requirements in the specification and drawings documents, in accordance with the required quality assurance plan and subject to the specified acceptance criteria.

From Solicitation posted on Sep 16, 2025

On 9/25/25, Amendment 03 was issued to provide the attendance sheet from the pre-proposal meeting/site visit. The amendment also extends the questions due date and proposal due date. Questions are now due 4pm CT on September 29, 2025. Proposals are now due 4pm CT on October 14, 2025. See attached files for more information. On 9/16/25, Amendment 02 was issued to provide responses to questions from prospective offerors and to add a site visit. The site visit will be held on Wednesday, September 24, 2025 at 10:30am CT. See attached files for more information. On 9/8/25, Amendment 01 was issued to revise the Subcontractor Annual Representations & Certifications (SARC) form to Rev. 4 and to extend the questions due date and proposal due date. Questions are now due 4pm CT on September 16, 2025. Proposals are now due 4pm CT on October 6, 2025. See attached files for more information. The selected Subcontractor shall provide all labor, materials, tools, equipment, and supervision required to provide the Kautz Road Substation Replacement Prefabricated Control House Building and associated Arc Safe 13.8kV Medium Voltage Switchgear, as delineated in the attached specification and drawings. The selected Subcontractor shall deliver the prefabricated control house building in compliance with all requirements in the specification and drawings documents, in accordance with the required quality assurance plan and subject to the specified acceptance criteria.

From Solicitation posted on Sep 25, 2025

On 10/3/25, Amendment 04 was issued to provide responses to questions from prospective offerors. See attached files for more information. On 9/25/25, Amendment 03 was issued to provide the attendance sheet from the pre-proposal meeting/site visit. The amendment also extends the questions due date and proposal due date. Questions are now due 4pm CT on September 29, 2025. Proposals are now due 4pm CT on October 14, 2025. See attached files for more information. On 9/16/25, Amendment 02 was issued to provide responses to questions from prospective offerors and to add a site visit. The site visit will be held on Wednesday, September 24, 2025 at 10:30am CT. See attached files for more information. On 9/8/25, Amendment 01 was issued to revise the Subcontractor Annual Representations & Certifications (SARC) form to Rev. 4 and to extend the questions due date and proposal due date. Questions are now due 4pm CT on September 16, 2025. Proposals are now due 4pm CT on October 6, 2025. See attached files for more information. The selected Subcontractor shall provide all labor, materials, tools, equipment, and supervision required to provide the Kautz Road Substation Replacement Prefabricated Control House Building and associated Arc Safe 13.8kV Medium Voltage Switchgear, as delineated in the attached specification and drawings. The selected Subcontractor shall deliver the prefabricated control house building in compliance with all requirements in the specification and drawings documents, in accordance with the required quality assurance plan and subject to the specified acceptance criteria.

From Solicitation posted on Oct 03, 2025

Notice history

5
  1. Solicitation Posted Aug 29, 2025
  2. Solicitation Posted Sep 08, 2025
    • Description: Description was updated
    • Response Deadline: Sep 30, 2025Oct 06, 2025
  3. Solicitation Posted Sep 16, 2025
    • Description: Description was updated
  4. Solicitation Posted Sep 25, 2025
    • Description: Description was updated
    • Response Deadline: Oct 06, 2025Oct 14, 2025
  5. Solicitation LATEST Posted Oct 03, 2025
    • Description: Description was updated

Details

Solicitation number KRS-369604-JK
Notice ID bd9a70c438e140ca86e0cc830864a32e
Notice type Solicitation
Product / Service (PSC) 3040
NAICS 332311
Set-aside No Set aside used
Place of performance Batavia, Illinois
Archive date Oct 15, 2025

Award Information

Not yet awarded

Contacts

primary
Danielle Amico

Email

Phone

secondary
Chris Bushman

Email

Phone

Agency

ENERGY, DEPARTMENT OF
ENERGY, DEPARTMENT OF
FERMILAB - DOE CONTRACTOR

Place of Performance

Batavia, Illinois
USA

Dates

Posted Aug 29, 2025 11 months ago
Last Updated Aug 06, 2026 2 days ago
Due Sep 30, 2025 10 months ago