Kaukauna Right Abutment Repairs W912P624B0024
Summary
AI-generated · Aug 24, 2025Demolish the existing un-grouted stacked stone wall along the upstream right (south) dam approach and replace it with a new reinforced cast-in-place concrete wall. The new wall will be about 220 feet long and designed to match the surveyed alignment and elevations of the existing wall.
The replacement wall ties into an existing concrete-capped stone wall at the southeast end, which connects to the right (south) abutment of the Kaukauna Dam. The current wall forms the south edge of the main channel of the Lower Fox River immediately upstream of the dam.
This project consists of demolition of the existing un-grouted stacked stone w all along the upstream right (south) dam approach, and construction of a new reinforced cast-in-place concrete w all in its place. The new w all w ill be approximately 220 feet long and w ill be constructed to approximately match the surveyed existing w all alignment and elevations. The existing stone w all to be replaced ties into an existing concrete capped stone w all at the southeast end. The capped stone portion of w all ties into the right (south) abutment of the Kaukauna Dam. The existing w all forms the south edge of the main channel of the Low er Fox River directly upstream of the dam.
From Solicitation posted on Aug 21, 2025This project consists of demolition of the existing un-grouted stacked stone w all along the upstream right (south) dam approach, and construction of a new reinforced cast-in-place concrete w all in its place. The new w all w ill be approximately 220 feet long and w ill be constructed to approximately match the surveyed existing w all alignment and elevations. The existing stone w all to be replaced ties into an existing concrete capped stone w all at the southeast end. The capped stone portion of w all ties into the right (south) abutment of the Kaukauna Dam. The existing w all forms the south edge of the main channel of the Low er Fox River directly upstream of the dam.
From Solicitation posted on Sep 16, 2025Notice history
2-
Solicitation Posted Aug 21, 2025
-
Solicitation LATEST Posted Sep 16, 2025View changes (1)
- Response Deadline: Sep 22, 2025 → Sep 24, 2025
Details
Award Information
Not yet awarded
Contacts
Phone