Kane Experimental Roof Replacements 12445525Q0105
Summary
AI-generated · Aug 29, 2025Replace the roof on six buildings at Kane Experimental Forest Headquarters by removing about 7,100 square feet of existing asphalt shingles, underlayment, flashings, drip edge, and fasteners, then installing a full replacement roof with synthetic underlayment, architectural shingles, new drip edge, valley/ridge shingles, step flashings, and all penetrations to achieve a watertight seal. Remove and reinstall lightning protection as needed. An additional line item covers replacement of damaged sheathing and roof supports discovered after removal, with COR approval required for sheathing and supports; demo the metal chimney on the bunkhouse roof and patch the sheathing in preparation for reroofing. Sheathing will be standard plywood or OSB (including 5/8 inch plywood or 7/16 inch OSB, per project specs). The work includes mobilization, equipment, labor, materials, tools, supervision, safety, and all related items per contract specs and drawings, and Davis-Bacon wage requirements apply.
A site visit is scheduled at the Irvine Office; attendance should be coordinated with the designated contact. This is a construction RFQ issued under FAR Part 14; bids must come from bidders with an active SAM.gov registration on bid receipt; no hard copies will be provided; all questions must be submitted by the stated deadline, and bidders should review the attached RFQ and supporting documents for full details and submission instructions.
The U.S. Department of Agriculture, Forest Service announces an opportunity on the Northern Research Station, , Kane Experimental Forest, Kane, PA for the following: The NRS Kane Roof Replacements project shall consist of the removal and legal disposal of the approximately 7,100 square feet of existing asphalt shingles, underlayment, flashings, drip edge, and fasteners on six buildings at the Kane Experimental Forest Headquarters. After removal, the work shall also include the installation of full replacement of synthetic underlayment, architectural shingle roof, drip edge, valley/ridge shingles, as well as the installation of step flashings, pipe/vent/chimney penetration flashings, and other items associated with a watertight roofing installation. Remove and reinstall lightening protections components as necessary. There is an additional line item (Item 4) for replacement of damaged sheathing and roof supports as discovered after roof removal. Additionally, demo the metal chimney on the bunkhouse roof and patch the sheathing in preparation for reroofing. Replace sheathing and supports only with COR approval. The following sheathing and support quantities are estimated to be needed. All sheathing is expected to be , , or 5/8 plywood or 7/16 OSB. Damage supports are located around the bunkhouse chimney and quantities are expected to be 10ft length or less of 2x6 structural lumber. This work shall consist of the Contractor providing any and all mobilization, equipment, labor, materials, tools, supervision, safety and other incidentals necessary to perform all work for the specified construction activities in accordance with the Schedule of Items, Forest Service Supplemental Specification (FSSS), Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects per FP-14 Specifications, all supporting project specific drawings, contract, laws, rules, and regulations. The Davis-Bacon and Related Acts (DBRA) apply to this solicitation and is set-aside for small businesses. See attachments for complete details and bid submission instructions. There is a Site Visit at the following directions: Irvine Office, 335 National Forge Rd, Irvine, PA 16329 on 9/10/25 at 0900 am EDT. Coordinates are as follows: 41.598016, -78.765587 Please contact Ray White if you will attend at ray.white@usda.gov or 681-209-0585. See Solicitation Section L, 52.236-27 Site Visit (Construction) for more information. This announcement constitutes a solicitation for construction issued as a Request for Quote(RFQ) in accordance with FAR Part 14. Interested contractors must be active in SAM.gov on the date the bid is received to be eligible for award. Quotes submitted by contractors without an active record in SAM.gov will not be considered. The solicitation is posted to SAM.gov and no hard copies of the solicitation, supporting documents and applicable amendments, if any, will be provided. No reimbursement will be made for any costs associated with providing information in response to this solicitation or any follow up information requests. For further information, review the attached RFQ solicitation and associated attachments. All questions shall be submitted by 9/12/2025.
From Solicitation posted on Aug 28, 2025AWARD DECISION 12445525C0021: NRS Northern Research Station Roof Replacements Background: The National Research Station wishes to order Kane Roof Replacements. Decision: Chief Construction Co Inc. maintain an active registration in www.sam.gov; they have a highly favorable performance record in CPARS; they have no debarments, suspensions, or federal tax delinquencies; and are otherwise eligible to receive this BPA (see full responsibility determination on file). The unit pricing was determined to be fair and reasonable at time of award for 12445525C0021. Pricing was below IGCE. Market conditions since contract award do not trend towards reductions in pricing: and the minimal quantities required, would not favor the possibility of bulk discount(s). It is in the government's interest to award this task order to Howard Bros Inc. for the pre-determined amount of $42,500. Michelle Reed Contract Specialist 9/23/2025
From Award Notice posted on Sep 26, 2025Notice history
2-
-
Award Notice LATEST Posted Sep 26, 2025
Details
Award Information
Award Notices
Posted: Sep 26, 2025
AWARD DECISION 12445525C0021: NRS Northern Research Station Roof Replacements Background: The National Research Station wishes to order Kane Roof Replacements. Decision: Chief Construction Co Inc. maintain an active registration in www.sam.gov; they have a highly favorable performance record in CPAR...
Awardees
| Company Name | UEI | CAGE Code | Location |
|---|---|---|---|
| CHIEF CONSTRUCTION CO INC. | GYN4XMA1VMT9 | 9HWC9 | San Antonio, TX |