Contacts, documents and full notice history are available with a subscription.
Special Notice Expired 1 notice

Joint Assault Bridge (JAB) Notice of Change in Requirements JAB-Requirement-Change-Notice

Solicitation JAB-Requirement-Change-Notice Copied Notice ID 432c3b5a8cd5469392920279b990da62 Copied DEPT OF DEFENSE — ACC WRN
SAM.gov
Posted
Sep 17, 2025
Deadline
Sep 26, 2025
Set-aside
None
NAICS
336992
PSC
5420

Summary

AI-generated · Sep 28, 2025

JAB chassis requirements have been revised downward. The previously posted DRAFT RFP contemplated about 126 JAB chassis to meet an Authorized Objective of 297, with related storage, tooling, and retrofit work. In 2025, the Army reduced the objective to 256 and then to an Army Procurement Objective of 213, effectively lowering the planned quantity to about 42 chassis. The government currently intends to order 20 JAB chassis in FY26 under the existing DRS Sustainment Systems contract, and the retrofit of 120 systems is now a future-year requirement to be pursued under a separate solicitation.

No formal proposal is being requested at this time. This notice is to inform industry of the change in requirements. If interested, respond in writing to the listed points of contact by late September 2025.

NOTICE TO INDUSTRY Disclaimer: This is a Notice to Industry on a change in requirements and is not a request for competitive proposals or a solicitation of offers. The Government does not intend to award a contract based on the information contained in this posting or information received as a result of this posting. Subject: Notice to Industry for change in requirements for Joint Assault Bridge (JAB) W912CH-25-R-0022. Background: The M1110 JAB is an Army Acquisition Category (ACAT) II program replacing the legacy M48/M60 tank-based Armored Vehicle Launched Bridge (AVLB) and Wolverine systems. The JAB system is a fully-tracked armored combat engineer vehicle specifically designed to provide Armored Brigade Combat Teams assault bridging capabilities to support maneuver elements. Using the M1A1 (with A2 suspension) Abrams chassis as the basis for the system, the JAB provides equivalent crew protection and vehicle survivability, while having the necessary speed and cross-country mobility to keep pace with maneuver forces. The JAB launches and recovers the Army s existing hydraulically actuated Heavy Assault Scissor Bridge (HASB), Military Load Class (MLC) 115. Purpose: The purpose of this notice is to notify industry of the change in requirements for the quantity of JAB Chassis as posted on the DRAFT RFP released on 19March2025. Army Contracting Command - Detroit Arsenal (ACC-DTA) is issuing this Market Notice on behalf of the requiring activity, Project Manager Force Projection (PM-FP) Product Manager Bridging (PdM Bridging), as a means of providing full transparency regarding the JAB production requirement. REFERENCE: SAM NOTICE: "JAB-Sources-Sought-September-2025" for a Sources Sought Notice to identify interested parties with resources to support the JAB requirements for an estimated 18 JAB Chassis, as identified above. The DRAFT RFP released 19March2025 included: An estimated 126 JAB Chassis on a Firm-Fixed Price (FFP) basis to complete the Army Authorized Objective (AAO) of 297. Authorized Stockage List (ASL) and Special Tools and Test Equipment (STTE) on a FFP basis to meet fielding requirements Storage on a FFP basis Retrofit Material on a FFP basis for the Retrofit of 120 systems with Armor and other ECPs Retrofit Labor on a Cost-Plus Fixed Fee (CPFF) basis to support the retrofit of 120 systems In June 2025, the AAO was reduced from 297 to 256 JAB systems, which was further reduced in July 2025 from 256 to an Army Procurement Objective (APO) of 213 JAB systems. This reflects a reduction of an estimated 84 systems or 66% from the estimated 126 systems to 42 systems. The current contract with DRS Sustainment Systems Incorporated (DRS-SSI) includes an Option to order additional JAB Chassis through 10May2026, and as a result, the Government intends on ordering the estimated FY26 quantity of 20 systems from DRS-SSI prior to 10May2026. Retrofit of an estimated 120 systems, as solicited under the DRAFT RFP is now future year requirement and is anticipated to be solicited under separate requirement. A formal response is Not Required: Please respond in writing, no later than 26 September 2025 to both Mr. Michael Ibra Email: Michael.ibra.civ@army.mil and Mr. Jason MacFarland Email: jason.c.macfarland.civ@army.mil

From Special Notice posted on Sep 17, 2025

Notice history

1
  1. Special Notice LATEST Posted Sep 17, 2025

Details

Solicitation number JAB-Requirement-Change-Notice
Notice ID 432c3b5a8cd5469392920279b990da62
Notice type Special Notice
Product / Service (PSC) 5420
NAICS 336992
Place of performance Warren, Michigan
Archive date Oct 11, 2025

Award Information

Not yet awarded

Documents

No files available

View on SAM.gov

Contacts

primary
Mike Ibra

Email

Agency

DEPT OF DEFENSE
DEPT OF THE ARMY
AMC
ACC
ACC-CTRS
ACC WRN

Place of Performance

Warren, Michigan
USA

Dates

Posted Sep 17, 2025 10 months ago
Last Updated Aug 06, 2026 2 days ago
Due Sep 26, 2025 10 months ago