John Day Fish Pump Rehabilitation W9127N26BA001
Summary
AI-generated · Feb 10, 2026Rehabilitate large vertical turbine fish-passage pumps at John Day Dam to address urgent reliability issues with the John Day South Fish Ladder pumps. Scope covers removal, refurbishment, and replacement of major components for Fish Pump Units 1 and 2, including shafts, bearings, brackets, and right-angle drive gearboxes, with disassembly of existing equipment, transport for off-site shop repair, precision machining, fabrication of replacement parts, and final reinstallation and alignment to manufacturer specifications.
The work is located at John Day Dam on the Columbia River near Rufus, Oregon and involves coordinating precision mechanical rehabilitation to restore proper fish passage facility operation.
The U.S. Army Corps of Engineers Portland District intends to issue an Invitation for Bids (IFB) NO. W9127N26BA001 for John Day Fish Pump Rehabilitation Project. The rehabilitation project includes major mechanical rehabilitation work on large vertical turbine pumps associated with fish passage facilities at John Day Dam, located on the Columbia River near Rufus, Oregon. This requirement will address urgent reliability issues with the John Day South Fish Ladder turbine pumps. The project will include the removal, refurbishment, and replacement of major components of Fish Pump Units 1 and 2, including but not limited to shafts, bearings, brackets, and right-angle drive gearboxes. Work will require disassembly of existing equipment, transport of components for off-site shop repair, precision machining, fabrication of replacement parts, and final reinstallation and alignment to manufacturer specifications. The overall period of performance will be from June 2026 to December 2028 for physical completion of all work to include all options. The forthcoming solicitation is subject to the availability of funds. The solicitation will be available for download on or about 25 February 2026 with bids due 30 days after advertisement. This procurement is anticipated to be solicited as a Small Business Set Aside. The NAICS code for this procurement is 237990. The small business size standard is $45 million. The magnitude of construction is $1,000,000 to $5,000,000. This is not a solicitation. This notice is not an invitation for bids and any bids received as a result of this pre-solicitation notice will not be accepted or evaluated. The government reserves the right to cancel this solicitation either before or after the closing date. No reimbursement will be made for any costs associated with providing information in response to this pre-solicitation notice or any follow-up information request.
From Presolicitation posted on Feb 09, 2026The U.S. Army Corps of Engineers (USACE) Portland District is soliciting a Contract for the John Day Fish Pump Rehabilitation at John Day Dam, Oregon. The proposed project will be a Total Small Business Set-Aside, firm-fixed price (FFP) contract. Background: Prior work on fish pump No.3 included replacement of the lower pump shaft, true-up machining of the upper pump shaft, true-up machining of the upper and lower bearing mounting flanges and spigot bores on the cover plate and diffuser, and true-up machining of the diffuser extension cone. The propeller itself had its blade tips built up with weld and re-machined a proper clearance (nominally 1/8" radial clearance) to the pit liner. In addition, the propeller center bores were true-up machined for proper fit (0.004-0.006" clearance) to the new lower shaft. The upper and lower bearings were fitted with greaseless bearing liners and the shafts existing stainless bearing journals were replaced with spares originally manufactured by Worthington Pump. work will be replicated for pump No.2 and possible pump No.1 and No. 3. Purpose: The project will include the removal, refurbishment, and replacement of major components of Fish Pump Units 1, 2 and 3, including but not limited to shafts, bearings, bearing brackets, and right-angle drive gearboxes. Work will require field disassembly of existing equipment, transport of components for off-site shop repair, precision machining, fabrication of replacement parts, and final reinstallation and alignment to manufacturer specifications. The following information represents the project objectives: Removal and replacement of damaged pump shafts and bearings. Repair-by-replacement of approximately 1000 horsepower class power transmission and reduction gearbox. Precision machining (true-up) of shafts, bearing housings, and diffuser components. Installation of greaseless bearing liners and replacement of stainless-steel bearing journals. On-site reassembly, shaft alignment, gearbox installation, and system balancing. Testing of the completed pump unit(s) to verify functional performance. Delivery of updated operation and maintenance manuals, drawings, and spare parts.
From Solicitation posted on Apr 08, 2026W9127N26BA001 Amendment 0001 posted 9 April 2026 --------------------------------------------------- The U.S. Army Corps of Engineers (USACE) Portland District is soliciting a Contract for the John Day Fish Pump Rehabilitation at John Day Dam, Oregon. The proposed project will be a Total Small Business Set-Aside, firm-fixed price (FFP) contract. Background: Prior work on fish pump No.3 included replacement of the lower pump shaft, true-up machining of the upper pump shaft, true-up machining of the upper and lower bearing mounting flanges and spigot bores on the cover plate and diffuser, and true-up machining of the diffuser extension cone. The propeller itself had its blade tips built up with weld and re-machined a proper clearance (nominally 1/8" radial clearance) to the pit liner. In addition, the propeller center bores were true-up machined for proper fit (0.004-0.006" clearance) to the new lower shaft. The upper and lower bearings were fitted with greaseless bearing liners and the shafts existing stainless bearing journals were replaced with spares originally manufactured by Worthington Pump. work will be replicated for pump No.2 and possible pump No.1 and No. 3. Purpose: The project will include the removal, refurbishment, and replacement of major components of Fish Pump Units 1, 2 and 3, including but not limited to shafts, bearings, bearing brackets, and right-angle drive gearboxes. Work will require field disassembly of existing equipment, transport of components for off-site shop repair, precision machining, fabrication of replacement parts, and final reinstallation and alignment to manufacturer specifications. The following information represents the project objectives: Removal and replacement of damaged pump shafts and bearings. Repair-by-replacement of approximately 1000 horsepower class power transmission and reduction gearbox. Precision machining (true-up) of shafts, bearing housings, and diffuser components. Installation of greaseless bearing liners and replacement of stainless-steel bearing journals. On-site reassembly, shaft alignment, gearbox installation, and system balancing. Testing of the completed pump unit(s) to verify functional performance. Delivery of updated operation and maintenance manuals, drawings, and spare parts.
From Solicitation posted on Apr 09, 2026W9127N26BA001 Amendment 0003 posted 1 May 2026 W9127N26BA001 Amendment 0002 posted 22 April 2026 W9127N26BA001 Amendment 0001 posted 9 April 2026 --------------------------------------------------- The U.S. Army Corps of Engineers (USACE) Portland District is soliciting a Contract for the John Day Fish Pump Rehabilitation at John Day Dam, Oregon. The proposed project will be a Total Small Business Set-Aside, firm-fixed price (FFP) contract. Background: Prior work on fish pump No.3 included replacement of the lower pump shaft, true-up machining of the upper pump shaft, true-up machining of the upper and lower bearing mounting flanges and spigot bores on the cover plate and diffuser, and true-up machining of the diffuser extension cone. The propeller itself had its blade tips built up with weld and re-machined a proper clearance (nominally 1/8" radial clearance) to the pit liner. In addition, the propeller center bores were true-up machined for proper fit (0.004-0.006" clearance) to the new lower shaft. The upper and lower bearings were fitted with greaseless bearing liners and the shafts existing stainless bearing journals were replaced with spares originally manufactured by Worthington Pump. work will be replicated for pump No.2 and possible pump No.1 and No. 3. Purpose: The project will include the removal, refurbishment, and replacement of major components of Fish Pump Units 1, 2 and 3, including but not limited to shafts, bearings, bearing brackets, and right-angle drive gearboxes. Work will require field disassembly of existing equipment, transport of components for off-site shop repair, precision machining, fabrication of replacement parts, and final reinstallation and alignment to manufacturer specifications. The following information represents the project objectives: Removal and replacement of damaged pump shafts and bearings. Repair-by-replacement of approximately 1000 horsepower class power transmission and reduction gearbox. Precision machining (true-up) of shafts, bearing housings, and diffuser components. Installation of greaseless bearing liners and replacement of stainless-steel bearing journals. On-site reassembly, shaft alignment, gearbox installation, and system balancing. Testing of the completed pump unit(s) to verify functional performance. Delivery of updated operation and maintenance manuals, drawings, and spare parts.
From Solicitation posted on May 01, 2026W9127N26BA001 Contractor JD Fish Pump Site Visit Roster posted 4 May 2026 W9127N26BA001 Amendment 0003 posted 1 May 2026 W9127N26BA001 Amendment 0002 posted 22 April 2026 W9127N26BA001 Amendment 0001 posted 9 April 2026 --------------------------------------------------- The U.S. Army Corps of Engineers (USACE) Portland District is soliciting a Contract for the John Day Fish Pump Rehabilitation at John Day Dam, Oregon. The proposed project will be a Total Small Business Set-Aside, firm-fixed price (FFP) contract. Background: Prior work on fish pump No.3 included replacement of the lower pump shaft, true-up machining of the upper pump shaft, true-up machining of the upper and lower bearing mounting flanges and spigot bores on the cover plate and diffuser, and true-up machining of the diffuser extension cone. The propeller itself had its blade tips built up with weld and re-machined a proper clearance (nominally 1/8" radial clearance) to the pit liner. In addition, the propeller center bores were true-up machined for proper fit (0.004-0.006" clearance) to the new lower shaft. The upper and lower bearings were fitted with greaseless bearing liners and the shafts existing stainless bearing journals were replaced with spares originally manufactured by Worthington Pump. work will be replicated for pump No.2 and possible pump No.1 and No. 3. Purpose: The project will include the removal, refurbishment, and replacement of major components of Fish Pump Units 1, 2 and 3, including but not limited to shafts, bearings, bearing brackets, and right-angle drive gearboxes. Work will require field disassembly of existing equipment, transport of components for off-site shop repair, precision machining, fabrication of replacement parts, and final reinstallation and alignment to manufacturer specifications. The following information represents the project objectives: Removal and replacement of damaged pump shafts and bearings. Repair-by-replacement of approximately 1000 horsepower class power transmission and reduction gearbox. Precision machining (true-up) of shafts, bearing housings, and diffuser components. Installation of greaseless bearing liners and replacement of stainless-steel bearing journals. On-site reassembly, shaft alignment, gearbox installation, and system balancing. Testing of the completed pump unit(s) to verify functional performance. Delivery of updated operation and maintenance manuals, drawings, and spare parts.
From Solicitation posted on May 04, 2026W9127N26BA001 Abstract of Offers posted 21 May 2026 W9127N26BA001 Amendment 0004 posted 12 May 2026 Update: Bidder Inquiries in ProjNet will close at the end of the day (6 MAY 2026) and all responses will be posted on or before the 7th business day preceding the bid submission IAW the solicitation. W9127N26BA001 Contractor JD Fish Pump Site Visit Roster posted 4 May 2026 W9127N26BA001 Amendment 0003 posted 1 May 2026 W9127N26BA001 Amendment 0002 posted 22 April 2026 W9127N26BA001 Amendment 0001 posted 9 April 2026 --------------------------------------------------- The U.S. Army Corps of Engineers (USACE) Portland District is soliciting a Contract for the John Day Fish Pump Rehabilitation at John Day Dam, Oregon. The proposed project will be a Total Small Business Set-Aside, firm-fixed price (FFP) contract. Background: Prior work on fish pump No.3 included replacement of the lower pump shaft, true-up machining of the upper pump shaft, true-up machining of the upper and lower bearing mounting flanges and spigot bores on the cover plate and diffuser, and true-up machining of the diffuser extension cone. The propeller itself had its blade tips built up with weld and re-machined a proper clearance (nominally 1/8" radial clearance) to the pit liner. In addition, the propeller center bores were true-up machined for proper fit (0.004-0.006" clearance) to the new lower shaft. The upper and lower bearings were fitted with greaseless bearing liners and the shafts existing stainless bearing journals were replaced with spares originally manufactured by Worthington Pump. work will be replicated for pump No.2 and possible pump No.1 and No. 3. Purpose: The project will include the removal, refurbishment, and replacement of major components of Fish Pump Units 1, 2 and 3, including but not limited to shafts, bearings, bearing brackets, and right-angle drive gearboxes. Work will require field disassembly of existing equipment, transport of components for off-site shop repair, precision machining, fabrication of replacement parts, and final reinstallation and alignment to manufacturer specifications. The following information represents the project objectives: Removal and replacement of damaged pump shafts and bearings. Repair-by-replacement of approximately 1000 horsepower class power transmission and reduction gearbox. Precision machining (true-up) of shafts, bearing housings, and diffuser components. Installation of greaseless bearing liners and replacement of stainless-steel bearing journals. On-site reassembly, shaft alignment, gearbox installation, and system balancing. Testing of the completed pump unit(s) to verify functional performance. Delivery of updated operation and maintenance manuals, drawings, and spare parts.
From Solicitation posted on May 21, 202616 June 2026 - Per RFO 14.305(b)(6), as all otherwise acceptable bids received are at unreasonable prices, it has been determined that it is necessary to cancel the invitation and reject all bids received before award but after bid opening. W9127N26BA001 Abstract of Offers posted 21 May 2026 W9127N26BA001 Amendment 0004 posted 12 May 2026 Update: Bidder Inquiries in ProjNet will close at the end of the day (6 MAY 2026) and all responses will be posted on or before the 7th business day preceding the bid submission IAW the solicitation. W9127N26BA001 Contractor JD Fish Pump Site Visit Roster posted 4 May 2026 W9127N26BA001 Amendment 0003 posted 1 May 2026 W9127N26BA001 Amendment 0002 posted 22 April 2026 W9127N26BA001 Amendment 0001 posted 9 April 2026 --------------------------------------------------- The U.S. Army Corps of Engineers (USACE) Portland District is soliciting a Contract for the John Day Fish Pump Rehabilitation at John Day Dam, Oregon. The proposed project will be a Total Small Business Set-Aside, firm-fixed price (FFP) contract. Background: Prior work on fish pump No.3 included replacement of the lower pump shaft, true-up machining of the upper pump shaft, true-up machining of the upper and lower bearing mounting flanges and spigot bores on the cover plate and diffuser, and true-up machining of the diffuser extension cone. The propeller itself had its blade tips built up with weld and re-machined a proper clearance (nominally 1/8" radial clearance) to the pit liner. In addition, the propeller center bores were true-up machined for proper fit (0.004-0.006" clearance) to the new lower shaft. The upper and lower bearings were fitted with greaseless bearing liners and the shafts existing stainless bearing journals were replaced with spares originally manufactured by Worthington Pump. work will be replicated for pump No.2 and possible pump No.1 and No. 3. Purpose: The project will include the removal, refurbishment, and replacement of major components of Fish Pump Units 1, 2 and 3, including but not limited to shafts, bearings, bearing brackets, and right-angle drive gearboxes. Work will require field disassembly of existing equipment, transport of components for off-site shop repair, precision machining, fabrication of replacement parts, and final reinstallation and alignment to manufacturer specifications. The following information represents the project objectives: - Removal and replacement of damaged pump shafts and bearings. - Repair-by-replacement of approximately 1000 horsepower class power transmission and reduction gearbox. - Precision machining (true-up) of shafts, bearing housings, and diffuser components. - Installation of greaseless bearing liners and replacement of stainless-steel bearing journals. - On-site reassembly, shaft alignment, gearbox installation, and system balancing. - Testing of the completed pump unit(s) to verify functional performance. - Delivery of updated operation and maintenance manuals, drawings, and spare parts.
From Solicitation posted on Jun 16, 2026Notice history
7-
-
Solicitation Posted Apr 08, 2026View changes (4)
- Title: John Day Fish Rehabilitation → John Day Fish Pump Rehabilitation
- Description: Description was updated
- Notice Type: Presolicitation → Solicitation
- Response Deadline: Feb 24, 2026 → May 08, 2026
-
Solicitation Posted Apr 09, 2026View changes (2)
- Description: Description was updated
- Response Deadline: May 08, 2026 → May 13, 2026
-
Solicitation Posted May 01, 2026View changes (2)
- Description: Description was updated
- Response Deadline: May 13, 2026 → May 20, 2026
Details
Award Information
Not yet awarded
Contacts
Agency
Place of Performance
USA