John Day Dam Turbine Replacement and Generator Rewind Project - J&A for Brand Name Sole Source W9127N23R0003-SS
Summary
AI-generated · Nov 13, 2025Replacement of turbines at John Day Dam in Oregon and Washington under the Turbine Runner Replacement and Generator Rewind (TRGR) project requires design, testing, manufacturing, and installation of up to 16 new turbine runners, plus refurbishment and/or replacement of ancillary turbine components to include up to 16 generator rewinds.
Brand-name components are specified in the contract work specifications because substitutions cannot be accepted; a justification and approval for other than full and open competition (J&A) documents the sole-source rationale. See the attached J&A for full details.
The U.S. Army Corps of Engineers (USACE), Portland District (NWP), Contracting Division, has a requirement to replace turbines at John Day Dam in Oregon and Washington. This justification and approval for other than full and open competition is for the specification of brand name components in the contract work specifications for the John Day Turbine Runner Replacement and Generator Rewind project (TRGR). The scope includes everything necessary to design, test, manufacture and install up to 16 new turbine runners, as well as the refurbishment and/or replacement of other ancillary turbine components to include up to 16 generator rewinds. The brand name items listed are those for which USACE is not able accept equal or alternate items. Please see attached J&A for additional details.
From Sources Sought posted on Nov 12, 2025The U.S. Army Corps of Engineers (USACE), Portland District (NWP), Contracting Division, has a requirement to replace turbines at John Day Dam in Oregon and Washington. This justification and approval for other than full and open competition is for the specification of brand name components in the contract work specifications for the John Day Turbine Runner Replacement and Generator Rewind project (TRGR). The scope includes everything necessary to design, test, manufacture and install up to 16 new turbine runners, as well as the refurbishment and/or replacement of other ancillary turbine components to include up to 16 generator rewinds. The brand name items listed are those for which USACE is not able accept equal or alternate items. Please see attached J&A for additional details.
From Sources Sought posted on Nov 26, 2025Notice history
2-
Sources Sought Posted Nov 12, 2025
-
Sources Sought LATEST Posted Nov 26, 2025No changes from previous notice
Details
Award Information
Not yet awarded