JLG Reburbish W50S7Y25Q0004
Summary
AI-generated · Sep 10, 2025JLG lift refurbishment is required for the 190th Maintenance Squadron. The work includes replacing hoses, fluids, filters, batteries, sensors, and hydraulic cylinders; diagnosing and inspecting all electrical systems and components; thoroughly inspecting drive motors and axles; and inspecting the swing gear and basket.
Pickup and delivery will be coordinated by the contractor, and installation will take place at the contractor’s facility, with completion required within 120 days after contract award. Funding is not currently available, and no award will be made until funds are appropriated; the Availability of Funds clause (FAR 52.232-18) applies.
The 190th Maintenance Squadron at the 190th ARW Forbes Field ANGB has a requirement for a JLG Refurbish to include the following: Replacement of all hoses, fluids, filters, batteries, sensors, hydraulic cylinders, diagnose and inspect all electrical system and components, thorough inspection of all drive motors and axles, thorough inspection of all swing gear and basket. Pick-Up and Delivery will be coordinated by contractor along with Installation will occur at the Contractor?s Facility. Installation shall be completed no later than 120 Days after date of contract award.**Funding is not currently available for this acquisition. No contract award will be made until appropriated funds are made available. FAR 52.232-18, Availability of Funds (APR 1984) applies to this acquisition.**
From Combined Synopsis/Solicitation posted on Sep 09, 2025Amended requirement for 2 total JLGs refurbished and updated quote due date and duration of quote validity. See attached updated combo V2. **Funding is not currently available for this acquisition. No contract award will be made until appropriated funds are made available. FAR 52.232-18, Availability of Funds (APR 1984) applies to this acquisition.**
From Combined Synopsis/Solicitation posted on Sep 10, 2025Amended to update product description name. **Funding is not currently available for this acquisition. No contract award will be made until appropriated funds are made available. FAR 52.232-18, Availability of Funds (APR 1984) applies to this acquisition.**
From Combined Synopsis/Solicitation posted on Sep 17, 2025Notice history
3-
Combined Synopsis/Solicitation Posted Sep 09, 2025
-
Combined Synopsis/Solicitation Posted Sep 10, 2025View changes (2)
- Description: Description was updated
- Response Deadline: Sep 24, 2025 → Sep 25, 2025
-
Combined Synopsis/Solicitation LATEST Posted Sep 17, 2025View changes (2)
- Title: JLG Reburbish → JLG Refurbish
- Description: Description was updated
Details
Award Information
Not yet awarded
Contacts
Phone
Phone