REPLACE HEATING BOILER - JBSA Randolph, TX F2M3CB5152A001
Summary
AI-generated · Aug 24, 2025Replace the gas-fired boiler system in Building 575 at JBSA‑Randolph, TX with a new energy-efficient, code-compliant heating system to meet long-term needs. The contractor would provide all supervision, labor, materials, tools, equipment, transportation, incidentals, and quality assurance to remove the existing boiler and associated components and to dispose of the old system and install the new one, per the Draft SOW.
This is market research to identify contractors capable of delivering all items and the associated cost. Respondents are asked to complete and return the attached Request for Information via email to the listed point of contact. Attachments include the Request for Information, Draft SOW, Salient Characteristics, photos, and drawings; the second notice adds more project specifics (Building 575, energy efficiency, code compliance) and direct submission instructions for the RFI.
The Government is only conducting market research and attaining information to identify contractors that are able to provide all items and the cost associated to acquire these specific items/services IAW Draft SOW.
From Sources Sought posted on Aug 01, 2025The Government conducting MARKET RESEARCH ONLY and attaining information to identify contractors that are able to provide all items and the cost associated to acquire these specific items/services IAW the Draft SOW. Please fill out and submit the attached Request for Information and return via email to the listed POC's. Refer to the attached documents for reference. PROJECT OVERVIEW. The purpose of this project is to replace the existing gas-fired boiler system in Building 575 at JBSA-Randolph, TX, with a new, energy-efficient, and code-compliant system to meet the facility's long-term heating requirements. The Statement of Work (SOW) outlines the requirements for the contractor to furnish all supervision, labor, materials, tools, equipment, transportation, incidentals, and quality assurance necessary for the removal, disposal, and replacement of the existing system and its associated components. ATTACHMENTS: 1. Request for Information 2. DRAFT SOW 3. SALIENT CHARACTERISTICS 4. PHOTOS 5. Drawings
From Sources Sought posted on Aug 04, 2025Notice history
2-
-
Sources Sought LATEST Posted Aug 04, 2025View changes (2)
- Title: JBSA Randolph Replace Boiler → REPLACE HEATING BOILER - JBSA Randolph, TX
- Description: Description was updated
Details
Award Information
Not yet awarded
Documents
9Contacts
Phone
Phone
Agency
Place of Performance
USA