Contacts, documents and full notice history are available with a subscription.
Combined Synopsis/Solicitation SBA Expired 3 notices 5 documents

JBSA LAK HVAC Replacement System B4983 FA301626Q0121

Solicitation FA301626Q0121 Copied Notice ID dd940632d14f44b7a95c72b2f27e6e33 Copied DEPT OF DEFENSE — FA3016 502 CONS CL
SAM.gov
Posted
May 21, 2026
Deadline
Jun 08, 2026
Set-aside
SBA
NAICS
238220
PSC
4120

Summary

AI-generated · May 22, 2026

Replace the Legacy R22 Split HVAC System for B4983 at JBSA Lackland, removing the existing Rheem condenser and RUUD air handler, along with the Honeywell controller and wiring, and install a complete, new HVAC system that is fully operational and commissioned. The contractor must supply all labor, supervision, materials, equipment, tools, transportation, and quality assurance to remove the old system and deliver a replacement that meets current UFC, ASHRAE, NFPA, ICC, OSHA, and Air Force standards.

A mandatory site visit will be held to assess the installation site. Attendees must meet base access requirements (REAL ID or passport as applicable) and check in at the Visitors Center; advance notice of attendance is required. Questions about the solicitation may be submitted in writing by the stated deadline, and responses will be posted on SAM.gov. Attachments include the SOW for Legacy R22 Split System Replacement, salient characteristics for a 15-ton commercial DX split system, a Wage Determination, and a Legacy R22 PowerPoint.

PLEASE READ CAREFULLY AND FOLLOW ALL INSTRUCTIONS IN THE RFQ ACCORDINGLY! This requirement is being solicited as a 100% Total Small Business set aside. The NAICS code is 238220 Plumbing, Heating, and Air-Conditioning Contractors, PSC 4120 Air Conditioning Equipment and the SBA size standard is $19M. This requirement is for the purchase and installation of a total replacement of Legacy R22 Split HVAC System for B4983 at JBSA LAK 78236 in accordance with (IAW) the associated Statement of Work (SOW). Refer to salient characteristics and technical criteria listed in the attached RFQ. PROJECT OVERVIEW. The contractor shall provide all labor, supervision, materials, equipment, tools, transportation, and quality assurance necessary to remove the existing HVAC system and install a new system meeting current Unified Facilities Criteria (UFC), American Society of Heating, Refrigerating and Air-Conditioning Engineers (ASHRAE), National Fire Protection Association (NFPA), International Code Council (ICC), OSHA, and Air Force standards. The contractor shall deliver a complete, operational, commissioned HVAC system. Existing equipment: Rheem Condenser, RUUD Air Handler unit. No front-end control system is installed. R22 refrigerant system requiring full replacement. Existing Honeywell controller and wiring to be removed Questions Due Date: All questions must be submitted in writing by email no later than Wednesday, 03 June 2026 at 10:00 AM CDT. Responses to questions will be posted by the Government on the SAM.gov, as received. Questions submitted after this date/time will not be considered. Site Visit: A site visit is scheduled for Tuesday, 02 June 2026 at 10:00 AM at JBSA Lackland Luke East Gate Visitor Control Center, located at B1196, 2602 Luke Blvd 78236. Departure to the site will be promptly at 10:00 AM CDT. Please arrive 30 minutes prior to sign in, wait in line, and retrieve your pass at the visitor center. The Government WILL NOT provide transportation to travel between the sites. Interested parties are required to have a copy of a valid REAL ID Driver s License, vehicle registration and insurance on hand to receive a base pass. If the drivers license has not been updated to the REAL ID, interested parties will need a passport along with a drivers license. If this type of documentation is not provided a base pass will not be issued and attendance will not be granted. *Requests to attend the Site Visit shall be received NO LATER THAN Tuesday, 26 May 2026 at 10:00 AM CDT and sent to both email addresses detailed below. Contract Specialist (CS) SSgt Ulysses Solis, ulysses.solis@us.af.mil Contracting Officer (CO) Emily Rodriguez, emily.rodriguez.8@us.af.mil Contractors who already have base access are required to notify CO & CS via email of planned attendance and check in at the Visitors Center. ATTACHMENTS: Atch 1. SOW_ Legacy R22 Split System Replacement B4983 Atch 2. Salient Characteristics_15-Ton Commercial DX Split System Atch 3. Wage Determination No. 2015-5253, Revision 29 Atch 4. Legacy R22 Split HVAC System PowerPoint

From Combined Synopsis/Solicitation posted on May 21, 2026

26 May 2026 UPDATE: The following have been updated Posted revised RFQ FA301626Q0121 Posted revised Atch 1. SOW_ Legacy R22 Split System Replacement B4983_7May26 Removed Atch 3. Wage Determinations Please continue to monitor SAM.gov for all related updates. All other terms and conditions remain unchanges. ****************************************************************** PLEASE READ CAREFULLY AND FOLLOW ALL INSTRUCTIONS IN THE RFQ ACCORDINGLY! This requirement is being solicited as a 100% Total Small Business set aside. The NAICS code is 238220 Plumbing, Heating, and Air-Conditioning Contractors, PSC 4120 Air Conditioning Equipment and the SBA size standard is $19M. This requirement is for the purchase and installation of a total replacement of Legacy R22 Split HVAC System for B4983 at JBSA LAK 78236 in accordance with (IAW) the associated Statement of Work (SOW). Refer to salient characteristics and technical criteria listed in the attached RFQ. PROJECT OVERVIEW. The contractor shall provide all labor, supervision, materials, equipment, tools, transportation, and quality assurance necessary to remove the existing HVAC system and install a new system meeting current UFC, ASHRAE, NFPA, ICC, OSHA, and Air Force standards. The contractor shall deliver a complete, operational, commissioned HVAC system. Existing equipment: Rheem Condenser, RUUD Air Handler unit. No front-end control system is installed. R22 refrigerant system requiring full replacement. Existing Honeywell controller and wiring to be removed Questions Due Date: All questions must be submitted in writing by email no later than Wednesday, 03 June 2026 at 10:00 AM CDT. Responses to questions will be posted by the Government on the SAM.gov, as received. Questions submitted after this date/time will not be considered. Site Visit: A site visit is scheduled for Tuesday, 02 June 2026 at 10:00 AM at JBSA Lackland Luke East Gate Visitor Control Center, located at B1196, 2602 Luke Blvd 78236. Departure to the site will be promptly at 10:00 AM CDT. Please arrive 45 minutes prior to sign in, wait in line, and retrieve your pass at the visitor center. The Government WILL NOT provide transportation to travel between the sites. Interested parties are required to have a copy of a valid REAL ID Driver s License, vehicle registration and insurance on hand to receive a base pass. If the drivers license has not been updated to the REAL ID, interested parties will need a passport along with a drivers license. If this type of documentation is not provided a base pass will not be issued and attendance will not be granted. *Requests to attend the Site Visit shall be received NO LATER THAN Tuesday, 26 May 2026 at 10:00 AM CDT and sent to both email addresses detailed below. Contract Specialist (CS) SSgt Ulysses Solis, ulysses.solis@us.af.mil Contracting Officer (CO) Emily Rodriguez, emily.rodriguez.8@us.af.mil Contractors who already have base access are required to notify CO & CS via email of planned attendance and check in at the Visitors Center. ATTACHMENTS: Atch 1. SOW_ Legacy R22 Split System Replacement B4983_7May26 Atch 2. Salient Characteristics_15-Ton Commercial DX Split System Atch 3. Legacy R22 Split HVAC System PowerPoint

From Combined Synopsis/Solicitation posted on May 26, 2026

NOTICE OF AMENDMENT (PLEASE REVIEW ALL UPDATED ATTACHMENTS): Amendment 0001 The purpose of this amendment is to: 1. Upload Questions and Anwers 2. Provided REVISED Statement of Work dated 4 June 2026 3. Provide Updated Legacy System Photos dated 4 June 2026 4. Provided Amended RFQ - FA301626Q01210001 document that includes the updated attachments and also accounts for two separate contract line items. 5. Change Response Due Date to Tuesday, 9 June 2026 at 10:00AM CDT. ****************************************************************** 26 May 2026 UPDATE: The following have been updated Posted revised RFQ FA301626Q0121 Posted revised Atch 1. SOW_ Legacy R22 Split System Replacement B4983_7May26 Removed Atch 3. Wage Determinations Please continue to monitor SAM.gov for all related updates. All other terms and conditions remain unchanges. ****************************************************************** PLEASE READ CAREFULLY AND FOLLOW ALL INSTRUCTIONS IN THE RFQ ACCORDINGLY! This requirement is being solicited as a 100% Total Small Business set aside. The NAICS code is 238220 Plumbing, Heating, and Air-Conditioning Contractors, PSC 4120 Air Conditioning Equipment and the SBA size standard is $19M. This requirement is for the purchase and installation of a total replacement of Legacy R22 Split HVAC System for B4983 at JBSA LAK 78236 in accordance with (IAW) the associated Statement of Work (SOW). Refer to salient characteristics and technical criteria listed in the attached RFQ. PROJECT OVERVIEW. The contractor shall provide all labor, supervision, materials, equipment, tools, transportation, and quality assurance necessary to remove the existing HVAC system and install a new system meeting current UFC, ASHRAE, NFPA, ICC, OSHA, and Air Force standards. The contractor shall deliver a complete, operational, commissioned HVAC system. Existing equipment: Rheem Condenser, RUUD Air Handler unit. No front-end control system is installed. R22 refrigerant system requiring full replacement. Existing Honeywell controller and wiring to be removed Questions Due Date: All questions must be submitted in writing by email no later than Wednesday, 03 June 2026 at 10:00 AM CDT. Responses to questions will be posted by the Government on the SAM.gov, as received. Questions submitted after this date/time will not be considered. Site Visit: A site visit is scheduled for Tuesday, 02 June 2026 at 10:00 AM at JBSA Lackland Luke East Gate Visitor Control Center, located at B1196, 2602 Luke Blvd 78236. Departure to the site will be promptly at 10:00 AM CDT. Please arrive 45 minutes prior to sign in, wait in line, and retrieve your pass at the visitor center. The Government WILL NOT provide transportation to travel between the sites. Interested parties are required to have a copy of a valid REAL ID Driver s License, vehicle registration and insurance on hand to receive a base pass. If the drivers license has not been updated to the REAL ID, interested parties will need a passport along with a drivers license. If this type of documentation is not provided a base pass will not be issued and attendance will not be granted. *Requests to attend the Site Visit shall be received NO LATER THAN Tuesday, 26 May 2026 at 10:00 AM CDT and sent to both email addresses detailed below. Contract Specialist (CS) SSgt Ulysses Solis, ulysses.solis@us.af.mil Contracting Officer (CO) Emily Rodriguez, emily.rodriguez.8@us.af.mil Contractors who already have base access are required to notify CO & CS via email of planned attendance and check in at the Visitors Center. ATTACHMENTS: Atch 1. SOW_ Legacy R22 Split System Replacement B4983_7May26 Atch 2. Salient Characteristics_15-Ton Commercial DX Split System Atch 3. Legacy R22 Split HVAC System PowerPoint

From Combined Synopsis/Solicitation posted on Jun 04, 2026

Notice history

3
  1. Combined Synopsis/Solicitation Posted May 21, 2026
  2. Combined Synopsis/Solicitation Posted May 26, 2026
    • Description: Description was updated
  3. Combined Synopsis/Solicitation LATEST Posted Jun 04, 2026
    • Description: Description was updated
    • Response Deadline: Jun 08, 2026Jun 09, 2026

Details

Solicitation number FA301626Q0121
Notice ID dd940632d14f44b7a95c72b2f27e6e33
Notice type Combined Synopsis/Solicitation
Product / Service (PSC) 4120
NAICS 238220
Place of performance DWG, Texas
Archive date Jun 23, 2026

Award Information

Not yet awarded

Contacts

primary
Ulysses Solis

Email

secondary
Emily A. Rodriguez

Email

Agency

DEPT OF DEFENSE
DEPT OF THE AIR FORCE
AIR EDUCATION AND TRAINING COMMAND
JOINT BASE SAN ANTONIO
FA3016 502 CONS CL

Place of Performance

DWG, Texas
USA

Dates

Posted May 21, 2026 2 months ago
Last Updated Aug 06, 2026 1 day ago
Due Jun 08, 2026 1 month ago