JBR032 Alaska National Guard Readiness Center W911KB25R0002
Summary
AI-generated · Aug 23, 2025Design-build for a new Alaska Army National Guard Readiness Center Additions (approx. 50,641 SF) at Camp Carroll on the Fort Richardson side of JBER to support training, administrative, logistical, and operational needs of three AKARNG units. Includes all utility services, site improvements, drainage, parking, and a paved area for organizational equipment parking/staging. Interior scope covers a general-purpose training/maintenance bay, assembly area, hazardous waste and POL storage, a fully equipped commercial kitchen, heated unit storage, arms vaults, training/classrooms, secure room, and admin/office spaces, along with comprehensive interior design services and a backup generator to sustain operation during extended power outages. A Project Labor Agreement is now required and will be submitted during Phase 2 (per Amendment 0005).
Phase-progress update: four contractors have been selected to move to Phase 2 (ASRC Builders, LLC; Davis Constructors & Engineers, Inc.; Osborne Construction Company; Unit Company). The description and PLA requirement apply to the project, and Amendment 0005 states the PLA will be submitted in Phase 2. Awards noted show two entries with $0.00 amounts.
This is a design-build project for a new Alaska Army National Guard Readiness Center Additions (approx. 50,641 SF) at Camp Carroll in the Ft. Richardson side of JBER, Alaska. The readiness center will be designed and constructed to support training, administrative, logistical, and operational requirements of three AKARNG units. Design and construction will include all utility services, systems, site improvements, drainage, parking areas to support the facility. Integral part of the facility will be a designated paved area for organizational (military equipment) parking/staging area. The readiness center will have a general-purpose training/maintenance bay, assembly area, controlled hazardous waste and POL storage area, a fully equipped commercial kitchen, heated storage spaces for each occupying unit, arms vault for each occupying unit, training/classrooms, secure room, and admin/office spaces. Comprehensive interior design services will be required. The readiness center will have a backup generator that will fully support continuous operation of the readiness center during a prolonged utility power interruption. ----Due to policy changes, a Project Labor Agreement has been deemed a requirement on this project. Amendment 0005 includes this requirement which will be submitted during Phase 2.
From Solicitation posted on Jun 04, 2025*********************************************************************** THIS IS TO IDENTIFY THE CONTRACTORS SELECTED TO MOVE TO PHASE 2 FOR THIS ACQUISITION. THE FOUR CONTRACTORS ARE AS FOLLOWS: ASRC BUILDERS, LLC DAVIS CONSTRUCTORS & ENGINEERS, INC. OSBORNE CONSTRUCTION COMPANY UNIT COMPANY *********************************************************************** This is a design-build project for a new Alaska Army National Guard Readiness Center Additions (approx. 50,641 SF) at Camp Carroll in the Ft. Richardson side of JBER, Alaska. The readiness center will be designed and constructed to support training, administrative, logistical, and operational requirements of three AKARNG units. Design and construction will include all utility services, systems, site improvements, drainage, parking areas to support the facility. Integral part of the facility will be a designated paved area for organizational (military equipment) parking/staging area. The readiness center will have a general-purpose training/maintenance bay, assembly area, controlled hazardous waste and POL storage area, a fully equipped commercial kitchen, heated storage spaces for each occupying unit, arms vault for each occupying unit, training/classrooms, secure room, and admin/office spaces. Comprehensive interior design services will be required. The readiness center will have a backup generator that will fully support continuous operation of the readiness center during a prolonged utility power interruption. ----Due to policy changes, a Project Labor Agreement has been deemed a requirement on this project. Amendment 0005 includes this requirement which will be submitted during Phase 2.
From Solicitation posted on Jul 31, 2025Notice history
2Details
Award Information
Awardees
| Company Name | UEI | CAGE Code | Location |
|---|---|---|---|
| N/A | N/A | N/A |
Contacts
Phone
Phone
Agency
Place of Performance
99506