Contacts, documents and full notice history are available with a subscription.
Combined Synopsis/Solicitation SBA Expired 5 notices 7 documents

JBER Education Center Flooring Replacement FA500025Q0041

Solicitation FA500025Q0041 Copied Notice ID 2d9aeadc9ff9456394f10bd367d8ce9a Copied DEPT OF DEFENSE — FA5000 673 CONS LGC
SAM.gov
Posted
Jul 25, 2025
Deadline
Aug 13, 2025
Set-aside
SBA
NAICS
238330
PSC
Z2AA

Summary

AI-generated · Aug 27, 2025

Replace flooring in Building 7 at the JBER Education Center. Demolish and remove the existing flooring, associated appurtenances, and cove base, and dispose of debris off-post. Move furniture out of the areas to receive new flooring; provide a two-week notice to relocate offices as needed. Perform any floor repairs to industry standards and prepare the surface per the manufacturer’s installation instructions for the Finish Schedule; install the new flooring as shown on the drawings and Finish Schedule. Remove and re-install door leaves as necessary to install the new floor. Submit color selections to DPW/773 CES for approval. Proposals will be evaluated on total price and technical acceptability against the SOW; quotes must be submitted by the specified method and deadline; questions must be submitted by the stated deadline; all vendors must be SAM-registered and monitor for amendments.

Amendment 01 adds a Questions and Answers document to the solicitation; the solicitation due date remains unchanged. Amendment 02 updates the attached Statement of Work to the correct version; all other terms remain unchanged.

Existing flooring in Building 7 has reached end of life expectancy and is in need of repair. Demo existing flooring, all associated flooring appurtenances and cove base as shown on drawings and dispose of off Post . Unit to remove all furniture from areas to receive new flooring. Contractor shall provide two week notice to customer for relocation of office to accomplish work. Perform any floor repairs required to meet industry standard and perform all floor prep per manufacturer s installation instructions for areas to receive new flooring as shown on drawings and Finish Schedule. Provide and install new flooring as shown on drawings and Finish Schedule. Remove and re-install door leafs as necessary to install new flooring. Color selections shall be submitted to DPW/773 CES for approval Note:When submitting your quote, the Government will award a contract to the responsible offeror whose quote conforms to the solicitation and is the most advantageous to the Government, price and other factors considered. Factors being utilized to evaluate offers are: 1. Price: Complete Price Schedule on the Attachment titled: Combined Synopsis-Solicitation 2. Technical Acceptability: Submit offer/quote IAW the Statement of Work (SOW).Quotes shall be submitted via email to the following addresses tyler.merson@us.af.mil ; alexander.tate@us.af.mil no later than 13 August 2025 at 2:00 CST in order to be considered timely. Questions are due no later than 1 August 2025 at 2:00 PM AKDT. The Government is not obligated to answer any questions submitted after the deadline. It is the vendors responsibility to monitor the solicitation posted herein for amendments issued in reference to this requirement. Any potential amendments will be posted in the same fashion as the solicitation. All Contractors who provide goods/services to the DoD must be registered in the System for Award Management (SAM). Failure to comply with SAM registration will deem the Offeror ineligible for award.

From Combined Synopsis/Solicitation posted on Jul 25, 2025

Existing flooring in Building 7 has reached end of life expectancy and is in need of repair. Demo existing flooring, all associated flooring appurtenances and cove base as shown on drawings and dispose of off Post . Unit to remove all furniture from areas to receive new flooring. Contractor shall provide two week notice to customer for relocation of office to accomplish work. Perform any floor repairs required to meet industry standard and perform all floor prep per manufacturer s installation instructions for areas to receive new flooring as shown on drawings and Finish Schedule. Provide and install new flooring as shown on drawings and Finish Schedule. Remove and re-install door leafs as necessary to install new flooring. Color selections shall be submitted to DPW/773 CES for approval Note:When submitting your quote, the Government will award a contract to the responsible offeror whose quote conforms to the solicitation and is the most advantageous to the Government, price and other factors considered. Factors being utilized to evaluate offers are: 1. Price: Complete Price Schedule on the Attachment titled: Combined Synopsis-Solicitation 2. Technical Acceptability: Submit offer/quote IAW the Statement of Work (SOW).Quotes shall be submitted via email to the following addresses tyler.merson@us.af.mil ; alexander.tate@us.af.mil no later than 13 August 2025 at 2:00 CST in order to be considered timely. Questions are due no later than 1 August 2025 at 2:00 PM AKDT. The Government is not obligated to answer any questions submitted after the deadline. It is the vendors responsibility to monitor the solicitation posted herein for amendments issued in reference to this requirement. Any potential amendments will be posted in the same fashion as the solicitation. All Contractors who provide goods/services to the DoD must be registered in the System for Award Management (SAM). Failure to comply with SAM registration will deem the Offeror ineligible for award. *** AMENDMENT 01*** The purpose of this amendment is to incorporate the Questions and Answers document dated 7 August 2025. Solicitation due date remains unchanged.

From Combined Synopsis/Solicitation posted on Aug 08, 2025

Existing flooring in Building 7 has reached end of life expectancy and is in need of repair. Demo existing flooring, all associated flooring appurtenances and cove base as shown on drawings and dispose of off Post . Unit to remove all furniture from areas to receive new flooring. Contractor shall provide two week notice to customer for relocation of office to accomplish work. Perform any floor repairs required to meet industry standard and perform all floor prep per manufacturer s installation instructions for areas to receive new flooring as shown on drawings and Finish Schedule. Provide and install new flooring as shown on drawings and Finish Schedule. Remove and re-install door leafs as necessary to install new flooring. Color selections shall be submitted to DPW/773 CES for approval Note:When submitting your quote, the Government will award a contract to the responsible offeror whose quote conforms to the solicitation and is the most advantageous to the Government, price and other factors considered. Factors being utilized to evaluate offers are: 1. Price: Complete Price Schedule on the Attachment titled: Combined Synopsis-Solicitation 2. Technical Acceptability: Submit offer/quote IAW the Statement of Work (SOW).Quotes shall be submitted via email to the following addresses tyler.merson@us.af.mil ; alexander.tate@us.af.mil no later than 13 August 2025 at 2:00 CST in order to be considered timely. Questions are due no later than 1 August 2025 at 2:00 PM AKDT. The Government is not obligated to answer any questions submitted after the deadline. It is the vendors responsibility to monitor the solicitation posted herein for amendments issued in reference to this requirement. Any potential amendments will be posted in the same fashion as the solicitation. All Contractors who provide goods/services to the DoD must be registered in the System for Award Management (SAM). Failure to comply with SAM registration will deem the Offeror ineligible for award. *** AMENDMENT 02*** The purpose of Amendment 0002 is to: a. Update Attached Statement of Work to incorporate the correct version dated 1 May 2025 2. All other terms and conditions from the RFQ (unless otherwise stated in this amendment), remain unchanged and in full effect.

From Combined Synopsis/Solicitation posted on Aug 22, 2025

Existing flooring in Building 7 has reached end of life expectancy and is in need of repair. Demo existing flooring, all associated flooring appurtenances and cove base as shown on drawings and dispose of off Post . Unit to remove all furniture from areas to receive new flooring. Contractor shall provide two week notice to customer for relocation of office to accomplish work. Perform any floor repairs required to meet industry standard and perform all floor prep per manufacturer s installation instructions for areas to receive new flooring as shown on drawings and Finish Schedule. Provide and install new flooring as shown on drawings and Finish Schedule. Remove and re-install door leafs as necessary to install new flooring. Color selections shall be submitted to DPW/773 CES for approval Note:When submitting your quote, the Government will award a contract to the responsible offeror whose quote conforms to the solicitation and is the most advantageous to the Government, price and other factors considered. Factors being utilized to evaluate offers are: 1. Price: Complete Price Schedule on the Attachment titled: Combined Synopsis-Solicitation 2. Technical Acceptability: Submit offer/quote IAW the Statement of Work (SOW).Quotes shall be submitted via email to the following addresses Brian.Gitau@us.af.mil ; alexander.tate@us.af.mil no later than 5 Sep 2025 at 2:00 AKDT in order to be considered timely. Questions are due no later than 3 September 2025 at 2:00 PM AKDT. The Government is not obligated to answer any questions submitted after the deadline. It is the vendors responsibility to monitor the solicitation posted herein for amendments issued in reference to this requirement. Any potential amendments will be posted in the same fashion as the solicitation. All Contractors who provide goods/services to the DoD must be registered in the System for Award Management (SAM). Failure to comply with SAM registration will deem the Offeror ineligible for award. *** AMENDMENT 02*** The purpose of Amendment 0002 is to: a. Update Attached Statement of Work to incorporate the correct version dated 1 May 2025 2. All other terms and conditions from the RFQ (unless otherwise stated in this amendment), remain unchanged and in full effect. *** AMENDMENT 03 *** The purpose of this amendment is to: 1. Include revised Statement of work dated 27 August 2025. As a result of the revised statement of work, Contractors will be required to move the furniture out to the building prior to starting work and move furniture back into the building after work is complete. 2. As a result of this amendment the offers due date has been changed from 29 August 2025 to 5 September 2025 2:00 Alaskan Daylight Time and the questions due date has been updated to 3 September 2025 . 4. Updated Point of contact information, Please ensure to send all questions and offers for this requirement to Brian Gitau at (brian.gitau@us.af.mil) and Alexander Tate at (alexander.tate@us.af.mil) 3. All other terms and conditions remain the same.

From Combined Synopsis/Solicitation posted on Aug 27, 2025

Existing flooring in Building 7 has reached end of life expectancy and is in need of repair. Demo existing flooring, all associated flooring appurtenances and cove base as shown on drawings and dispose of off Post . Unit to remove all furniture from areas to receive new flooring. Contractor shall provide two week notice to customer for relocation of office to accomplish work. Perform any floor repairs required to meet industry standard and perform all floor prep per manufacturer s installation instructions for areas to receive new flooring as shown on drawings and Finish Schedule. Provide and install new flooring as shown on drawings and Finish Schedule. Remove and re-install door leafs as necessary to install new flooring. Color selections shall be submitted to DPW/773 CES for approval Note:When submitting your quote, the Government will award a contract to the responsible offeror whose quote conforms to the solicitation and is the most advantageous to the Government, price and other factors considered. Factors being utilized to evaluate offers are: 1. Price: Complete Price Schedule on the Attachment titled: Combined Synopsis-Solicitation 2. Technical Acceptability: Submit offer/quote IAW the Statement of Work (SOW).Quotes shall be submitted via email to the following addresses Brian.Gitau@us.af.mil ; alexander.tate@us.af.mil no later than 5 Sep 2025 at 2:00 AKDT in order to be considered timely. Questions are due no later than 3 September 2025 at 2:00 PM AKDT. The Government is not obligated to answer any questions submitted after the deadline. It is the vendors responsibility to monitor the solicitation posted herein for amendments issued in reference to this requirement. Any potential amendments will be posted in the same fashion as the solicitation. All Contractors who provide goods/services to the DoD must be registered in the System for Award Management (SAM). Failure to comply with SAM registration will deem the Offeror ineligible for award. *** AMENDMENT 02*** The purpose of Amendment 0002 is to: a. Update Attached Statement of Work to incorporate the correct version dated 1 May 2025 2. All other terms and conditions from the RFQ (unless otherwise stated in this amendment), remain unchanged and in full effect. *** AMENDMENT 03 *** The purpose of this amendment is to: 1. Include revised Statement of work dated 27 August 2025. As a result of the revised statement of work, Contractors will be required to move the furniture out to the building prior to starting work and move furniture back into the building after work is complete. 2. As a result of this amendment the offers due date has been changed from 29 August 2025 to 5 September 2025 2:00 Alaskan Daylight Time and the questions due date has been updated to 3 September 2025 . 4. Updated Point of contact information, Please ensure to send all questions and offers for this requirement to Brian Gitau at (brian.gitau@us.af.mil) and Alexander Tate at (alexander.tate@us.af.mil) 3. All other terms and conditions remain the same. *** AMENDMENT 04 *** The purpose of amendment 04 is to: a. Extend the solicitation to Close of Business on September 23, 2025 so that all contractors have a fair chance to bid. 2. All other terms and conditions stay the same.

From Combined Synopsis/Solicitation posted on Sep 19, 2025

Notice history

5
  1. Combined Synopsis/Solicitation Posted Jul 25, 2025
  2. Combined Synopsis/Solicitation Posted Aug 08, 2025
    • Title: JBER Education Center Flooring ReplacementJBER Education Center Flooring Replacement - AMENDMENT 01
    • Description: Description was updated
  3. Combined Synopsis/Solicitation Posted Aug 22, 2025
    • Title: JBER Education Center Flooring Replacement - AMENDMENT 01JBER Education Center Flooring Replacement - AMENDMENT 02
    • Description: Description was updated
    • Response Deadline: Aug 13, 2025Aug 29, 2025
  4. Combined Synopsis/Solicitation Posted Aug 27, 2025
    • Title: JBER Education Center Flooring Replacement - AMENDMENT 02JBER Education Center Flooring Replacement - AMENDMENT 03
    • Description: Description was updated
    • Response Deadline: Aug 29, 2025Sep 05, 2025
  5. Combined Synopsis/Solicitation LATEST Posted Sep 19, 2025
    • Title: JBER Education Center Flooring Replacement - AMENDMENT 03JBER Education Center Flooring Replacement - AMENDMENT 04
    • Description: Description was updated
    • Response Deadline: Sep 05, 2025Sep 23, 2025

Details

Solicitation number FA500025Q0041
Notice ID 2d9aeadc9ff9456394f10bd367d8ce9a
Notice type Combined Synopsis/Solicitation
Product / Service (PSC) Z2AA
NAICS 238330
Place of performance Chenega Bay, Alaska
Archive date Aug 28, 2025

Award Information

Not yet awarded

Contacts

primary
alexander tate

Email

Phone

secondary
Tyler Merson

Email

Phone

Agency

DEPT OF DEFENSE
DEPT OF THE AIR FORCE
PACIFIC AIR FORCES
FA5000 673 CONS LGC

Place of Performance

Chenega Bay, Alaska 99506
USA

Dates

Posted Jul 25, 2025 1 year ago
Last Updated Aug 06, 2026 2 days ago
Due Aug 13, 2025 11 months ago