Contacts, documents and full notice history are available with a subscription.
Combined Synopsis/Solicitation SBA Expired 2 notices 4 documents

JB Charleston Navy NPTU Bunk Beds FA441825Q0069

Solicitation FA441825Q0069 Copied Notice ID 098ae0e62efa49799ae1d5e261fa0da2 Copied DEPT OF DEFENSE — FA4418 628 CONS PK
SAM.gov
Posted
Aug 27, 2025
Deadline
Sep 05, 2025
Set-aside
SBA
NAICS
337127
PSC
7105

Summary

AI-generated · Aug 28, 2025

Require twenty-four metal three-tier bunk beds with overall dimensions 76" L × 84.5" H × 28.3125" D, to conform with NAVSEA T9640-AC-DCP-010/HAB. Each bed must include rails, ladders, full privacy partitions, lee rails (instead of lee straps), and 74-inch mattresses, with a minimum deck clearance of 6 inches and a minimum 20 inches of clearance above the top bunk, in accordance with the attached Description of Requirement.

These bunks are intended for sailors on the YFNX 20 barge during the MTS 626 decommissioning. See the attached Combined Synopsis/Solicitation and attachments for additional information and instructions on preparing a bid.

The Nuclear Power Training Command (NPTU) requires twenty-four (24) metal three-tier bunk beds with dimensions of 76"L x 84.5"H x 28.3125"D, conforming to NAVSEA Technical Publication T9640-AC-DCP-010/HAB. These bunk beds must include rails, ladders, full privacy partitions, lee rails (in lieu of lee straps), and 74-inch mattresses, with a minimum deck clearance of 6 inches and a minimum 20-inch clearance above the top bunk IAW with the attached "Description of Requirement", for use by sailors on the YFNX 20 barge during the MTS 626 decommissioning. Please see attached Combined Synopsis Solicitation and attachments for additional information and quote preparation instructions.

From Combined Synopsis/Solicitation posted on Aug 27, 2025

The purpose of this Amendment 1 is to: 1. Extend RFQ due date to Tuesday, 09 September 2025 at 2:00 pm EDT. All attachments now reference the revised RFQ due date. 2. Replace "Attachment 1_Description of Requirement" with "AMENDED_Attachment 1_Description of Requirement_20250903." 3. Replace Attachment "COMBINED SYNOPSIS_SOLICITATION FA441825Q0069 JB Charleston Navy NPTU Bunk Beds" with "AMENDED_COMBINED SYNOPSIS_SOLICITATION FA441825Q0069 JB Charleston Navy NPTU Bunk Beds_20250903." The Nuclear Power Training Command (NPTU) requires eight (8) metal three-tier bunk bed assemblies (totaling twenty-four (24) individual berths) complete with safety rails, ladders, privacy partions, lee rails, and mattresses conforming to NAVSEA Technical Publication T9640-AC-DCP-010/HAB. See the attached "Description of Requirement" for salient characteristics. This is for use by sailors on the YFNX 20 barge during the MTS 626 decommissioning. Please see attached Combined Synopsis Solicitation and attachments for additional information and quote preparation instructions.

From Combined Synopsis/Solicitation posted on Sep 03, 2025

Notice history

2
  1. Combined Synopsis/Solicitation Posted Aug 27, 2025
  2. Combined Synopsis/Solicitation LATEST Posted Sep 03, 2025
    • Title: JB Charleston Navy NPTU Bunk BedsAmendment 1 - JB Charleston Navy NPTU Bunk Beds
    • Description: Description was updated
    • Response Deadline: Sep 05, 2025Sep 09, 2025

Details

Solicitation number FA441825Q0069
Notice ID 098ae0e62efa49799ae1d5e261fa0da2
Notice type Combined Synopsis/Solicitation
Product / Service (PSC) 7105
NAICS 337127
Place of performance Goose Creek, South Carolina
Archive date Sep 20, 2025

Award Information

Not yet awarded

Contacts

primary
Joshua Pickering

Email

secondary
Nicole Alvarez

Email

Agency

DEPT OF DEFENSE
DEPT OF THE AIR FORCE
AIR MOBILITY COMMAND
FA4418 628 CONS PK

Place of Performance

Goose Creek, South Carolina 29445
USA

Dates

Posted Aug 27, 2025 11 months ago
Last Updated Aug 06, 2026 2 days ago
Due Sep 05, 2025 11 months ago