J061--Generator PM/Repair and load bank testing Shreveport LA VAMC 36C25625Q1429
Summary
AI-generated · Aug 28, 2025Provide generator preventive maintenance, repair, and load-bank testing for on-site generators at the Overton Brooks VA Hospital in Shreveport, LA. The work will be performed under a firm-fixed-price contract with a base period plus four option years and is a brand-name only, lowest priced technically acceptable procurement expected to yield a single award.
This is a combined synopsis/solicitation for commercial items; quotes are requested and there will be no separate written solicitation issued.
36C25625Q1429 Page 2 of 53 B.1 COMBINED SYNOPSIS/SOLICITATION 1. This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Federal Acquisition Regulation (FAR) subpart 12.6, in conjunction with FAR Part 13, Simplified Acquisition Procedures for Certain Commercial Items as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested, and a written solicitation will not be issued. 2. The combined synopsis/solicitation number is 36C25625Q1429. It is issued as a Request for Quote. The Government anticipates awarding one firm-fixed price contract resulting from this solicitation. This is a Brand-name only, Lowest Priced Technically Acceptable solicitation (LPTA). 3. Solicitation documents and incorporated provisions and clauses are those in effect through Federal Acquisition Circular FAC 2025-05 (eff. 08/07/2025) 4. This requirement is recommended to compete as a Service- Disabled Veteran Owned Small- Business total set-aside in accordance with FAR Part 12 and 13 procedures. The North American Industry Classification System number is 811310 with a size standard of $14M. 5. Place of Performance: Overton Brooks VA Hospital 510 E. Stoner Avenue Shreveport, LA 71101. 6. Delivery Schedule/Installation: All services shall be performed and completed in an awarded firm-fixed price contact, a base plus four option years. 7. All questions regarding this solicitation shall be submitted via email to the Contract Specialist, Le Kisha Douglas at LeKisha.Douglas@va.gov no later than 1430 on Aug. 29, 2025, Central Standard Time. 8. Quotes are due no later than Sept 2, 2025 at 10:00A.M. Central Time and shall be submitted electronically via e-mail to the Contract Specialist, Le Kisha Douglas at LeKisha.Douglas@va.gov APPLICABLE Provisions and Clauses: The provision at 52.212-1 Introduction to Offerors Commercial, applies to this acquisition. The provision at 52.212-2 EVALUATION COMMERCIAL ITEMS (JAN 1999) applies to this acquisition. All offers shall include a completed copy of the provision at 52.212-3, Offeror Representations and Certifications Commercial Items. The clause at 52.212-4, Contract Terms and Conditions Commercial Items, applies to this acquisition and a statement. The addendum to FAR 52.212-4 also applies to this acquisition. The clause at 52.212-5, Contract Terms and Conditions Required to Implement Statutes or Executive Orders Commercial Items, applies to this acquisition and all additional FAR clauses cited in the clause are applicable to the acquisition. Addendum to FAR 52.212-4 Show FAR clauses followed by VAAR clauses in numeric order. Solicitation contains a list of all clauses incorporated by reference in numeric order under 52.252-2 (see below), starting first with FAR and followed by VAA
From Combined Synopsis/Solicitation posted on Aug 27, 2025The purpose of this amendment is to: Extend the closing date of solicitation 36C25625Q1429 from to 09/08/2025 at 10:00 am CST. Post all questions and government responses received for this requirement: Will there be a site visit? No, there will not be a site visit What cable length is needed to connect the load bank to the generator? In the past the longest distance for load bank test was 100 ft Are grounding provisions in place for the load bank? There are lugs for the ground wires Is there enough space for the load bank and ventilation clearance? There is ample space for the load bank and ventilation On page 25 of the Synopsis/Solicitation: The Contractor shall restore the equipment to full performance within one week of the originating call and/or have the capability to provide a portable emergency generator of equal capacity if the facility has one or two inoperable generators. Charges to the VA for generator rental and tie ins shall originate only upon prior approval being granted by the Contracting Officer as an additional cost to the VA. Use of overtime emergency hours as listed in this PWS may be used toward this item should the VA have not yet exhausted the aggregate for the year. Should the facility experience a failure of three or more generators at one time, the Contractor shall provide portable emergency generators (rental, tie ins and fuel) of equal, total capacity of the units, minus two, at no cost to the VA to maintain an emergency power capacity of 11MW (equivalent of five 2.2 MW units). This shall occur if the inoperability of the units is due to poor maintenance, lead time of replacement parts as part of maintenance program, system failures due to normal wear and tear. Without knowing the current state of repair, or ongoing maintenance schedule, is it the VA s intent for the contractor to take the full risk and responsibility for providing free-of-charge emergency power if the existing generators are already in a state of disrepair? It is our intent for the contractor to be held accountable if the generators are down due to contractors negligence of inadequately performing the preventative maintenance. All generators listed in the SOW are tested monthly according to Joint Commission Standards and have been properly maintained up to this point. All Will the VA allow the contractor to include a rental fee schedule as part of this proposal, broken out on a per-generator basis? The contract is for maintenance and annual testing. Any emergency rental (unassociated with #2 per the PWS, below, that we would need to cover would likely need to be a new emergency contract for equipment rental This shall occur if the inoperability of the (3 or more) units is due to poor maintenance, lead time of replacement parts as part of maintenance program, system failures due to normal wear and tear Does the phrase cited above, if the inoperability of the units is due to poor maintenance include existing units, if poorly maintained currently? All generators listed in the SOW are tested monthly, in accordance with Joint Commission Standards and have been properly maintained up to this point
From Combined Synopsis/Solicitation posted on Sep 03, 2025Notice history
2-
Combined Synopsis/Solicitation Posted Aug 27, 2025
-
Combined Synopsis/Solicitation LATEST Posted Sep 03, 2025View changes (3)
- Title: J061--Generator PM/Repair and load bank testing Shreveport LA VAMC → J061-- Generator PM/Repair and load bank testing Questions and Extension
- Description: Description was updated
- Response Deadline: Sep 02, 2025 → Sep 08, 2025
Details
Award Information
Contacts
Contracting Officer
Phone
Agency
Place of Performance
Shreveport, Louisiana 71101
USA