AI-generated · Aug 27, 2025Attend a site visit at Orlando VA Medical Center, Lake Nona, to visually inspect the issues described in the Trouble Call Reports for the Lake Nona medium voltage repair. The visit is intended to help prospective bidders understand the work environment and technical requirements for the upcoming RFQ, with on-site Q&A that may be incorporated into the RFQ. Pre-registration is required for up to two attendees per firm; attendee names must be submitted to the designated VA contacts by the specified deadline, and attendees must present valid photo ID on arrival. The meeting point is inside the lobby near the piano.
Background details include urgent concerns with emergency (generator) and normal power circuits serving the Lake Nona clinic substations, with visual indications of corrosion, swelling, and insulation damage in duct bank splices. The site visit will cover the described circuits and manhole locations to inform the forthcoming RFQ. This notice is informational and planning-oriented, not a solicitation or a promise of award.
The Department of Veteran Affairs, Network Contracting Office 08 invites interested Contractors to attend a site visit for the purpose of assessing the issues identified in the government-generated Trouble Call report. This site visit will assist prospective offers in evaluating the work environment and technical requirements in preparation for submitting a quote under the upcoming Request for Quote (RFQ). Instructions: Interested parties must pre-register attendees (no more than two) by providing names to Robert.edwards2@va.gov and rohan.mckenzie@va.gov no later than June 16, 2025, 11:00 AM. Please arrive on time and bring proper identification to gain access to the facility. Site Visit Details: Date: June 17, 2025 Time: 10:00 AM (local time) Location: Orlando VA Medical Center at Lake Nona, 13800 Veterans Way, Orlando, FL 32827 Meeting Point: Inside the lobby near the piano Purpose: Visual inspection and discussion of the issue described in Trouble Call Report Follow-up: Contractor questions will be address on-site and incorporated into the forthcoming RFQ as appropriate. Background: Emergency (generator) power circuit(s) to the Lake Nona clinic are faulted and/or unreliable. The medium voltage circuit DAG-3 is the emergency (generator) circuit powering the Clinic substation SS-CG2; and is the alternate power source for Clinic substation SS-CG1. It was Hi-Pot tested and the report indicated a catastrophic failure on B-phase, requiring both substations to be placed on the alternate circuit (DAG-15) with no redundancy. A visual inspection of manholes EA1-1 and EA1-2 in the duct bank series noted splices in them that show signs corrosion and degradation. Troubleshooting, testing was performed on the circuit and damage to the B-phase conductor insulation is suspected to be localized the within the ductwork itself requiring emergent replacement. The medium voltage circuit DAG-15 is the emergency (generator) circuit powering the Clinic substation SS-CG1 and is the alternate power source for Clinic substation SS-CG2. It was Hi-Pot tested and the report indicated signs of leakage, likely from several splices/phases in the duct bank series manholes. A visual assessment was performed in conjunction with the Hi-Pot test and noted signs of swelling on several splices. Circuit DAG15 is the sole operable emergency (generator) circuit to the Clinic substations SS-CG1/2 (in its current switched state) and in urgent need of replacement and/or repair. The Normal power circuit to the Lake Nona Domiciliary is unreliable. The medium voltage circuit DAN-2 is the sole normal power circuit powering the Domiciliary substation SS-DG1. It was quickly identified to have sustained a catastrophic splice failure on only C-phase on 12Nov24 in manhole NA2-5. Only C- phase splice was repaired, and the circuit was put back in service in >24hrs. During the visual assessment splices were noted in manholes NA2-5, NA2-6, NA2-7, and NA2-8 with various signs of corrosion and swelling indicative of impending failure. Circuit DAN-2 requires urgent replacement. DBN-7 Hospital (Normal Power) circuit - A visual assessment confirmed smoke and electrical burning signs from manhole NB2-3 near the golf cart yard of the warehouse. Suspected leaking splice damage. IMG_1005 1.3gp. Attachments: ATTACHMENT A - Trouble Call Report of the Hi-Pot Cable test DAG-3 ATTACHMENT B - Trouble Call Report of the Hi-Pot Cable test DAG-15 Note: This notice is for informational and planning purposes only. It does not constitute a solicitation or guarantee of future contract award.
From Special Notice posted on Jun 13, 2025Notice history
1-
Special Notice LATEST Posted Jun 13, 2025
Details
Award Information
Contacts
Contract Specialist
Phone