Contacts, documents and full notice history are available with a subscription.
Special Notice Expired 1 notice 1 document

J049--NOTICE OF INTENT TO SOLE SOURCE TO VENERGY GROUP LLC 5 YEAR ORDERING PERIOD IDIQ WATER INTRUSION REPAIRS WASHINGTON DC VAMC 36C24526Q0191

Solicitation 36C24526Q0191 Copied Notice ID be775bc042bf401b840cd27581040ccc Copied VETERANS AFFAIRS, DEPARTMENT OF — 245-NETWORK CONTRACT OFFICE 5 (36C245)
SAM.gov
Posted
Dec 18, 2025
Deadline
Dec 26, 2025
Set-aside
None
NAICS
561210
PSC
J049

Summary

AI-generated · Dec 19, 2025

Awarded as a sole-source IDIQ to VENERGY GROUP LLC, provide all labor, materials, equipment, and supervision to perform water intrusion repairs at the Washington DC VA Medical Center campus, addressing leaks, moisture, and flooding on an as-needed basis to maintain a safe, healthy, and operational environment. Tasks include emergency and routine response; inspection and assessment to identify source and extent of intrusion; removal and replacement of damaged materials (drywall, ceiling tiles, insulation, flooring, baseboards); temporary and permanent building envelope repairs (roofs, windows, doors, exterior walls, foundations); sealing, caulking, waterproofing; mold remediation per EPA, OSHA, and VA standards; drying and dehumidification; restoration of finishes; coordination with VA staff; and thorough documentation and reporting of findings, repairs, and recommendations. Deliverables include timely response to task orders, written assessment and repair reports with before/after photos, and long-term mitigation recommendations, plus documentation of materials used, labor hours, and completion dates. The contractor must also perform a detailed roof inspection of buildings 1, 4, 6, 14, 16, and 17, producing a comprehensive report that identifies damage and separates Major Roof Repairs/Replacement from Recurring Maintenance, with scope and cost estimates for major work (government-funded via separate delivery orders) and a recurring maintenance plan with itemized costs, including one emergency roof repair per month and bi-annual re-inspections, plus a required fall protection plan under EM 385-1-1 (competent person) submitted to the COR prior to starting work.

Contractor responsibilities include furnishing supervision, labor, materials, tools, and equipment; ensuring all repairs comply with applicable federal, state, and local codes and VA standards; maintaining a safe, clean work environment and implementing infection control; proper waste disposal; coordinating with VA Facilities Management; and providing safety data sheets. Response times specify on-site emergency response within 2 hours and routine responses within 24 hours, with work scheduled to minimize disruption to patient care. The base performance period is one year with up to four one-year option years. Place of performance is the DC VA Medical Center campus. VA responsibilities include access to areas and utilities, a designated point of contact, and review/approval of completed work and documentation. All work is subject to VA safety, environmental, and infection control requirements and VA infection control risk assessment guidance; mold remediation and demolition must ensure containment and air filtration. Quality assurance provides VA inspection and approval, with deficiencies corrected at no cost, and VA reserves the right to audit contractor records and inspect work at any time.

B.2 STATEMENT OF WORK (SOW) IDIQ Contract Water Intrusion Repairs Washington DC VA Medical Center 50 Irving St. NW, Washington DC 20422 1.0 PURPOSE This Statement of Work (SOW) establishes the requirements for an Indefinite Delivery/Indefinite Quantity (IDIQ) contract to provide all labor, materials, equipment, and supervision necessary to perform water intrusion repairs at the Washington DC VA Medical Center, 50 Irving St. NW, Washington DC 20422. The intent is to address water intrusion incidents promptly and effectively to maintain a safe, healthy, and operational environment for patients, staff, and visitors. 2.0 SCOPE OF WORK The Contractor shall provide all necessary resources to perform water intrusion repairs on an as-needed basis throughout the VA Medical Center campus, including but not limited to: - Emergency and routine response to water leaks, flooding, and moisture infiltration. - Inspection and assessment of affected areas to determine the source and extent of water intrusion. - Removal and replacement of damaged building materials (e.g., drywall, ceiling tiles, insulation, flooring, baseboards). - Temporary and permanent repairs to building envelopes (e.g., roofs, windows, doors, exterior walls, foundations) to prevent recurrence. - Sealing, caulking, and waterproofing as needed. - Mold remediation and abatement in accordance with EPA, OSHA, and VA standards. - Drying and dehumidification of affected areas using appropriate equipment. - Restoration of finishes and surfaces to match existing conditions. - Coordination with VA staff and other contractors as required. - Documentation and reporting of findings, repairs performed, and recommendations for further action. 3.0 DELIVERABLES - Timely response to task orders in accordance with contract requirements (see Section 5.0). - Written assessment and repair report for each incident, including before and after photos. - Recommendations for long-term mitigation, if applicable. - Documentation of materials used, labor hours, and completion date. 3.1 The contractor shall conduct a detailed roof inspection of buildings 1, 4, 6, 14, 16, and 17. The contractor must visually inspect each rooftop area on campus listed above and document any damage or potential damage to roofs including but not limited to, examining the roof membrane for cracks or tears, document ponding water, worn surface conditions, condition of flashing systems, condition of adjoining walls, counterflashing, termination details, soil stacks, vents, and roofing details for any rooftop projections and equipment such as pitch pans, HVAC equipment s, skylight and access hatches, gutters. Contractor shall clear any debris on roof and within gutter systems during inspection. 3.2 Upon completion of their inspection, the contractor shall provide a comprehensive report to the Government which assesses each roof s condition and deficiencies. The report shall minimally identify individual building numbers, type of damage to each roof and area of damage. The report shall contain two main sections, a) Major Roof Repairs/Replacement and b) Regular Recurring Maintenance. 3.2.1 Major Roof Repairs/Replacement: 3.2.1.1 The contractor shall prioritize the list of damaged areas based upon the worse roof conditions. 3.2.1.2 Contractor shall provide a scope of work and detailed cost estimate for any major roof repairs. Separate scopes and estimate for each building. The Government will determine which repairs are to be completed, if any and issue them in whole or in part, as a separate delivery order. 3.3 Recurring Maintenance: 3.3.1 The contractor shall provide a detailed list of regular, recurring maintenance items needed for each roof. The contractor should include a cost estimate for completing regular, recurring maintenance items and minor repairs, as well as a cost for 1 emergency roof repair per month. 3.3.1.1 Regular, recurring maintenance items include, but are not limited to: 3.3.1.1.1 Minor repair and fixes to flashing components and details. 3.3.1.1.2 Intermittent splits, tears, open laps and breaks in roof membrane. 3.3.1.1.3 Tightening drain bolts and clamp rings, replacement of missing components such as drain strainers. Repair of strip-in around drains and scuppers. 3.3.1.1.4 Removal of debris (i.e., leaves, branches, paper, and similar items) from the entire roof membrane, among the mechanical equipment area and drainage areas. 3.3.1.1.5 The final recurring maintenance list shall include recommended duration. 3.3.1.1.6 The recurring maintenance list with recommended durations shall be submitted to COR for approval. 3.3.1.1.7 Upon approval of recurring maintenance list with recommended durations, the contractor shall perform those items as agreed upon. 3.4 Every six months, after the completion of the initial roof inspection report, the Contractor shall continue to perform bi-annual roof inspections in accordance with paragraph 3.1 and 3.2. 3.5 Inspecting or regular maintenance on roofs shall require Contractor to provide a fall protection plan per section 21.C of the EM 385-1-1. Please note this section mandates the requirement to have a competent person in fall protection be designated by the employer to oversee the fall protection plan (Competent person for fall protection is defined in Appendix Q of the EM 385-1-1). The fall protection plan shall be submitted to the Contracting Officer s Representative prior to commencement of work. 3.6 Contractor shall always maintain a clean work area, on a daily basis. 3.7 Contractor shall submit an RFI(s) to the Contacting Officer s representative for any questions or clarifications needed for this SOW prior to submitting the proposal. 4.0 CONTRACTOR RESPONSIBILITIES - Provide all supervision, labor, materials, tools, and equipment necessary to complete repairs. - Ensure all repairs are performed in accordance with applicable federal, state, and local codes and VA standards. - Maintain a safe and clean work environment; implement infection control measures as required. - Properly dispose of all waste and debris in accordance with environmental regulations. - Coordinate work with the VA Facilities Management Service point of contact. - Provide all required safety data sheets (SDS) for chemicals and materials used. 5.0 RESPONSE TIMES AND SCHEDULING - Emergency Repairs: Contractor shall respond on-site within 2 hours of notification for emergency water intrusion events (e.g., active leaks, flooding affecting patient care areas). - Routine Repairs: Contractor shall respond within 24 hours of notification for non-emergency water intrusion repairs. - Work shall be scheduled to minimize disruption to patient care and facility operations. 6.0 PERIOD OF PERFORMANCE - The base contract period is one (1) year from date of award, with up to four (4) one-year option periods. 7.0 PLACE OF PERFORMANCE - Washington DC VA Medical Center 50 Irving St. NW Washington DC 20422 (Including all buildings, structures, and associated grounds on campus) 8.0 VA RESPONSIBILITIES - Provide access to affected areas and necessary utilities. - Designate a point of contact for coordination and oversight. - Review and approve completed work and documentation. 9.0 SAFETY, ENVIRONMENTAL, AND INFECTION CONTROL - Contractor personnel must comply with all VA safety, security, infection control, and environmental regulations and policies. - All work in patient care areas must be performed in accordance with VA infection control risk assessment (ICRA) requirements. - Contractor shall ensure proper containment and air filtration during mold remediation and demolition activities. 10.0 QUALITY ASSURANCE - All work shall be subject to inspection and approval by VA Facilities Management. - Deficiencies shall be corrected at no additional cost to the Government. - VA reserves the right to audit contractor records and inspect work at any time.

From Special Notice posted on Dec 18, 2025

Notice history

1
  1. Special Notice LATEST Posted Dec 18, 2025 View

Details

Solicitation number 36C24526Q0191
Notice ID be775bc042bf401b840cd27581040ccc
Notice type Special Notice
Product / Service (PSC) J049
NAICS 561210
Archive date Feb 24, 2026

Award Information

Awardees
0

Documents

1
View on SAM.gov

Contacts

primary
Bill Pratt

Contracting Officer

Email

Phone

Agency

VETERANS AFFAIRS, DEPARTMENT OF
VETERANS AFFAIRS, DEPARTMENT OF
245-NETWORK CONTRACT OFFICE 5 (36C245)

Place of Performance

Dates

Posted Dec 18, 2025 7 months ago
Last Updated Aug 06, 2026 1 day ago
Due Dec 26, 2025 7 months ago