J045--Repair Boilers #2 and #3 36C26025Q0851

Solicitation 36C26025Q0851 Copied Notice ID 3be18505f6b14696ab66596e9be59230 Copied VETERANS AFFAIRS, DEPARTMENT OF — 260-NETWORK CONTRACT OFFICE 20 (36C260)
SAM.gov
Posted
Aug 15, 2025
Deadline
Sep 08, 2025
Set-aside
None
NAICS
238220
PSC
J045

Summary

AI-generated · Aug 24, 2025

Repair and restoration of Boilers #2 and #3 at the VA Southern Oregon Rehabilitation Center boiler plant, including complete disassembly, repair, and reassembly of burner assemblies and associated components. Tasks include removing burners and related tubes and covers, replacing damaged or stripped studs, installing windbox covers with Fender and lock washers and brass nuts, rebuilding the Morrison Tube mounting ring with new gaskets, repairing refractory seals, and re-installing burners, gaskets, and all piping and electrical connections. Verify flame on both natural gas and #2 fuel oil, provide any refractory curing requirements, and furnish a full report of findings and recommendations. On-site work will require welding to be performed or supervised by a licensed boiler maker and electrical work by a licensed electrician, with licensing and factory training documents provided before starting. Additional studs will need replacement on the #3 boiler windbox access cover during the visit.

This is market research to determine the availability and capability of firms to perform the described boiler repairs and to help shape a potential future solicitation. Respondents should submit a concise capability statement (up to two pages) describing how they would meet the project requirements, note any concerns about meeting Buy American/Trade Agreement Act requirements, and indicate any challenges related to SDVOSB/VOSB subcontracting limitations.

This is a SOURCES SOUGHT NOTICE only in support of the Veterans Affairs (VA) s Southern Oregon Rehabilitation Center and Clinics (VA SORCC) located in White City, OR. This sources sought is for market research purposes only to determine the availability of potential businesses who are interested and capable of meeting the requirements for the project summarized below. Responses may be used to determine acquisition strategy for a potential future acquisition but will not be the sole market research method used. Interested parties are invited to provide a response that includes the following information by email only to Meredith.valentine@va.gov and Helen.Woods@va.gov by no later than 1200 Pacific on 08 September 2025. Response shall include: Company Name, address, point of contact, and SAM UEI. Note- companies are not required to be SAM registered to respond to this notice but are highly encouraged to do so as SAM registration is mandatory to submit a response if a solicitation is issued for this requirement to be considered for an award. List of any additional information your firm would need to be able to submit an accurate and complete offer if a solicitation were issued for this project. A capability statement of no more than two (2) pages succinctly describing how your company is capable of completing this specific project s requirements. Generalized statements that do not show specific capability to meet requirements will not be used to determine a set-aside. List any concerns your company has with providing domestic end-products/made in USA items to meet requirements to comply with Buy American and/or Trade Agreement Act requirements or awareness of any challenges to meeting these requirements. If your company is a SDVOSB and/or VOSB, indicate if your company anticipates any challenges complying with the limitations on subcontracting for general construction outlined on VA.gov under VAAR 852.219-75(JAN 2023)(DEVIATION). NAICS code is currently anticipated as 238220. The product service code will be J045. If you disagree, please include your recommendation in your response. Project Summary: The consultant shall supply all labor, material and equipment to: Remove Burner from Burner Mounting Ring, Remove Burner Blast Tube from Burner, Remove Windbox Cover from right hand side of Blast Tube, Replace any Broken Stripped or damaged studs, Replace Windbox cover with new Fender and Lock Washers and install Brass Nuts, Remove Burner Mounting Ring from Boiler, Replace broken and stripped studs on the mounting ring of the Morrison Tube for #2 Boiler. Re-install Burner Mounting Ring with new finder washers and lock washers and install new brass nuts. Repair refractory damaged in Burner Mounting ring removal. Re-install Burner Mounting Ring with new Gaskets, replace Refractory seal for Burner Mounting ring. Re-install Burner Blast Tube with new gaskets, reattach burner and re-install all piping and electrical connections removed during disassembly. Ensure Burner fires on both Natural Gas and #2 Fuel Oil. Provide any refractory curing requirements. Additional Studs to be Replaced on #3 Boiler windbox access cover while onsite. Work to be performed at the Southern Oregon Rehabilitation Center and Clinics White City Oregon VAMC Boiler Plant. The work shall be documented in a full report of findings and recommendations. All Welding must be performed by or Supervised by a Licensed Boiler Maker. All Electrical work to be performed by a Licensed Electrician. Copies of licensing and factory training will be required prior to starting work. Work will be done on the Equipment listed below. #2 Boiler Superior Model 7-X-1250 National Board # 19030 Year Built 2019 #2 Burner Webster Cyclonetic Model # JBEX5C-75-K-(****).M.(**)-MA-NFPS-85 Serial # 130478A-01 #3 Burner Webster Cyclonetic Model # JBEX5C-75-K-(****).M.(**)-MA-NFPS-85 Serial # 130478A-02 The period of performance is estimated at 30-45 days, but a final period of performance will be provided in a solicitation if one is issued.

From Sources Sought posted on Aug 15, 2025

SITE VISIT: 10/24/2025 @ 10AM Pacific, White City SORCC Bldg. 229 - ask for Trevor or Stephen Project Summary: The consultant shall supply all labor, material and equipment to: Remove Burner from Burner Mounting Ring, Remove Burner Blast Tube from Burner, Remove Windbox Cover from right hand side of Blast Tube, Replace any Broken Stripped or damaged studs, Replace Windbox cover with new Fender and Lock Washers and install Brass Nuts, Remove Burner Mounting Ring from Boiler, Replace broken and stripped studs on the mounting ring of the Morrison Tube for #2 Boiler. Re-install Burner Mounting Ring with new finder washers and lock washers and install new brass nuts. Repair refractory damaged in Burner Mounting ring removal. Re-install Burner Mounting Ring with new Gaskets, replace Refractory seal for Burner Mounting ring. Re-install Burner Blast Tube with new gaskets, reattach burner and re-install all piping and electrical connections removed during disassembly. Ensure Burner fires on both Natural Gas and #2 Fuel Oil. Provide any refractory curing requirements. Additional Studs to be Replaced on #3 Boiler windbox access cover while onsite. Work to be performed at the Southern Oregon Rehabilitation Center and Clinics White City Oregon VAMC Boiler Plant. The work shall be documented in a full report of findings and recommendations. All Welding must be performed by or Supervised by a Licensed Boiler Maker. All Electrical work to be performed by a Licensed Electrician. Copies of licensing and factory training will be required prior to starting work. Work will be done on the Equipment listed below. #2 Boiler Superior Model 7-X-1250 National Board # 19030 Year Built 2019 #2 Burner Webster Cyclonetic Model # JBEX5C-75-K-(****).M.(**)-MA-NFPS-85 Serial # 130478A-01 #3 Burner Webster Cyclonetic Model # JBEX5C-75-K-(****).M.(**)-MA-NFPS-85 Serial # 130478A-02 The period of performance is estimated at 30-45 days, but a final period of performance will be provided in a solicitation if one is issued.

From Combined Synopsis/Solicitation posted on Oct 21, 2025

SITE VISIT: 10/24/2025 @ 10AM Pacific, White City SORCC Bldg. 229 - ask for Trevor or Stephen Project Summary: The consultant shall supply all labor, material and equipment to: Remove Burner from Burner Mounting Ring, Remove Burner Blast Tube from Burner, Remove Windbox Cover from right hand side of Blast Tube, Replace any Broken Stripped or damaged studs, Replace Windbox cover with new Fender and Lock Washers and install Brass Nuts, Remove Burner Mounting Ring from Boiler, Replace broken and stripped studs on the mounting ring of the Morrison Tube for #2 Boiler. Re-install Burner Mounting Ring with new finder washers and lock washers and install new brass nuts. Repair refractory damaged in Burner Mounting ring removal. Re-install Burner Mounting Ring with new Gaskets, replace Refractory seal for Burner Mounting ring. Re-install Burner Blast Tube with new gaskets, reattach burner and re-install all piping and electrical connections removed during disassembly. Ensure Burner fires on both Natural Gas and #2 Fuel Oil. Provide any refractory curing requirements. Additional Studs to be Replaced on #3 Boiler windbox access cover while onsite. Work to be performed at the Southern Oregon Rehabilitation Center and Clinics White City Oregon VAMC Boiler Plant. The work shall be documented in a full report of findings and recommendations. All Welding must be performed by or Supervised by a Licensed Boiler Maker. All Electrical work to be performed by a Licensed Electrician. Copies of licensing and factory training will be required prior to starting work. Work will be done on the Equipment listed below. #2 Boiler Superior Model 7-X-1250 National Board # 19030 Year Built 2019 #2 Burner Webster Cyclonetic Model # JBEX5C-75-K-(****).M.(**)-MA-NFPS-85 Serial # 130478A-01 #3 Burner Webster Cyclonetic Model # JBEX5C-75-K-(****).M.(**)-MA-NFPS-85 Serial # 130478A-02 The period of performance is estimated at 30-45 days, but a final period of performance will be provided in a solicitation if one is issued.

From Combined Synopsis/Solicitation posted on Oct 24, 2025

Notice history

3
  1. Sources Sought Posted Aug 15, 2025
  2. Combined Synopsis/Solicitation Posted Oct 21, 2025
    • Title: J045--Repair Boilers #2 and #3J045--Repair Boilers #2 and #3 White City SORCC
    • Description: Description was updated
    • Notice Type: Sources SoughtCombined Synopsis/Solicitation
    • Response Deadline: Sep 08, 2025Oct 28, 2025
    • Set-Aside: NoneNo Set aside used
  3. Combined Synopsis/Solicitation LATEST Posted Oct 24, 2025
    No changes from previous notice

Details

Solicitation number 36C26025Q0851
Notice ID 3be18505f6b14696ab66596e9be59230
Notice type Sources Sought
Product / Service (PSC) J045
NAICS 238220
Archive date Sep 18, 2025

Award Information

Awardees
0

Documents

1
View on SAM.gov

Contacts

primary
Meredith Valentine

Contract Specialist

Email

Agency

VETERANS AFFAIRS, DEPARTMENT OF
VETERANS AFFAIRS, DEPARTMENT OF
260-NETWORK CONTRACT OFFICE 20 (36C260)

Place of Performance

White City SORCC 8495 Crater Lake Hwy,
White City, OR 97503

Dates

Posted Aug 15, 2025 11 months ago
Last Updated Aug 06, 2026 1 day ago
Due Sep 08, 2025 10 months ago