J045--PMI Boiler Inspection -w/wd, Base+4, POP 3/30/2026 - 3/29/2031 36C26226Q0364
Summary
AI-generated · Feb 12, 2026Inspection services for PMI pressure boilers are being sought, with a base period and four option years. The work involves performing boiler inspections on PMI pressure boilers to help ensure safety and compliance with applicable codes and standards throughout the contract term. No brand-name or site-visit requirements are indicated, and details will be provided in the forthcoming solicitation.
PMI Pressure Boilers
From Presolicitation posted on Feb 11, 2026PMI Pressure Boilers
From Solicitation posted on Feb 17, 2026Boiler PMI Services
From Solicitation posted on Feb 19, 2026Questions for 36C26226Q0326_1 PMI Boiler Inspection Services Please provide installation date for each boiler to assist with preparation of required inspection/maintenance schedule? Installation dates are TBD. April/September For High and Low Pressure Boilers. Refer to SOW for details of each. Pricing schedule - CLN 0006 - is this intended to price a backup boiler if required per page 45 (6.3 requirement)? Yes, if there need to be work on a boiler that it needs to be shut down more than 72hrs for repair. Is it anticipated that Welding work will be required, noting the technical requirements for a welder certification in the solicitation- They will need to have welding Certification to weld on parts if needed. 2-4 hours response time - is that by telephone or on-site response? On Site response PMI Boiler Inspection Services
From Solicitation posted on Feb 23, 2026Notice history
4-
Presolicitation Posted Feb 11, 2026
-
Solicitation Posted Feb 17, 2026View changes (3)
- Notice Type: Presolicitation → Solicitation
- Response Deadline: Mar 02, 2026 → Mar 06, 2026
- Set-Aside: Service-Disabled Veteran-Owned Small Business Set Aside → None
Details
Award Information
Contacts
Contract Specialist
Phone
Agency
Place of Performance
650 E. Indian School Road
Phoenix, Arizona 85012
USA