J045--Boiler Safety Device Testing/Inspection Services 36C25626Q0276
Summary
AI-generated · Jan 03, 2026Boiler safety device testing and inspection services must be provided in accordance with the terms and conditions in the Performance Work Statement. The scope covers testing and inspecting boiler safety devices to ensure compliance with safety standards and proper operation.
The contractor shall provide Boiler Safety Testing/Inspection/services in accordance with the terms and conditions stated within this Performance Work Statement (PWS).
From Combined Synopsis/Solicitation posted on Jan 02, 2026AMENDMENT - The purpose of this amendment is to incorporate a site visit for this solicitation. All contractors are highly encouraged to attend the site visit to be held on: Tuesday, January 20, 2026 11:00 AM CST Meeting Location. John L. McClellan Memorial Veterans Hospital 4300 West 7th Street Boiler plant - Room GD-129 Little Rock, AR 72205 Points of Contact: John Ringo - PH: 501-257-4854 Email: john.ringo@va.gov Brian Crawford - PH: 501-257-2088 Email: brian.crawford@va.gov NOTE: This is the only site visit that will be conducted.
From Combined Synopsis/Solicitation posted on Jan 13, 2026AMENDMENT - The purpose of this amendment is to incorporate vendors' questions and Government answers in this solicitation. The following answers/response are provide for vendors' questions. Question 1: Can you provide a list of devices that require calibration? Answer 1: Please refer to the Performance Work Statement (PWS). The PWS includes all devices that need calibration. Question 2: Can you please confirm that there is no up time required between safety device testing and the tuning? They could occur during the same semi-annual visit. Answer: Yes.
From Combined Synopsis/Solicitation posted on Jan 15, 2026AMENDMENT - The purpose of this amendment is to extend the due date and time for responses from 8:00 AM 1/27/26 to now read 10:00am 2/3/26.
From Combined Synopsis/Solicitation posted on Jan 22, 2026AMENDMENT 0004- The purpose of this amendment is to provide responses to vendors' questions. The following responses are provided: (SEE ATTACHMENT) Question 1: Place of Performance (pages 2 & 3): Please confirm that there are two separate locations where services are required: Eugene J. Towbin Healthcare Center: 2200 West Fort Roots Drive North Little Rock, AR 72114. John L. McClellan Memorial Veterans Hospital: 4300 W 7th St. Little Rock. AR 72205. Answer 1: Services are required at the two separate locations listed above. Question 2: Internal Boiler Inspection Requirement: The PWS document does not specify whether annual internal boiler inspections are required. Please confirm if this contract includes internal inspections performed by a National Board (NB) / ASME-certified boiler inspector, or if the scope is limited strictly to safety device testing If internal inspections are required, please confirm whether: VA will open, drain, clean, and prepare the boilers Any state of Arkansas jurisdictional inspection coordination is required under this contract Answer 2: Safety device testing only. Question 3: Non-Destructive Testing (NDT): The PWS document does not specify any non-destructive testing (NDT) requirements for boilers, deaerators, or condensate tanks. Please confirm whether any NDT services are included or excluded from this contract. Answer 3: Safety device testing only. Question 4: VHA Boiler Plant Safety Device Testing Manual Edition Conflict: The PWS references two (2) editions: Page 12 and Section 1.e/f reference the Fifth Edition. Section 1.b.v references the Seventh Edition. Please confirm the official edition of the VHA Boiler Plant Safety Device Testing Manual that the contractor is required to follow. Answer 4: The official edition of the VHA Boiler Plant Safety Device Testing Manual that the contractor is required to follow is the most current, 7th Edition. Question 5: OEM Authorization: Please confirm whether OEM authorization letters are required for: Each boiler manufacturer (Superior and Johnston) Burner management systems and safety controls (if different OEMs apply) Also, please confirm whether subcontractors performing testing must also hold OEM authorization, or if authorization held by the prime contractor is sufficient. Answer 5: OEM authorization letters are not required but will be accepted. However, contractor shall provide proof of certification attesting that all gauging and measurement equipment used has been currently calibrated either according to the manufacturer s specifications or a standard traceable to the National Bureau of Standards. Combustion Analysis and Safety Device Testing personnel shall be qualified for boiler plant burner, control and instrumentation testing. Qualifications include completing at least a one-year trade school and five years of successful experience in this field. The experience shall be largely with institutional and industrial boiler plants similar in design to the VAMC plants. Question 6: Repairs and Out-of-Scope Work: The PWS document indicates that adjustment and calibration of safety devices. Please clarify: Are minor adjustments and calibrations included in the base scope? : Are repairs, parts replacement, or corrective maintenance excluded and must be quoted separately? Should the contractor provide written repair recommendations only, or Is the contractor expected to submit repair quotes under this contract? 6. Answer 6: a. Minor adjustments and calibrations: Yes if adjustments can be made to bring device into compliance. If necessary, make adjustments to the fuel flow and combustion air controllers, control valves and dampers to obtain the required performance. Repairs, parts replacement, or corrective maintenance are excluded. Contractor shall immediately inform COR of any recommended repairs, modifications, or safety related problems. Contractor can quote separately if desired. Yes, contractor shall provide written repair recommendations only. Question 7: Emergency Call-Out Services The PWS document does not reference emergencies, after-hours, or unscheduled call-out services related to boiler, burner, or safety device failures discovered during or outside the scheduled semi-annual testing. Please confirm whether emergency response or on-call services are: Included within the scope of this contract, or Excluded and to be handled under a separate contract or task order. If emergency services are included, please clarify: Required response time (e.g., 2-hour, 4-hour, same-day) Whether after-hours, weekend, or holiday work may be required How these services are to be authorized and charged. There is not a CLIN number added to the cost schedule. Answer 7: Emergency responses or on-call services are not included in this contract. End
From Combined Synopsis/Solicitation posted on Jan 27, 2026Notice history
6-
-
Combined Synopsis/Solicitation Posted Jan 13, 2026View changes (2)
- Description: Description was updated
- Response Deadline: Jan 23, 2026 → Jan 27, 2026
-
Combined Synopsis/Solicitation Posted Jan 15, 2026View changes (1)
- Description: Description was updated
-
Combined Synopsis/Solicitation Posted Jan 22, 2026View changes (2)
- Description: Description was updated
- Response Deadline: Jan 27, 2026 → Feb 03, 2026
-
Combined Synopsis/Solicitation Posted Jan 27, 2026View changes (1)
- Description: Description was updated
-
Award Notice LATEST Posted Apr 01, 2026
Details
Award Information
Awardees
| Company Name | UEI | CAGE Code | Location |
|---|---|---|---|
| ATZ SOLUTION LLC | EDYBXLTSKGG5 | 9LYF8 | CHARLOTTE |
Contacts
CONTRACTNG OFFICER
Phone