J041--(BRAD DAVIS) 688-26-1-459-0046 | GE113D DEHUMITIFER HVAC | ( VA-26-00023470) (VA-26-00023470) 36C24526Q0137
Summary
AI-generated · Nov 25, 2025A dehumidifier repair/replacement project at the Washington DC VA Medical Center requires assessing the existing GE113D unit, safely disconnecting and removing it, and supplying and installing a new Aprilaire dehumidifier with equal or better capacity. The replacement must be new, covered by the manufacturer's warranty, and installed in the same location with all electrical and drainage connections done per the manufacturer’s instructions and applicable codes. The contractor will perform system testing, provide basic operator training to VA staff, and supply all manuals, warranty information, and installation records, then clean up the site and dispose of the old equipment per regulations.
The project must be completed within 30 calendar days from the notice to proceed, with performance at the DC VA Medical Center. Work must comply with OSHA, VA, and local safety requirements, and contractors must check in with Facilities Management and follow VA policies. Deliverables include removal and disposal of the existing unit, supply and installation of the new Aprilaire unit, staff training, and a complete documentation package. Acceptance criteria require the new unit to be fully operational per manufacturer specs, the area to be clean, VA staff trained, and all documentation delivered. The notice also requests information on whether the respondent will self-perform or subcontract and how subcontracting limitations would be met, as part of the information-gathering process.
DISCLAIMER This RFI is issued solely for information and planning purposes only and does not constitute a solicitation. All information received in response to this RFI that is marked as proprietary will be handled accordingly. In accordance with FAR 15.201(e), responses to this notice are not offers and cannot be accepted by the Government to form a binding contract. Responders are solely responsible for all expenses associated with responding to this RFI. Included in your Capability Statement your SAM s UEI Number, Business Size (VOSB, SB, LG) and answer the following question if subcontracting is required. . Shall Provide response to the Subcontracting inquiry below: Do you intend to self-perform this effort? If you are located outside the immediate area of contract performance, how will you self-perform? Or do you intend to subcontract work under this contract? If you intend to subcontract work under this contract, how will you ensure compliance with the limitations on subcontracting? This is for information purposes only. Submit information by Friday 11/28/2025 at 8am to Keysha.Gorman74@va.gov. Statement of Work (SOW) GE113D Dehumidifier Repair and Replacement Washington DC VA Medical Center 50 Irving St. NW, Washington DC 20422 1. Introduction This Statement of Work (SOW) outlines the requirements for the repair and replacement of the existing GE113D dehumidifier at the Washington DC VA Medical Center, located at 50 Irving St. NW, Washington DC 20422. The scope includes the supply and installation of a new Aprilaire dehumidifier. 2. Scope of Work 2.1 Assessment and Removal - Contractor shall assess the existing GE113D dehumidifier to confirm that replacement is necessary. - Safely disconnect and remove the existing GE113D dehumidifier, ensuring all utility connections (electrical, drainage, etc.) are properly terminated according to code. 2.2 Supply of New Equipment - Contractor shall supply a new Aprilaire dehumidifier, appropriate in capacity and specifications to meet or exceed the performance of the existing GE113D unit. - All equipment supplied must be new and covered by the manufacturer s warranty. 2.3 Installation - Install the new Aprilaire dehumidifier in the location of the previous unit. - Ensure all electrical and drainage connections are made according to manufacturer s instructions and local codes. - Secure the unit and ensure proper leveling, airflow, and access for future maintenance. - Test the unit to verify correct operation and performance. 2.4 Cleanup and Disposal - Remove all debris, old equipment, and packaging materials from the site. - Dispose of the old dehumidifier and all waste materials in accordance with local, state, and federal regulations. 2.5 Training and Documentation - Provide basic operational training to designated VA Medical Center personnel. - Supply all documentation, including manufacturer s manuals, warranty information, and installation records. 3. Period of Performance - All work shall be completed within 30 calendar days of notice to proceed. 4. Place of Performance Washington DC VA Medical Center 50 Irving St. NW Washington DC 20422 5. Points of Contact - [Insert VA Project Manager Name, Title, Email, and Phone Number] - Contractor Project Manager: [To be provided by contractor] 6. Safety and Compliance - All work shall be performed in compliance with OSHA, VA, and local safety regulations. - Contractor personnel must check in with Facilities Management upon arrival and comply with all VA Medical Center policies. 7. Deliverables - Removal and proper disposal of existing dehumidifier - Supply and installation of new Aprilaire dehumidifier - Operational training for VA staff - Complete documentation package 8. Acceptance Criteria - New dehumidifier is fully operational and meets manufacturer s performance specifications - Area is clean and free of debris - VA staff have received operational training - All documentation has been delivered
From Sources Sought posted on Nov 24, 2025Notice history
1Details
Award Information
Contacts
Contracting Officer
Phone
Agency
Place of Performance
10 N Greene St
Baltimore, MD 21201