ISP Network Cable Installation for B600 JBER Alaska W912D025R0010
Summary
AI-generated · Aug 24, 2025Install ISP network cables to support ISO NIPRNET and SIPRNET connectivity in Building 600 at JBER, Alaska, providing all necessary materials and labor per the stated SOW. All work must comply with DoD/Army standards and ANSI/TIA-EIA telecommunications standards. For ICIDS and ACS, procure, install, and test Honeywell Vindicator systems designed to meet or exceed AR 380-5 and JBER Air Force standards, fully integrating them into the JBER Air Force IDS/ACS infrastructure and performing performance verification so the system can provide timely intruder warnings to the active monitoring station, including all programming and receiver-system integration per base requirements to deliver a fully functional, operational solution.
An amendment adds base-access information for a required site visit to Building 600. Contractors must obtain base access and report to the Fort Richardson Visitors Center to participate in the site visit; further access instructions and timing details are provided in the amendment. The core scope and requirements remain the same.
The contractor shall provide the required materials, labors, and perform identified tasks within SOW for ISP Network cables ISO NIPRNET and SIPRNET connectivity. All repair and installation efforts shall be in accordance with DoD, Army, and the industry standards mandated by public-law 104-113, section 12 Standards Conformity (ANSI TIA/EIA telecommunications standards) as listed below. For ICIDS and ACS, the contractor shall procure, provide the required materials, install, and test Honeywell Vindicator ICIDS and ACS designed to meet or exceed AR 380-5 and JBER Air force standards within BLDG 600, JBER, Alaska. Systems must be fully integrated into JBER Air Force control IDS and ACS infrastructure and tested system performance verification in order to provide early warning of an intruder to active monitoring station, as well as all programming and integration of the receiver system per JBER base requirements for a fully functional and operational system.
From Combined Synopsis/Solicitation posted on Aug 05, 2025The contractor shall provide the required materials, labors, and perform identified tasks within SOW for ISP Network cables ISO NIPRNET and SIPRNET connectivity. All repair and installation efforts shall be in accordance with DoD, Army, and the industry standards mandated by public-law 104-113, section 12 Standards Conformity (ANSI TIA/EIA telecommunications standards) as listed below. For ICIDS and ACS, the contractor shall procure, provide the required materials, install, and test Honeywell Vindicator ICIDS and ACS designed to meet or exceed AR 380-5 and JBER Air force standards within BLDG 600, JBER, Alaska. Systems must be fully integrated into JBER Air Force control IDS and ACS infrastructure and tested system performance verification in order to provide early warning of an intruder to active monitoring station, as well as all programming and integration of the receiver system per JBER base requirements for a fully functional and operational system.
From Combined Synopsis/Solicitation posted on Aug 14, 2025The puprose of this amendment (W912D0R00100002) is to provide an additional information (Base Access) to the site visit at Building 600, on 08/19/2025 at 10:00 a.m. - Contracting Specialist will meet contractors requiring Base Access for the site visit at Fort Richardson Visitior's Center, Building 47303, JBER Anchorage, Alaska, from 09:00 a.m.-09:45 a.m. The contractor shall provide the required materials, labors, and perform identified tasks within SOW for ISP Network cables ISO NIPRNET and SIPRNET connectivity. All repair and installation efforts shall be in accordance with DoD, Army, and the industry standards mandated by public-law 104-113, section 12 Standards Conformity (ANSI TIA/EIA telecommunications standards) as listed below. For ICIDS and ACS, the contractor shall procure, provide the required materials, install, and test Honeywell Vindicator ICIDS and ACS designed to meet or exceed AR 380-5 and JBER Air force standards within BLDG 600, JBER, Alaska. Systems must be fully integrated into JBER Air Force control IDS and ACS infrastructure and tested system performance verification in order to provide early warning of an intruder to active monitoring station, as well as all programming and integration of the receiver system per JBER base requirements for a fully functional and operational system.
From Combined Synopsis/Solicitation posted on Aug 18, 2025-The purpose of this amendment (W912D025R00100003)is to extend the due date of the solicitation to 28 August 2025 at 10.00a.m. AKST as well as highlight the section 12 of the Statement of Work credential requirement for this contract which will be looked/reviewed for evaluation purposes. See sam.gov for anwers to the RFI questions. All other terms and conditions remains unchanged. -The puprose of this amendment (W912D0R00100002) is to provide an additional information (Base Access) to the site visit at Building 600, on 08/19/2025 at 10:00 a.m. - Contracting Specialist will meet contractors requiring Base Access for the site visit at Fort Richardson Visitior's Center, Building 47303, JBER Anchorage, Alaska, from 09:00 a.m.-09:45 a.m. The contractor shall provide the required materials, labors, and perform identified tasks within SOW for ISP Network cables ISO NIPRNET and SIPRNET connectivity. All repair and installation efforts shall be in accordance with DoD, Army, and the industry standards mandated by public-law 104-113, section 12 Standards Conformity (ANSI TIA/EIA telecommunications standards) as listed below. For ICIDS and ACS, the contractor shall procure, provide the required materials, install, and test Honeywell Vindicator ICIDS and ACS designed to meet or exceed AR 380-5 and JBER Air force standards within BLDG 600, JBER, Alaska. Systems must be fully integrated into JBER Air Force control IDS and ACS infrastructure and tested system performance verification in order to provide early warning of an intruder to active monitoring station, as well as all programming and integration of the receiver system per JBER base requirements for a fully functional and operational system.
From Combined Synopsis/Solicitation posted on Aug 25, 2025-The purpose of this amendment (W912D025R00100003)is to extend the due date of the solicitation to 28 August 2025 at 10.00a.m. AKST as well as highlight the section 12 of the Statement of Work credential requirement for this contract which will be looked/reviewed for evaluation purposes. See sam.gov for anwers to the RFI questions. All other terms and conditions remains unchanged. -The puprose of this amendment (W912D0R00100002) is to provide an additional information (Base Access) to the site visit at Building 600, on 08/19/2025 at 10:00 a.m. - Contracting Specialist will meet contractors requiring Base Access for the site visit at Fort Richardson Visitior's Center, Building 47303, JBER Anchorage, Alaska, from 09:00 a.m.-09:45 a.m. The contractor shall provide the required materials, labors, and perform identified tasks within SOW for ISP Network cables ISO NIPRNET and SIPRNET connectivity. All repair and installation efforts shall be in accordance with DoD, Army, and the industry standards mandated by public-law 104-113, section 12 Standards Conformity (ANSI TIA/EIA telecommunications standards) as listed below. For ICIDS and ACS, the contractor shall procure, provide the required materials, install, and test Honeywell Vindicator ICIDS and ACS designed to meet or exceed AR 380-5 and JBER Air force standards within BLDG 600, JBER, Alaska. Systems must be fully integrated into JBER Air Force control IDS and ACS infrastructure and tested system performance verification in order to provide early warning of an intruder to active monitoring station, as well as all programming and integration of the receiver system per JBER base requirements for a fully functional and operational system.
From Combined Synopsis/Solicitation posted on Aug 27, 2025Notice history
5-
Combined Synopsis/Solicitation Posted Aug 05, 2025
-
Combined Synopsis/Solicitation Posted Aug 14, 2025View changes (1)
- Response Deadline: Aug 20, 2025 → Aug 25, 2025
-
Combined Synopsis/Solicitation Posted Aug 18, 2025View changes (1)
- Description: Description was updated
-
Combined Synopsis/Solicitation Posted Aug 25, 2025View changes (2)
- Description: Description was updated
- Response Deadline: Aug 25, 2025 → Aug 28, 2025
-
Combined Synopsis/Solicitation LATEST Posted Aug 27, 2025No changes from previous notice
Details
Award Information
Not yet awarded
Contacts
Agency
Place of Performance
USA