Intrusion Detection System (IDS) and monitoring station FA850125Q0067
Summary
AI-generated · Aug 25, 2025Provide a site survey and installation for a Vindicator Intrusion Detection System (IDS) and monitoring station to meet specified physical security requirements, including DAFI 31-101 DAFGM2022-01 GENADMIN and ESE-SIT-0001 for asset protection. Proposals must describe how both the equipment and installation will be delivered, including company qualifications and experience with Vindicator systems; a site diagram and CDRLs are attached for layout reference, with Areas “G” and “J” on the floor plan requiring IDS for Secret Open Storage accreditation. The contractor is responsible for all necessary infrastructure upgrades to support system operations.
Quotations will be evaluated for technical acceptability and suitability for award. Review attachments and the floor plan areas noted; no changes occur across the three notices—identical requirements and supporting materials.
This is a combined synopsis and solicitation The Government's is requesting quotes for the requirement of a site survey for quote and installation of a Vindicator Intrusion Detection System (IDS) and monitoring station designed to meet the physical security compliance requirements of DAFI 31-101 DAFGM2022-01 GENADMIN, Robins AFB specifications, and ESE-SIT-0001 for protection of assets. The offer must include in their quote a description on how they will fulfill both the equipment and installation requirements, including qualifications and experience with Vindicator systems. The government will evaluate these responses to determine technical acceptability and suitability for award. A site diagram, along with CDRL's is attached to provide some information about layout. Please review the attachments and look at Areas "G" and "J" indicated on the floor plan. Those areas will require IDS for Secret Open Storage accreditation. The contractor shall provide all necessary infrastructure upgrades to support systems operations. For more details about this requirement please refer to the attachments.
From Solicitation posted on Aug 14, 2025This is a combined synopsis and solicitation The Government's is requesting quotes for the requirement of a site survey for quote and installation of a Vindicator Intrusion Detection System (IDS) and monitoring station designed to meet the physical security compliance requirements of DAFI 31-101 DAFGM2022-01 GENADMIN, Robins AFB specifications, and ESE-SIT-0001 for protection of assets. The offer must include in their quote a description on how they will fulfill both the equipment and installation requirements, including qualifications and experience with Vindicator systems. The government will evaluate these responses to determine technical acceptability and suitability for award. A site diagram, along with CDRL's is attached to provide some information about layout. Please review the attachments and look at Areas "G" and "J" indicated on the floor plan. Those areas will require IDS for Secret Open Storage accreditation. The contractor shall provide all necessary infrastructure upgrades to support systems operations. For more details about this requirement please refer to the attachments.
From Solicitation posted on Aug 19, 2025This is a combined synopsis and solicitation The Government's is requesting quotes for the requirement of a site survey for quote and installation of a Vindicator Intrusion Detection System (IDS) and monitoring station designed to meet the physical security compliance requirements of DAFI 31-101 DAFGM2022-01 GENADMIN, Robins AFB specifications, and ESE-SIT-0001 for protection of assets. The offer must include in their quote a description on how they will fulfill both the equipment and installation requirements, including qualifications and experience with Vindicator systems. The government will evaluate these responses to determine technical acceptability and suitability for award. A site diagram, along with CDRL's is attached to provide some information about layout. Please review the attachments and look at Areas "G" and "J" indicated on the floor plan. Those areas will require IDS for Secret Open Storage accreditation. The contractor shall provide all necessary infrastructure upgrades to support systems operations. For more details about this requirement please refer to the attachments.
From Solicitation posted on Aug 20, 2025Notice history
3-
-
Solicitation Posted Aug 19, 2025No changes from previous notice
-
Solicitation LATEST Posted Aug 20, 2025View changes (1)
- Response Deadline: Aug 22, 2025 → Aug 29, 2025
Details
Award Information
Not yet awarded
Contacts
Agency
Place of Performance
USA