Intrusion Detection System for SCIF at NBSFS 2025-PZI-1462
Summary
AI-generated · Aug 27, 2025Engineered, designed, furnished, installed, and tested (EDFI&T) Intrusion Detection System (IDS) and Access Control System (ACS) for a Sensitive Compartmented Information Facility (SCIF) at New Boston Space Force Station, based on the Vindicator platform. The system must conform to all applicable regulations, guard against various physical threats, and provide detection, annunciation, and security for the SCIF resource. The work is divided into two contract line items: CLIN 1 for design; an optional CLIN 2 for installation, with identical general requirements across both CLINs (contractor responsibilities and project management). The Statement of Objectives (SOO) contains additional details.
An update notes that a site visit has been scheduled, and registration directions are in the combined synopsis. This notice is a combined synopsis/solicitation for the IDS/ACS project at NBSFS, with the site visit intended for bidders to gather information. No further specifics are provided here.
This requirement is for the contractor to Engineer, Design, Furnish, Install, and Test (EDFI&T) of an Intrusion Detection System (IDS) and Access Control System (ACS) for a Sensitive Compartmented Information Facility (SCIF) at New Boston Space Force Station (NBSFS) based on the Vindicator platform. The IDS/ACS must comply with all applicable regulations and protect against various physical threats, providing detection, annunciation, and security for the SCIF resource. This project is broken into two CLINS. CLIN 1 is the design phase and Option CLIN 2 is the installation phase. General project requirements are the same on each CLIN such as contractor responsibilities and project management. Please reference the attached Statement of Objectives (SOO) for additional information.
From Combined Synopsis/Solicitation posted on Jul 31, 2025UPDATE 5 AUG 25- Site Visit is scheduled for 14 Aug 25 at 1100. Please follow directions in Combo Synopsis to register. This requirement is for the contractor to Engineer, Design, Furnish, Install, and Test (EDFI&T) of an Intrusion Detection System (IDS) and Access Control System (ACS) for a Sensitive Compartmented Information Facility (SCIF) at New Boston Space Force Station (NBSFS) based on the Vindicator platform. The IDS/ACS must comply with all applicable regulations and protect against various physical threats, providing detection, annunciation, and security for the SCIF resource. This project is broken into two CLINS. CLIN 1 is the design phase and Option CLIN 2 is the installation phase. General project requirements are the same on each CLIN such as contractor responsibilities and project management. Please reference the attached Statement of Objectives (SOO) for additional information.
From Combined Synopsis/Solicitation posted on Aug 05, 2025UPDATE 5 AUG 25- Site Visit is scheduled for 14 Aug 25 at 1100. Please follow directions in Combo Synopsis to register. This requirement is for the contractor to Engineer, Design, Furnish, Install, and Test (EDFI&T) of an Intrusion Detection System (IDS) and Access Control System (ACS) for a Sensitive Compartmented Information Facility (SCIF) at New Boston Space Force Station (NBSFS) based on the Vindicator platform. The IDS/ACS must comply with all applicable regulations and protect against various physical threats, providing detection, annunciation, and security for the SCIF resource. This project is broken into two CLINS. CLIN 1 is the design phase and Option CLIN 2 is the installation phase. General project requirements are the same on each CLIN such as contractor responsibilities and project management. Please reference the attached Statement of Objectives (SOO) for additional information.
From Combined Synopsis/Solicitation posted on Aug 27, 2025UPDATE 2 SEP 25- Proposals have been extended to 5 Sept. 2025 at 12:00 PM. UPDATE 5 AUG 25- Site Visit is scheduled for 14 Aug 25 at 1100. Please follow directions in Combo Synopsis to register. This requirement is for the contractor to Engineer, Design, Furnish, Install, and Test (EDFI&T) of an Intrusion Detection System (IDS) and Access Control System (ACS) for a Sensitive Compartmented Information Facility (SCIF) at New Boston Space Force Station (NBSFS) based on the Vindicator platform. The IDS/ACS must comply with all applicable regulations and protect against various physical threats, providing detection, annunciation, and security for the SCIF resource. This project is broken into two CLINS. CLIN 1 is the design phase and Option CLIN 2 is the installation phase. General project requirements are the same on each CLIN such as contractor responsibilities and project management. Please reference the attached Statement of Objectives (SOO) for additional information.
From Combined Synopsis/Solicitation posted on Sep 02, 2025Notice history
4-
Combined Synopsis/Solicitation Posted Jul 31, 2025
-
Combined Synopsis/Solicitation Posted Aug 05, 2025View changes (1)
- Description: Description was updated
-
Combined Synopsis/Solicitation Posted Aug 27, 2025No changes from previous notice
-
Combined Synopsis/Solicitation LATEST Posted Sep 02, 2025View changes (3)
- Title: Intrusion Detection System for SCIF at NBSFS → Intrusion Detection System for SCIF at NBSFS - Updated Due Date
- Description: Description was updated
- Response Deadline: Sep 02, 2025 → Sep 05, 2025
Details
Award Information
Not yet awarded
Contacts
Agency
Place of Performance
USA