Contacts, documents and full notice history are available with a subscription.
Solicitation SBA Expired 8 notices 4 documents

Intracoastal and Okeechobee Waterway Maintenance Dredging Vicinity of St. Lucie Inlet and Jupiter Inlet, Martin and Palm Beach Counties, Florida W912EP25BA012

Solicitation W912EP25BA012 Copied Notice ID 6cfb3ce0d61544bd819b253c42aaa723 Copied DEPT OF DEFENSE — W074 ENDIST JACKSNVLLE
SAM.gov
Posted
Aug 21, 2025
Deadline
Aug 21, 2025
Set-aside
SBA
NAICS
237990
PSC
Z1KF

Summary

AI-generated · Aug 23, 2025

Maintenance dredging of the Intracoastal Waterway in the Jupiter and St. Lucie Inlet vicinity will be required, with base dredging of Jupiter IWW CUT-P-1 through CUT-P-9 and St. Lucie IWW STA 190+00 CUT-M-1 through STA 5+00 CUT-M-6 plus OWW CUT-OW-1. Excavated material from Jupiter goes to the beach placement area immediately south of Jupiter Inlet; material from St. Lucie goes to the St. Lucie inshore impoundment basin. Incidental work includes endangered species monitoring and turbidity monitoring, with vibration monitoring and beach tilling required at the Jupiter beach site. The contract comprises a base period plus one option, for a total of 200 calendar days after notice to proceed, including 60 days to commence work (110 days for the base and 90 days for the option).

The procurement will be issued electronically on SAM.gov, with bidders required to register as interested vendors to receive amendments and be eligible for award. A pre-bid conference will be conducted via teleconference, and previous notices indicate consolidation of related postings into a single solicitation.

A Pre-Bid Conference will be held via teleconference on 23 July 2025 @ 10:00AM, EDT. Please utilize the link and call information provided below: - LINK: HTTPS://WWW.MICROSOFT.COM/EN-US/MICROSOFT-TEAMS/JOIN-A-MEETING - MEETING ID: 993 750 436 077 / PASSCODE: XX9U9TJ2 - DIAL IN BY PHONE: +1 601-262-2433 / PHONE CONFERENCE ID: 654 841 296# It is requested that an email be sent to Timothy.G.Humphrey@usace.army.mil & Guesley.Leger@usace.army.mil no later than 22 July 2025 at 1:00 PM, EDT to confirm attendance by your organization. DESCRIPTION OF WORK: The project consists of a base and option maintenance dredging the Intracoastal Waterway channel (IWW) in the vicinity of Jupiter (BASE) and St. Lucie (OPTION A) Inlets. These two areas are approximately 16 miles apart along the IWW channel. The area to be dredged at St. Lucie Inlet is referred to locally as the Crossroads because it is the junction of the IWW, Okeechobee Waterway (OWW), and the St. Lucie Inlet channels. The Jupiter Inlet portion of the project consists of maintenance dredging IWW CUT-P-1 through CUT-P-9. The excavated material will be placed in the beach placement area immediately south of Jupiter Inlet. The St. Lucie Inlet work consists of maintenance dredging IWW STA 190+00 CUT-M-1 through STA 5+00 CUT-M-6 and OWW CUT-OW-1. Excavated material will be placed in the St. Lucie inshore impoundment basin. Incidental work for both project areas will include endangered species monitoring, turbidity monitoring. Vibration monitoring and beach tilling will be required at the Jupiter Inlet beach site. NAICS Code 237990, Dredging and Surface Cleanup Activities. The Small Business Standard is $37 million The Magnitude of construction is $5,000,000.00 - $10,000,000.00. This project will have an estimated period of performance of 200 calendar days after issuance of Notice to Proceed (NTP), including 60 calendar days to commence work. The total completion time of 200 calendar days includes the following: 110 Calendar days for the BASE (Incl. Commencement & Demob) 90 Calendar Days for OPTION A THIS IS A TOTAL SMALL BUSINESS SET-ASIDE REQUIREMENT. Solicitation will be issued in electronic format only and will be posted on the Sam.gov website at https://sam.gov/. In order to receive notification of any amendments to this solicitation, interested vendors must REGISTER AS AN INTERESTED VENDOR on the Sam.gov website at https://sam.gov/. If you are not registered, the Government is not responsible with providing you with notification of any amendments to this solicitation. You must be registered in the System for Award Management (SAM) in order to be eligible to receive an award from this solicitation. For additional information, please call 866-606-8220 or visit the SAM website at https://www.sam.gov/.

From Presolicitation posted on Jun 27, 2025

NOTICE OF CONSOLIDATION

From Special Notice posted on Jul 10, 2025

The project, which is located in Martin and Palm Beach Counties, Florida, will be divided into a base and one option. Work associated with the subject requirement will consist of maintenance dredging from the Intracoastal Waterway channel (IWW) in the vicinity of Jupiter and St. Lucie Inlets. These two areas are approximately 16 miles apart along the IWW channel. The area to be dredged at St. Lucie Inlet is referred to locally as the Crossroads because it is the junction of the IWW, Okeechobee Waterway (OWW), and the St. Lucie Inlet channels. The Jupiter Inlet portion of the project consists of maintenance dredging IWW CUT-P-1 through CUT-P-9. The excavated material will be placed in the beach placement area immediately south of Jupiter Inlet. The St. Lucie Inlet work consists of maintenance dredging IWW STA 190+00 CUT-M-1 through STA 5+00 CUT-M-6 and OWW CUT-OW-1. Excavated material will be placed in the St. Lucie inshore impoundment basin. Incidental work for both project areas will include endangered species monitoring, turbidity monitoring. Vibration monitoring and beach tilling will be required at the Jupiter Inlet beach site.

From Solicitation posted on Jul 18, 2025

The project, which is located in Martin and Palm Beach Counties, Florida, will be divided into a base and one option. Work associated with the subject requirement will consist of maintenance dredging from the Intracoastal Waterway channel (IWW) in the vicinity of Jupiter and St. Lucie Inlets. These two areas are approximately 16 miles apart along the IWW channel. The area to be dredged at St. Lucie Inlet is referred to locally as the Crossroads because it is the junction of the IWW, Okeechobee Waterway (OWW), and the St. Lucie Inlet channels. The Jupiter Inlet portion of the project consists of maintenance dredging IWW CUT-P-1 through CUT-P-9. The excavated material will be placed in the beach placement area immediately south of Jupiter Inlet. The St. Lucie Inlet work consists of maintenance dredging IWW STA 190+00 CUT-M-1 through STA 5+00 CUT-M-6 and OWW CUT-OW-1. Excavated material will be placed in the St. Lucie inshore impoundment basin. Incidental work for both project areas will include endangered species monitoring, turbidity monitoring. Vibration monitoring and beach tilling will be required at the Jupiter Inlet beach site.

From Solicitation posted on Jul 21, 2025

A Pre-Bid Conference will be held via teleconference on 30 July 2025 @ 10:00AM, EDT. Please utilize the link and call information provided below: - LINK: HTTPS://WWW.MICROSOFT.COM/EN-US/MICROSOFT-TEAMS/JOIN-A-MEETING - MEETING ID: 993 750 436 077 / PASSCODE: xx9U9tj2 - DIAL IN BY PHONE: +1 601-262-2433 / PHONE CONFERENCE ID: 654 841 296# It is requested that an email be sent to Timothy.G.Humphrey@usace.army.mil & Guesley.Leger@usace.army.mil no later than 22 July 2025 at 1:00 PM, EDT to confirm attendance by your organization. DESCRIPTION OF WORK: The project consists of a base and option maintenance dredging the Intracoastal Waterway channel (IWW) in the vicinity of Jupiter (BASE) and St. Lucie (OPTION A) Inlets. These two areas are approximately 16 miles apart along the IWW channel. The area to be dredged at St. Lucie Inlet is referred to locally as the Crossroads because it is the junction of the IWW, Okeechobee Waterway (OWW), and the St. Lucie Inlet channels. The Jupiter Inlet portion of the project consists of maintenance dredging IWW CUT-P-1 through CUT-P-9. The excavated material will be placed in the beach placement area immediately south of Jupiter Inlet. The St. Lucie Inlet work consists of maintenance dredging IWW STA 190+00 CUT-M-1 through STA 5+00 CUT-M-6 and OWW CUT-OW-1. Excavated material will be placed in the St. Lucie inshore impoundment basin. Incidental work for both project areas will include endangered species monitoring, turbidity monitoring. Vibration monitoring and beach tilling will be required at the Jupiter Inlet beach site. NAICS Code 237990, Dredging and Surface Cleanup Activities. The Small Business Standard is $37 million The Magnitude of construction is $5,000,000.00 - $10,000,000.00. This project will have an estimated period of performance of 200 calendar days after issuance of Notice to Proceed (NTP), including 60 calendar days to commence work. The total completion time of 200 calendar days includes the following: 110 Calendar days for the BASE (Incl. Commencement & Demob) 90 Calendar Days for OPTION A THIS IS A TOTAL SMALL BUSINESS SET-ASIDE REQUIREMENT. Solicitation will be issued in electronic format only and will be posted on the Sam.gov website at https://sam.gov/. In order to receive notification of any amendments to this solicitation, interested vendors must REGISTER AS AN INTERESTED VENDOR on the Sam.gov website at https://sam.gov/. If you are not registered, the Government is not responsible with providing you with notification of any amendments to this solicitation. You must be registered in the System for Award Management (SAM) in order to be eligible to receive an award from this solicitation. For additional information, please call 866-606-8220 or visit the SAM website at https://www.sam.gov/.

From Presolicitation posted on Jul 22, 2025

The project, which is located in Martin and Palm Beach Counties, Florida, will be divided into a base and one option. Work associated with the subject requirement will consist of maintenance dredging from the Intracoastal Waterway channel (IWW) in the vicinity of Jupiter and St. Lucie Inlets. These two areas are approximately 16 miles apart along the IWW channel. The area to be dredged at St. Lucie Inlet is referred to locally as the Crossroads because it is the junction of the IWW, Okeechobee Waterway (OWW), and the St. Lucie Inlet channels. The Jupiter Inlet portion of the project consists of maintenance dredging IWW CUT-P-1 through CUT-P-9. The excavated material will be placed in the beach placement area immediately south of Jupiter Inlet. The St. Lucie Inlet work consists of maintenance dredging IWW STA 190+00 CUT-M-1 through STA 5+00 CUT-M-6 and OWW CUT-OW-1. Excavated material will be placed in the St. Lucie inshore impoundment basin. Incidental work for both project areas will include endangered species monitoring, turbidity monitoring. Vibration monitoring and beach tilling will be required at the Jupiter Inlet beach site.

From Solicitation posted on Jul 31, 2025

The project, which is located in Martin and Palm Beach Counties, Florida, will be divided into a base and one option. Work associated with the subject requirement will consist of maintenance dredging from the Intracoastal Waterway channel (IWW) in the vicinity of Jupiter and St. Lucie Inlets. These two areas are approximately 16 miles apart along the IWW channel. The area to be dredged at St. Lucie Inlet is referred to locally as the Crossroads because it is the junction of the IWW, Okeechobee Waterway (OWW), and the St. Lucie Inlet channels. The Jupiter Inlet portion of the project consists of maintenance dredging IWW CUT-P-1 through CUT-P-9. The excavated material will be placed in the beach placement area immediately south of Jupiter Inlet. The St. Lucie Inlet work consists of maintenance dredging IWW STA 190+00 CUT-M-1 through STA 5+00 CUT-M-6 and OWW CUT-OW-1. Excavated material will be placed in the St. Lucie inshore impoundment basin. Incidental work for both project areas will include endangered species monitoring, turbidity monitoring. Vibration monitoring and beach tilling will be required at the Jupiter Inlet beach site.

From Solicitation posted on Aug 12, 2025

The project, which is located in Martin and Palm Beach Counties, Florida, will be divided into a base and one option. Work associated with the subject requirement will consist of maintenance dredging from the Intracoastal Waterway channel (IWW) in the vicinity of Jupiter and St. Lucie Inlets. These two areas are approximately 16 miles apart along the IWW channel. The area to be dredged at St. Lucie Inlet is referred to locally as the Crossroads because it is the junction of the IWW, Okeechobee Waterway (OWW), and the St. Lucie Inlet channels. The Jupiter Inlet portion of the project consists of maintenance dredging IWW CUT-P-1 through CUT-P-9. The excavated material will be placed in the beach placement area immediately south of Jupiter Inlet. The St. Lucie Inlet work consists of maintenance dredging IWW STA 190+00 CUT-M-1 through STA 5+00 CUT-M-6 and OWW CUT-OW-1. Excavated material will be placed in the St. Lucie inshore impoundment basin. Incidental work for both project areas will include endangered species monitoring, turbidity monitoring. Vibration monitoring and beach tilling will be required at the Jupiter Inlet beach site.

From Solicitation posted on Aug 21, 2025

Notice history

8
  1. Presolicitation Posted Jun 27, 2025 View
  2. Special Notice Posted Jul 10, 2025
    • Description: Description was updated
    • Notice Type: PresolicitationSpecial Notice
    • Response Deadline: Aug 21, 2025Jul 15, 2025
  3. Solicitation Posted Jul 18, 2025
    • Title: INTRACOASTAL & OKEECHOBEE WATERWAY MAINTENANCE DREDGING VICINITY OF ST. LUCIE INLET AND JUPITER INLET MARTIN AND PALM BEACH COUNTIES, FLORIDAIntracoastal and Okeechobee Waterway Maintenance Dredging Vicinity of St. Lucie Inlet and Jupiter Inlet, Martin and Palm Beach Counties, Florida
    • Description: Description was updated
    • Notice Type: Special NoticeSolicitation
    • Response Deadline: Jul 15, 2025Aug 21, 2025
  4. Solicitation Posted Jul 21, 2025
    No changes from previous notice
  5. Presolicitation Posted Jul 22, 2025
    • Title: Intracoastal and Okeechobee Waterway Maintenance Dredging Vicinity of St. Lucie Inlet and Jupiter Inlet, Martin and Palm Beach Counties, FloridaINTRACOASTAL & OKEECHOBEE WATERWAY MAINTENANCE DREDGING VICINITY OF ST. LUCIE INLET AND JUPITER INLET MARTIN AND PALM BEACH COUNTIES, FLORIDA
    • Description: Description was updated
    • Notice Type: SolicitationPresolicitation
  6. Solicitation Posted Jul 31, 2025
    • Title: INTRACOASTAL & OKEECHOBEE WATERWAY MAINTENANCE DREDGING VICINITY OF ST. LUCIE INLET AND JUPITER INLET MARTIN AND PALM BEACH COUNTIES, FLORIDAIntracoastal and Okeechobee Waterway Maintenance Dredging Vicinity of St. Lucie Inlet and Jupiter Inlet, Martin and Palm Beach Counties, Florida
    • Description: Description was updated
    • Notice Type: PresolicitationSolicitation
  7. Solicitation Posted Aug 12, 2025
    No changes from previous notice
  8. Solicitation LATEST Posted Aug 21, 2025
    No changes from previous notice

Details

Solicitation number W912EP25BA012
Notice ID 6cfb3ce0d61544bd819b253c42aaa723
Notice type Solicitation
Product / Service (PSC) Z1KF
NAICS 237990
Archive date Sep 18, 2025

Award Information

Not yet awarded

Contacts

primary
Timothy G. Humphrey

Email

Agency

DEPT OF DEFENSE
DEPT OF THE ARMY
US ARMY CORPS OF ENGINEERS
ENGINEER DIVISION SOUTH ATLANTIC
W074 ENDIST JACKSNVLLE

Place of Performance

MARTIN AND PALM BEACH COUNTIES, FLORIDA
34972

Dates

Posted Aug 21, 2025 11 months ago
Last Updated Aug 06, 2026 1 day ago
Due Aug 21, 2025 11 months ago