Interagency Natural Resource Center (INRC) Heating, Ventilation, Air Conditioning (HVAC) Preventative Maintenance (PM) 1284LL25Q0012
Summary
AI-generated · Aug 27, 2025Provide all labor to perform maintenance and repair services on the HVAC and refrigeration systems at the INRC buildings, covering monthly, quarterly, semi-annual, and annual preventative maintenance and supplying all incidentals and materials.
Submit a service report to the COR after each service visit, detailing any corrective maintenance required.
This requirement is for the Contractor to provide all labor to complete maintenance and repair services on the Heating, Ventilation, Air Conditioning (HVAC) and refrigeration systems at the Interagency Natural Resource Center (INRC) buildings. Contractor will be required to complete all Monthly, Quarterly, Semi-Annual, and Annual preventative maintenance, providing all incidentals and materials. The Contractor shall submit a service report to the Contracting Officer s Representative (COR) at the completion of each service visit and with the service report, the Contractor shall include corrective maintenance required.
From Combined Synopsis/Solicitation posted on Aug 26, 2025This requirement is for the Contractor to provide all labor to complete maintenance and repair services on the Heating, Ventilation, Air Conditioning (HVAC) and refrigeration systems at the Interagency Natural Resource Center (INRC) buildings. Contractor will be required to complete all Monthly, Quarterly, Semi-Annual, and Annual preventative maintenance, providing all incidentals and materials. The Contractor shall submit a service report to the Contracting Officer’s Representative (COR) at the completion of each service visit and with the service report, the Contractor shall include corrective maintenance required. Amendment 0001 adds some specifications in the Performance Work Statement (PWS) document. Updated PWS and SF-30 will be uploaded as a result. Changes to the PWS are indicated by a vertical line in the left margin of the document. The response date has not changed.
From Combined Synopsis/Solicitation posted on Sep 12, 2025Notice history
2-
-
Combined Synopsis/Solicitation LATEST Posted Sep 12, 2025View changes (1)
- Description: Description was updated
Details
Award Information
Not yet awarded
Contacts
Phone
Agency
Place of Performance
USA