Intent to Solicit one source for one (1) pair of press platens to be manufactured and installed to replace damaged platens on a Collin Lab and Pilor Solutions GmbH manufactured Press 500 S equipment. W911QX25Q0111
Summary
AI-generated · Aug 29, 2025Replacement must be a single pair of press platens (one upper, one lower) for the Collin Press 500 S, to be manufactured and installed as a direct replacement for damaged platens on the equipment owned by Sciences of Extreme Materials Division, Polymers Branch. The platens must be compatible with the existing Collin Press 500 S and its onboard control system, enabling heating and cooling control, and must be installable without modification.
They must withstand 2000 N of force on a 7 x 7 mold using a 1 inch thick steel caul plate (18 x 18) without damage or permanent deformation, and be capable of repeated cycles from room temperature up to 450°C. Both upper and lower platens must have independent temperature control. The contract includes on-site installation, start-up, and training after installation.
DEVCOM ARL requires a pair of press platens to replace damaged platens on the Collin Press 500 S equipment owned by Sciences of Extreme Materials Division, Polymers Branch. The following are required: Shall have one (1) pair (one upper and one lower) of press platens The platens shall be compatible with existing Collin Press 500 S equipment and shall have the ability to be directly installed. The platens shall be compatible with the existing control system of the Collin Press 500 S, such that the onboard control system can control heating and cooling of the press platens. The platens shall be capable to withstand 2000N force on a 7 x 7 mold, while using a 1 thick steel caul plate measuring 18 x 18 without damage or permanent deformation The platens shall be capable to withstand the above pressure conditions through repeated press cycles from room temperature up to 450oCelsius. The upper and lower platens shall be capable of independent temperature control Shall include on-site installation, start up, and training after the parts have been installed.
From Combined Synopsis/Solicitation posted on Aug 28, 2025Notice history
1-
Combined Synopsis/Solicitation LATEST Posted Aug 28, 2025
Details
Award Information
Not yet awarded
Contacts
Phone
Phone
Agency
Place of Performance
USA