INTENT TO AWARD OILY WASTE OFFLOAD 70Z085Q20394
Summary
AI-generated · Aug 24, 2025Remove up to 9,000 gallons of waste oil and oily water from USCGC HEALY, with disposal in full compliance with all applicable federal, state, and local laws and regulations. Offloading can be performed using the cutter’s installed pumping system through shore tie connections beside the fueling station, with an approximately 100-foot distance to the loading truck; this work is prompted by oily water buildup in storage tanks following a fire main rupture.
Contractors must verify their capability to perform the offload once the cutter moors in Dutch Harbor. The work will take place at Municipal Pier, 1171 Airport Beach Rd, Dutch Harbor, AK. Note that work may begin on the first day of the cutter’s arrival.
Scope of Work: CGC HEALY Oily Waste Offload Background: Significant amount of oily water in oily waste storage tanks due to a fire main rupture. Statement of Work: Vendor shall remove up to 9,000 gallons of waste oil and oily water from USCGC HEALY.?Vendor shall dispose of all removed fluids in accordance with all applicable Federal, state, and local laws, ordinances, regulations. Cutter engineers can pump off using their installed system and it would be from their shore tie connections right next to the fueling station. The approximate connection from cutter to loading truck is 100 feet. Request contractors verify their capability once the cutter moors in Dutch Harbor. GFE: None POP: 7/11/2025-07/13/2025*note 1 Note 1 - work can begin on the first day of cutter arrival. Location of work to be performed: Municipal Pier at 1171 Airport Beach Rd, Dutch Harbor, AK 99692? ?Key USCG Personnel Information The primary unit POC is Ryun Konze, USCGC Healy, (707) 815-7469, Ryun.J.Konze@uscg.mil. Secondary POC is LT Christopher Maytum christopher.j.maytum@uscg.mil
From Special Notice posted on Jul 03, 2025Notice history
1Details
Award Information
Not yet awarded
Contacts
Phone
Phone
Agency
Place of Performance
USA