Integrated Aircraft Survivability Equipment A-C Aft Sponson Interference Modifications N0001924F0014P00014
Summary
AI-generated · Jan 13, 2026Procurement of Integrated Aircraft Survivability Equipment (IASE) A-C Aft Sponson Interference modifications for MV-22 aircraft that had the Aft Sponson Fuel Cell installed prior to the IASE Configuration A to C Kit, to resolve interference and ensure compatibility with the IASE system.
Awarded on a sole-source basis to the Bell Boeing Joint Project Office under applicable competition statutes and FAR authority, as Bell Boeing is the sole designer/developer/producer with the necessary knowledge and complete engineering data. The contract type is Cost Plus Fixed Fee due to uncertainties in performance, with an award amount of $132,944.
Related Notice: N00019-25-RFPREQ-APM275-0597 Naval Air Systems Command, V-22 Joint Program Office, PMA-275 issued Delivery Order modification N0001924F0014-P00014 under Basic Ordering Agreement N0001922G0002 to the Bell Boeing Joint Project Office on a sole-source basis for the procurement of Integrated Aircraft Survivability Equipment (IASE) A-C Aft Sponson Interference modifications for the MV-22 aircraft that have had the Aft Sponson Fuel Cell installed prior to the installation of the IASE Configuration A to Configuration C A-Kit. This action was awarded on a sole source basis to the Bell Boeing Joint Program Office in accordance with the statutory authority permitting other than full and open competition under Title 10 U.S.C. 3204(a)(1), as implemented by FAR Part 6.302-1, "Only one responsible source and no other supplies or services will satisfy agency requirements." Bell Boeing is the sole designer, developer, and producer of the V-22 Tiltrotor aircraft and is the only known source that possesses the requisite knowledge and expertise required to perform this effort. Also, Bell Boeing is the only source that possesses the totality of engineering and technical data required to perform this effort. This Delivery Order modification includes a Cost Plus Fixed Fee Contract Line Item Number. Cost Plus Fixed Fee was selected because there are uncertainties involved in contract performance that do not permit costs to be estimated with sufficient accuracy to use any type of fixed price.
From Award Notice posted on Jan 12, 2026Notice history
1Details
Award Information
Award Notices
Posted: Jan 12, 2026
Related Notice: N00019-25-RFPREQ-APM275-0597 Naval Air Systems Command, V-22 Joint Program Office, PMA-275 issued Delivery Order modification N0001924F0014-P00014 under Basic Ordering Agreement N0001922G0002 to the Bell Boeing Joint Project Office on a sole-source basis for the procurement of Integr...
Awardees
| Company Name | UEI | CAGE Code | Location |
|---|---|---|---|
| BELL BOEING JOINT PROJECT OFFICE | JHFZTG8ZC9V2 | 3B1R2 | Amarillo, TX |