Contacts, documents and full notice history are available with a subscription.
Combined Synopsis/Solicitation SBA Expired 2 notices 4 documents

Insulated Bldg. 141 Roll Up Doors W50S6M-25-Q-A016

Solicitation W50S6M-25-Q-A016 Copied Notice ID 48ea0b7c249540b39eeb92f4c4137b2f Copied DEPT OF DEFENSE — W7MT USPFO ACTIVITY ALANG 117
SAM.gov
Posted
Aug 20, 2025
Deadline
Aug 21, 2025
Set-aside
SBA
NAICS
332321
PSC
5670

Summary

AI-generated · Aug 24, 2025

Remove three existing roll-up doors at Building 141 and install two TKO CW Series Cruiserweight Impactable doors plus one insulated roll-up door. Because a crane is already in the middle bay opening, clearance and hardware install constraints require proceeding with a single roll-up door rather than a sectional door. The project covers all labor, materials, equipment, supervision, disposal of the old doors, and any necessary structural adjustments. New doors must match the Cruiserweight Impactable TKO door installed in Building 190, featuring high R-23 insulation, a tight perimeter weather seal with a double loop seal, moisture resistance, and a 1-3/4" thick insulated foam core.

An updated notice notes that RFI answers were provided on 20 Aug 2025, confirming details in the Statement of Requirement and Solicitation Synopsis Documents; no additional changes to the scope are described beyond that clarification.

Roll-Up Doors Description 1.2.1.1 This project involves the removal of three existing roll-up doors and the installation of two TKO CW Series Cruiserweight Impactable doors and one insulated roll-up door at Building 141. With a crane already installed within the middle bay door opening, preventing the necessary clearance and hardware installation, we are proceeding with a single roll-up door instead of a sectional door. The work includes all labor, materials, equipment, and supervision necessary for the complete and functional installation of the new doors, including proper disposal of the old doors and any necessary adjustments to the existing structure. New doors must be consistent with already installed Cruiserweight Impactable TKO door in Bldg. 190 (high R-23 value in temperature-controlled environments and includes a tight perimeter weather seal with a double loop seal to prevent energy loss, moisture-resistant, 1-3/4" thick insulated foam core panel insulated doors specifications). Dimensions and all other information can be found in the Statement of Requirment and Solicitation Synopsis Documents.

From Combined Synopsis/Solicitation posted on Aug 05, 2025

RFI answers 20 Aug 2025 Roll-Up Doors Description 1.2.1.1 This project involves the removal of three existing roll-up doors and the installation of two TKO CW Series Cruiserweight Impactable doors and one insulated roll-up door at Building 141. With a crane already installed within the middle bay door opening, preventing the necessary clearance and hardware installation, we are proceeding with a single roll-up door instead of a sectional door. The work includes all labor, materials, equipment, and supervision necessary for the complete and functional installation of the new doors, including proper disposal of the old doors and any necessary adjustments to the existing structure. New doors must be consistent with already installed Cruiserweight Impactable TKO door in Bldg. 190 (high R-23 value in temperature-controlled environments and includes a tight perimeter weather seal with a double loop seal to prevent energy loss, moisture-resistant, 1-3/4" thick insulated foam core panel insulated doors specifications). Dimensions and all other information can be found in the Statement of Requirment and Solicitation Synopsis Documents.

From Combined Synopsis/Solicitation posted on Aug 20, 2025

Notice history

2
  1. Combined Synopsis/Solicitation Posted Aug 05, 2025 View
  2. Combined Synopsis/Solicitation LATEST Posted Aug 20, 2025
    • Description: Description was updated

Details

Solicitation number W50S6M-25-Q-A016
Notice ID 48ea0b7c249540b39eeb92f4c4137b2f
Notice type Combined Synopsis/Solicitation
Product / Service (PSC) 5670
NAICS 332321
Place of performance Birmingham, Alabama
Archive date Sep 05, 2025

Award Information

Not yet awarded

Contacts

primary
Jonathan Werkmeister

Email

Phone

secondary
William K. Hall

Email

Phone

Agency

DEPT OF DEFENSE
DEPT OF THE ARMY
NATIONAL GUARD BUREAU
W7MT USPFO ACTIVITY ALANG 117

Place of Performance

Birmingham, Alabama 35217
USA

Dates

Posted Aug 20, 2025 11 months ago
Last Updated Aug 06, 2026 1 day ago
Due Aug 21, 2025 11 months ago