Insulate PACT Roof Duct 610A4-26-509 36C25026Q0508
Summary
AI-generated · May 27, 2026Contractor will provide all labor, equipment, materials, and supervision to replace approximately 50 feet of duct insulation on the PACT roof of Building 1 at the VA Northern Indiana Health Care Systems Fort Wayne Campus. The work requires field verification of dimensions, removal and disposal of damaged insulation, installation of 2 FSK fiberglass duct board, re-jacketing the entire duct with an aluminum guard, and sealing the insulation to prevent water intrusion, all while following OSHA safety requirements. Work must be completed within 60 calendar days from receipt of the notice to proceed.
Contractor will provide all labor, equipment, materials, and supervision necessary to replace approximately 50 feet of duct insulation on the PACT roof of Building 1. Contractor shall field verify all dimensions. Shall remove and dispose of existing identified damaged insulation. Shall install 2 FSK fiberglass duct board. Shall rejacket the whole duct with aluminum guard. Shall seal insulation to prevent water intrusion. Shall follow all pertinent OSHA safety requirements. All work to be completed at the VA- Northern Indiana Health Care Systems Fort Wayne Campus, 2121 Lake Avenue. Fort Wayne, IN 46805-5100. Work to be completed within 60 calendar days from contractor receipt of notice to proceed.
From Solicitation posted on May 26, 2026Notice history
1Details
Award Information
Not yet awarded
Documents
8Contacts
Agency
Place of Performance
USA