Contacts, documents and full notice history are available with a subscription.
Presolicitation SBA Expired 1 notice 1 document

Installation of Custom Turtle Shell Equipment Protection Shields for Laboratory Equipment – Building 10, Tenth Floor B & N Corridor 75N98026Q00835

Solicitation 75N98026Q00835 Copied Notice ID a37bc60bc79c405db346c4cb63be27f5 Copied HEALTH AND HUMAN SERVICES, DEPARTMENT OF — NATIONAL INSTITUTES OF HEALTH OLAO
SAM.gov
Posted
Jul 20, 2026
Deadline
Jul 30, 2026
Set-aside
SBA
NAICS
332999
PSC
R499

Summary

AI-generated · Jul 21, 2026

Install sixteen custom turtle shell equipment protection shields in Building 10, Tenth Floor, B & N Corridor to protect valuable laboratory equipment from water damage due to recurring leaks and floods. The shields aim to reduce downtime, minimize repairs, and preserve the integrity and continuity of research operations by creating a protective barrier and maintaining a stable, reliable testing environment; installation must be followed by thorough testing to ensure proper operation.

Bidders should perform onsite measurements to ensure precise fit, install the shields, and verify conformity to the specified equipment dimensions. Work must adhere to NIH Fire Code policies; prior experience with NIH shielding installations (notably NICHD) is advantageous. Additional details are provided in Proposal #260644.

Requirements: SCOPE: The requested service under this contract is to install sixteen (16) equipment protection shields in Building 10, Tenth Floor, B & N Corridor. The installation of these protective shields will help safeguard valuable laboratory equipment from potential water and leak damage. Over the past several months, building 10 has experienced multiple flooding and leak-related incidents that have negatively impacted laboratory operations and placed critical research equipment at risk. Installing these equipment protection shields will improve the overall efficiency and continuity of laboratory operations by acting as a protective barrier against water damage. This will help prevent interruptions to research activities, reduce the need for costly equipment repairs, and ensure uninterrupted scientific progress. In addition, the shields will help maintain a stable and protected research environment, ensuring the reliability and accuracy of experimental work within Building 10, Tenth Floor, B & N Corridor. Please see the attached Proposal # 260644 for further details. BACKGROUND INFORMATION: The contractor has previously provided protective shielding installations for various institutes across NIH, including the National Institute of Child Health and Human Development (NICHD). NICHD selected this contractor due to its strong reputation for providing precise and reliable installations that protect sensitive laboratory equipment. The contractor conducts onsite assessments to obtain accurate measurements and ensure all installations meet the strict operational requirements of NIH facilities. In addition, the contractor strictly adheres to all applicable NIH Fire Code policies during each installation. Building 10 has experienced recurring leaks and flooding issues for many years, resulting in damage to laboratory equipment and disruptions to important research activities. By utilizing the contractor s protective shielding products, the laboratory equipment located within the Tenth Floor B & N Corridor can be better protected against future water-related incidents. This proactive solution will help preserve valuable scientific equipment, minimize downtime, protect research integrity, and allow laboratory operations to continue without interruption. PURPOSE AND OBJECTIVES OF THE ACQUISITION: The purpose of the installation of the equipment protection shields is to protect valuable lab equipment from water damage and improve the progress of lab work. Additionally, the shields will assure the dependability and accuracy of experimental results by establishing an operational laboratory without any accidents stopping it. The purchase of this equipment protection shields essentially serves the purposes of equipment preservation and promoting an effective lab environment within Building 10, Tenth Floor, B & N Corridor. SERVICE AGREEMENT: The contractor shall install the equipment protection shields within Building 10, Tenth Floor, B & N Corridor. Install and thoroughly test the shields to ensure they operate correctly. The contractor must carefully verify that the shields match the measurements specified for the equipment. This attention to detail guarantees proper fit and optimal performance of the shields, providing the necessary protection for the lab equipment.

From Presolicitation posted on Jul 20, 2026

Notice history

1
  1. Presolicitation LATEST Posted Jul 20, 2026 View

Details

Solicitation number 75N98026Q00835
Notice ID a37bc60bc79c405db346c4cb63be27f5
Notice type Presolicitation
Product / Service (PSC) R499
NAICS 332999
Place of performance Bethesda, Maryland
Archive date Jul 31, 2026

Award Information

Not yet awarded

Documents

1
View on SAM.gov

Contacts

primary
John Burton

Email

Agency

HEALTH AND HUMAN SERVICES, DEPARTMENT OF
NATIONAL INSTITUTES OF HEALTH
NATIONAL INSTITUTES OF HEALTH OLAO

Place of Performance

Bethesda, Maryland 20892
USA

Dates

Posted Jul 20, 2026 2 weeks ago
Last Updated Aug 06, 2026 1 day ago
Due Jul 30, 2026 1 week ago