Install Fiber in Buildings 208 to 209 W91QF425Q0037
Summary
AI-generated · Sep 06, 2025Install fiber optic cable between Building 209 and Building 208 as specified: in Building 209’s communication room, install an LC adapter panel in the northwest corner next to the EDU switch rack; route the fiber along the upper wall to the conduit entry, using the pre-installed 60-foot underground conduit and its pull string to guide the cable, while keeping both conduit end seals intact to preserve waterproofing and firestop integrity. In Building 208 (Theater), enter the mechanical room, route the cable through the wall to the left of the entry, secure it along the wooden ceiling in the crawl space beneath the theater for about 100 feet, and transition the cable vertically at the north end through an unused airshaft into the lobby before the projector room. For termination, install a 6-port LC fiber adapter panel near an electrical outlet on the south side of the projector room lobby and mount the cable inside a low-profile, switch-depth wall-mount mini rack enclosure.
Fiber Optic Cable Installation Requirements 1. Starting Point (Building 209 - Communication Room): o Install an LC adapter panel in the northwest corner of the communication room, adjacent to the .EDU switch rack. o Route the fiber optic cable along the upper wall, adjacent to the adapter panel, into the next room where the conduit entry is located. 2. Conduit Routing: o Utilize the pre-installed 60-foot underground conduit connecting Building 209 and Building 208. o Use the pre-installed pull string/rope/tape to guide the fiber optic cable through the conduit. o Ensure the existing duct seals at both conduit ends remain intact to maintain waterproofing and firestopping standards. 3. Routing in Building 208 (Theater): o Upon entry into the mechanical room, route the fiber cable through the wall to the left of its entry point. o Secure the cable along the wooden ceiling within the crawl space beneath the theater for approximately 100 feet. o Transition the cable vertically at the north end of the building through an unused airshaft into the lobby preceding the projector room. 4. Termination and Enclosure (Projector Room Lobby): o Install a 6-port LC fiber adapter panel adjacent to an electrical outlet on the south side of the projector room lobby. o Mount the fiber optic cable in the specified low-profile, switch-depth wall-mount mini rack enclosure.
From Combined Synopsis/Solicitation posted on Sep 03, 2025Amendment #001 - a. Extending RFP submittal date to 10 am. CST 23 September 2025. b. Vendor questions and answ ers included as an attachment. c. Update Period of Performance "Schedule" - 30 SEP 2025 - 30 APR 2026. d. Include 52.212-1 Instructions to Offerors (Addendum). e. All other terms and conditions remain unchanged.
From Combined Synopsis/Solicitation posted on Sep 11, 2025PoM Install Fiber Building(s) 208-209
From Award Notice posted on Sep 30, 2025Notice history
3-
Combined Synopsis/Solicitation Posted Sep 03, 2025
-
Combined Synopsis/Solicitation Posted Sep 11, 2025View changes (3)
- Title: Install Fiber in Buildings 208 to 209 → Amendment-001 - Install Fiber Building(s) 208-209
- Description: Description was updated
- Response Deadline: Sep 18, 2025 → Sep 23, 2025
-
Award Notice LATEST Posted Sep 30, 2025
Details
Award Information
Award Notices
Posted: Sep 30, 2025
PoM Install Fiber Building(s) 208-209
Awardees
| Company Name | UEI | CAGE Code | Location |
|---|---|---|---|
| Atlantic For Services Inc | DY1NN7DAGFF4 | 9VEW8 | Stoneham, MA |
Contacts
Phone
9136841610
Phone
9136841610
Agency
Place of Performance
USA